Permit #2015020277

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00430-0020
CONDITIONED SPACE: 2239 sqft
GARAGE: 485 sqft
OPENED PORCH (WITH ROOF) : 526 sqft
OPENED PORCH (WITH ROOF) : 74 sqft
Total Square Footage: 3324 sqft
Block: 00430
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: (386)445-9055
Location Address: 203 FRANKFORD LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/25/2015
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: LEMOS, JOSE & MARIA

Address

16 FLEMINGTON LN

PALM COAST, FL 32137

Lot: 0020
Contracted Stated Job Value: ¤249,700.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

NEW COASTAL HOMES INC.
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

399 SW PALM COAST PKWY

PALM COAST, FL 32137

STE5

PALM COAST, FL 32137

CRC1327024 (Exp: 08/31/2018) (386)445-9055 (386)445-9056

Sub Contractors

CHARLES K DAVIS
Status Location Address State License Number Phone
ACTIVE

3000 E MOODY BLVD BLDG 2

BUNNELL , FL 32110

EC13004270 (Exp: 08/31/2026) 386-931-6614
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
HEATH EDWARD SANFORD
Status Location Address State License Number Phone Fax
ACTIVE

1351 HAZELNUT ST

BUNNELL, FL 32110

CFC1427527 (Exp: 08/31/2026) 386-445-2532 386-445-5575
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
U - SEWER TIE IN 05/13/2016 FINAL APPROVED JNICHOLS
Note: no permit box visible on site
U -UTILITY RESIDENTIAL FINAL 05/09/2016 FINAL APPROVED JNICHOLS
ROW FINAL 05/05/2016 APPROVED GLALIMA
Note: REPAIRED SOD
BLD - BUILDING FINAL 05/05/2016 FINAL APPROVED CMINI
FINAL APRON (AFTER POUR/DRIVEWAY) 04/29/2016 APPROVED CTROHA
Note: COMPLETE
ROW FINAL 04/29/2016 Disapproved -FEE REQUIRED CTROHA
Note: FLOW LINE OF SWALE IS OFF REGRADE SWALE SO WATER CAN FLOW OFF OF THE STREET CORRECTLY. IT IS RESTRICKTING VOLUME
FINAL SURVEY (OFFICE USE ONLY) 04/18/2016 APPROVED DREWIS
ELECTRIC - EARLY POWER 03/22/2016 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 3/22/2016 2:37:50 PM SPOKE TO DELL FPL RELEASED EARLY POWER 2:36
PRE-APRON (PRE-POUR/DRIVEWAY) 01/19/2016 APPROVED CTROHA
Note: READY FOR POUR
GRAVITY SEWER TEST 12/30/2015 APPROVED CMINI
Note: per contractor
LATH/BRICK/ WATER BARRIER 09/28/2015 APPROVED CMINI
INSULATION 09/24/2015 APPROVED CMINI
ALL ROUGH 09/16/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 9/16/2015 2:14:16 PM WIRE CAN LIGHT ABOVE TUB/FILL 5FT HEAD AT SANITARY TO THE TOP
TIE BEAM / LINTEL 06/18/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/18/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/16/2015 CANCELLED BY APPLICANT CMINI
TIE BEAM / LINTEL 05/08/2015 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 5/8/2015 10:28:14 AM NEED REVISION SHOWING CHANGE OF OPENINGS AT REAR
TIE BEAM / LINTEL 05/05/2015 Disapproved -FEE REQUIRED JCOLASANTI
Note: Inspection Resulted at 5/5/2015 3:14:41 PM NEED DOWEL AND DOWN ROD AT FRONT ENTERY HEADER (MARKED ORANGE)
FOUND SURVEY APPROVED (OFFICE) 05/04/2015 APPROVED JHINDMAN
MONOLITHIC SLAB 04/10/2015 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 04/07/2015 APPROVED CMINI

Review History

Department Status Date In Date Out
SW1 COMPLETE 04/18/2016 04/18/2016
Note: Released By: DREWIS
ELEC COMPLETE 09/15/2015 09/15/2015
ELEC HOLD 09/14/2015 09/14/2015
Note: Please update to current National Electric Code. -DC. Rewis 9864736
BLD COMPLETE 06/17/2015 06/17/2015
BLD HOLD 05/05/2015 05/05/2015
Note: 1. Provide the lintel type and size for the new doorway at bedroom 3. 2010 FBC 107.3.5.
SW1 COMPLETE 05/04/2015 05/04/2015
Note: Released By: JHINDMAN foundation s
BLD COMPLETE 02/25/2015 02/25/2015
PLUM COMPLETE 02/23/2015 02/24/2015
MECH COMPLETE 02/23/2015 02/24/2015
BLD HOLD 02/23/2015 02/24/2015
Note: Previous comments shall be addressed. 1. Wall insulation thickness on plan and energy calculation does not match. Coordinate and submit correction per 2010 FBC 107.2.1. 2. Clarify the roofing material underlayment as plans and Roofing Worksheet does not match. Coordinate and submit correction per 2010 FBC 107.2.1.
BLD HOLD 02/11/2015 02/11/2015
Note: 1. Wall insulation thickness on plan and energy calculation does not match. Coordinate and submit correction per 2010 FBC 107.2.1. 2. Clarify the roofing material underlayment as plans and Roofing Worksheet does not match. Coordinate and submit correction per 2010 FBC 107.2.1.
ELEC COMPLETE 02/11/2015 02/11/2015
ENGIN1 COMPLETE 02/11/2015 02/11/2015
Note: Swale plan to be issued at a later date.
MECH HOLD 02/11/2015 02/11/2015
Note: There are two(2) different hvac plan submitted and for clarity delete one(1) that does not match with floor plan per 2010 FBC 107.2.1.
PLUM HOLD 02/11/2015 02/11/2015
Note: Provide sanitary riser diagram with sufficient clarity for review, construction and inspection per 2010 FBC 107.2.1.
SW1 COMPLETE 02/11/2015 02/11/2015
UD1 COMPLETE 02/11/2015 02/12/2015
Note: See comment in general notes Danny Spencer 386-386-2640
URB COMPLETE 02/11/2015 02/11/2015
Note:
ZON COMPLETE 02/11/2015 02/12/2015

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 05/06/2016
REINSPECTION FEE ¤40.00 05/06/2016
REINSPECTION FEE ¤40.00 05/06/2016
NEW RESIDENTIAL INSPECTIONS ¤586.00 02/25/2015
SITE PLAN 20 ¤20.00 02/25/2015
SURCHARGE FS 533.721 ¤21.46 02/25/2015
SURCHARGE - FS 468.631 ¤21.46 02/25/2015
STORM WATER PERMIT FEES ¤80.00 02/25/2015
3% TRANS IMPACT FEE CREDIT (¤91.51) 02/25/2015
ADMIN FEE ¤20.00 02/25/2015
ELECTRIC FEE ¤235.80 02/25/2015
3% FIRE IMPACT FEE CREDIT (¤6.33) 02/25/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤211.11 02/25/2015
IMPACT FEE PARKS ¤849.24 02/25/2015
IMPACT FEE SCHOOL ¤3,600.00 02/25/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 02/25/2015
MECHANICAL FEE ¤235.80 02/25/2015
3% PARKS IMPACT FEE CREDIT (¤25.48) 02/25/2015
PLAN CHECK FEE ¤117.20 02/25/2015
PLUMBING FEE ¤235.80 02/25/2015
Fees Total Due: ¤0.00 Total Paid: ¤9,280.79