Permit #2014120643

Permit Details

Status: COED

Parcel Id: 41-11-31-4975-00000-0010
COMMERCIAL SQUARE FOOTAGE: 4293 sqft
Total Square Footage: 4293 sqft
Block: 00000
Subdivision: 2272 - ISLAND WALK AT PALM COAST
Job Phone: 727-938-9719
Location Address: 250 PALM COAST PKWY NE
Type: BC - BUILDING COMMERCIAL
Issue Date: 05/22/2015
NOC: RECORDED
Applicant name: MICHAEL S BEAUSIR
Owner: BRANCH ISLAND WALK ASSOCIATES LP

Address

3340 PEACHTREE ROAD NE

ATLANTA, GA 30326

Address

SUITE 600

ATLANTA, GA 30326

Lot: 0010
Contracted Stated Job Value: ¤261,873.00
Job Description: BLDG. C / 700 - SHELL BUILDING 4,293 SQ FT
Type: CN

Contractor

HAWKINS CONSTRUCTION INC
Status Location Address State License Number Phone Fax
CANCEL

1430 L AND R INDUSTRIAL BLVD

TARPON SPRINGS, FL 34689

CGC061198 (Exp: 08/31/2018) 727-938-9719 727-938-3208

Sub Contractors

ANDREW JASON RODGERS
Status Location Address State License Number Phone Fax
CANCEL

6915 BUSINESS PARK BOULEVARD

NORTH JACKSONVILLE, FL 32256

CFC057050 (Exp: 08/31/2022) 904-765-7964 904-765-9805
ROBERT PICKARD
Status Location Address State License Number Phone Fax
CANCEL

12503 CREEKSIDE DRIVE

LARGO, FL 33773

EC0000488 (Exp: 08/31/2018) 727-507-0997 727-533-8906
MICHAEL L RUSS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 730

DUNNELLON , FL 34432

CCC057482 (Exp: 08/31/2026) 352-489-4274 352-489-3466

Inspection History

Type Request Date Result Inspector
U - UTILITY COMMERCIAL FINAL 01/19/2016 APPROVED DSPENCER
BUILDING FINAL 01/06/2016 FINAL APPROVED CMINI
Note: THIS IS A REINSPECTION
BUILDING FINAL 11/04/2015 CANCELLED BY APPLICANT CMINI
Note: Inspection Resulted at 11/4/2015 1:59:42 PM NOT READY
FIRE FINAL 11/03/2015 APPROVED JHINDMAN
PLUMBING FINAL 10/30/2015 APPROVED CMINI
BUILDING FINAL 10/30/2015 CANCELLED BY APPLICANT AIRS WEB
FIREWALL 10/30/2015 CANCELLED BY APPLICANT CMINI
FIRE FINAL 10/30/2015 CANCELLED BY APPLICANT AIRS WEB
ELECTRIC FINAL 10/27/2015 FINAL APPROVED RMARTIN
ELECTRIC - EARLY POWER 10/27/2015 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 10/27/2015 2:37:02 PM SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:34
ELECTRIC 2ND ROUGH 10/27/2015 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
GRAVITY SEWER 10/22/2015 APPROVED CMINI
ELECTRIC 1ST ROUGH 10/14/2015 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
LINTEL 10/14/2015 APPROVED CMINI
ABOVE CEILING 10/14/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 10/14/2015 1:46:10 PM N/A
ELECTRIC 2ND ROUGH 10/09/2015 PARTIALLY APPROVED RMARTIN
Note: Inspection Resulted at 10/9/2015 10:38:41 AM SERVICE GROUND AND GROUND RODS
STOREFRONT 10/06/2015 APPROVED DROCKWELL
Note: Inspection Resulted at 10/6/2015 2:54:06 PM BLDG C SHELL
ELECTRIC 2ND ROUGH 09/28/2015 APPROVED CMINI
INSULATION 09/25/2015 APPROVED CMINI
ELECTRIC 1ST ROUGH 09/16/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 9/16/2015 12:56:46 PM FRONT WALLS ONLY
PLUMBING PRESSURE TEST 09/11/2015 APPROVED CMINI
PLUMBING 2ND ROUGH 09/11/2015 CANCELLED BY APPLICANT AIRS WEB
EXTERIOR WALL SHEATHING / SHEARWALL 09/10/2015 APPROVED CMINI
FRAMING 09/04/2015 APPROVED CMINI
FOUNDATION SURVEY - OFFICE USE ONLY 09/03/2015 APPROVED DREWIS
ROOF SHEATHING / BRACE / TIE DOWN 08/24/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 8/24/2015 11:37:03 AM TOWER TRUSSES
MONOLITHIC SLAB 08/20/2015 APPROVED CMINI
PLUMBING 1ST ROUGH 08/18/2015 APPROVED CMINI
DOWN CELL 08/10/2015 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
DOWN CELL 08/05/2015 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 8/5/2015 1:04:56 PM 4TH LIFT
DOWN CELL 07/31/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 7/31/2015 2:30:02 PM 3RD LIFT
DOWN CELL 07/29/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
DOWN CELL 07/27/2015 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 7/27/2015 2:34:53 PM FINISH FLOOR HIEGHT
ELECTRIC OTHER 07/22/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 7/22/2015 9:47:23 AM UFER GROUND CONNECTION
FOOTER 07/22/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
DOWN CELL 07/16/2015 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 7/16/2015 11:11:20 AM NEED REVISION SHOWING ELEVATION CHANGE
FOOTER 07/07/2015 PARTIALLY APPROVED JHINDMAN

Review History

Department Status Date In Date Out
SW1 COMPLETE 09/03/2015 09/03/2015
Note: Released By: DREWIS Foundation survey
BLD COMPLETE 08/14/2015 08/18/2015
ELEC COMPLETE 07/10/2015 07/10/2015
FI1 COMPLETE 07/10/2015 07/10/2015
BLD COMPLETE 07/10/2015 07/10/2015
BLD COMPLETE 05/15/2015 05/18/2015
ZON COMPLETE 05/15/2015 05/21/2015
ZON HOLD 02/09/2015 02/10/2015
Note: 1. Repeat previous comment 5: Cannot release building permit until Development Order is issued for the Island Walk C & D Buildings Site Plan Addition application. Development Order for C & D Buildings can be issued upon receipt of application and recording fees.
PLUM HOLD 02/09/2015 02/10/2015
Note: 1. Provide all cold formed truss anchor connection details. 7/S5-02. 2. Provide all cold formed framing details. 18/S5-01. 3. Provide the stud to continuous angle connection detail 1/S5-01. 4. Provide steel beam to column connection detail 6/S4-01. 5. Provide the stud to continuous angle connection detail 9/S4-01. 7. Provide metal stud, ties, size, spacing and connection details 7/S5-02. 8. Provide joist to joist girder connection detail 1/S4-01. 9. Provide metal stud kicker, size, spacing and connection details 18/S5-01. 10. Provide the pre-engineered metal truss layout from the truss manufacturer. 2nd request
BLD HOLD 02/09/2015 02/10/2015
Note: 1. Provide all cold formed truss anchor connection details. 7/S5-02. 2. Provide all cold formed framing details. 18/S5-01. 3. Provide the stud to continuous angle connection detail 1/S5-01. 4. Provide steel beam to column connection detail 6/S4-01. 5. Provide the stud to continuous angle connection detail 9/S4-01. 7. Provide metal stud, ties, size, spacing and connection details 7/S5-02. 8. Provide joist to joist girder connection detail 1/S4-01. 9. Provide metal stud kicker, size, spacing and connection details 18/S5-01. 10. Provide the pre-engineered metal truss layout from the truss manufacturer. 2nd request
BLD HOLD 12/30/2014 01/08/2015
Note: 1. Provide all cold formed truss anchor connection details. 7/S5-02. 2. Provide all cold formed framing details. 18/S5-01. 3. Provide the stud to continuous angle connection detail 1/S5-01. 4. Provide steel beam to column connection detail 6/S4-01. 5. Provide the stud to continuous angle connection detail 9/S4-01. 7. Provide metal stud, ties, size, spacing and connection details 7/S5-02. 8. Provide joist to joist girder connection detail 1/S4-01. 9. Provide metal stud kicker, size, spacing and connection details 18/S5-01. 10. Provide the pre-engineered metal truss layout from the truss manufacturer.11. Provide Florida Product approval numbers for the exterior doors, storefront windows and doors and the roofing. 2010 FBC 107.2.1 and 107.3.5.
ELEC COMPLETE 12/30/2014 01/09/2015
ENGIN1 COMPLETE 12/30/2014 12/30/2014
FI1 COMPLETE 12/30/2014 01/07/2015
MECH COMPLETE 12/30/2014 01/06/2015
Note: Mechanical work will be done in the future for each individual tenant.
PLUM HOLD 12/30/2014 01/06/2015
Note: 1. Provide plumbing contractor and gas contractor doing the work per FS 489. 2. Provide piping material specifications for sanitary, domestic water and gas per 2010 FBCP 702/605, FBCFG 403.
UD1 COMPLETE 12/30/2014 12/30/2014
ZON HOLD 12/30/2014 01/05/2015
Note: 1. Please revise sheet CA-4.1 to provide the length/width dimensions on the Southwest, West, Southeast and East elevation views. 2. On sheet CA-4.1 please provide the length/width dimension on the South (front) elevation consistent with those shown on the color elevations associated with the Technical Site Plan application plans. 3. On Sheet CA-4.1 the awnings that appear between column lines 355 and 360, and between 380 and 385 are not labeled with the AW-2 label. Please revise the elevations to include these labels on the black fabric awnings. 4. Please revise Sheet CA-4.1 to label the light fixtures on the North (rear) elevation. 5. Cannot release building permit until Development Order is issued for the Island Walk C & D Buildings Site Plan Addition application.
PLUM COMPLETE 02/10/2015
Note: Ok per Fred

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 01/27/2016
REVISION ¤40.00 01/27/2016
REVISION ¤40.00 01/27/2016
SITE PLAN 20 ¤20.00 05/22/2015
SURCHARGE FS 533.721 ¤38.61 05/22/2015
SURCHARGE - FS 468.631 ¤38.61 05/22/2015
3% TRANS IMPACT FEE CREDIT (¤28,003.80) 05/22/2015
ADMIN COMMERCIAL ¤60.00 05/22/2015
ELECTRIC FEE ¤217.20 05/22/2015
ENGINEERING PERMIT FEES ¤120.00 05/22/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤1,149.24 05/22/2015
FIRE PLANS REVIEW ¤42.93 05/22/2015
IMPACT FEE TRANSPORTATION ¤28,003.80 05/22/2015
MECHANICAL FEE ¤217.20 05/22/2015
PERMIT FEE ¤1,441.00 05/22/2015
PLAN CHECK FEE ¤301.30 05/22/2015
PLUMBING FEE ¤217.20 05/22/2015
Fees Total Due: ¤0.00 Total Paid: ¤3,983.29