Permit #2015020372

Permit Details

Status: CANCEL

COMMERCIAL SQUARE FOOTAGE: 5928 sqft
Total Square Footage: 5928 sqft
Block: 000B0
Subdivision: 2278 - AIRPORT COMMERCE CENTER PHASE II
Job Phone: 407-791-9000
Location Address: 5893 STATE HWY 100 E
Type: BC - BUILDING COMMERCIAL
NOC: NO DOCUMENTATION
Applicant name: ASHLEY RAY RUMBLE
Owner: PALM COAST HOLDINGS INC

Address

145 CITY PLACE SUITE 300

PALM COAST, FL 32164

Lot: 0010
Contracted Stated Job Value: ¤1,200,000.00
Job Description: CONVENIENCE STORE & - "RACETRAC" STATION
Type: CN

Contractor

CCS CONSTRUCTION , LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

2345 W SAND LAKE ROAD

ORLANDO, FL 32809

SUITE 100

ORLANDO, FL 32809

CBC1257461 (Exp: 08/31/2026) 407-791-9000

Sub Contractors

RAMIRO PONCE
Status Location Address State License Number Phone Fax
CANCEL

10223 GLACIER CT

ORLANDO, FL 32821

EC13003324 (Exp: 08/31/2022) 407-924-2603 (407)370-2539
MARTY RAY HANKS
Status Location Address State License Number Phone Fax
ACTIVE

270 US HWY 90 EAST

BALDWIN, FL 32234

CAC057518 (Exp: 08/31/2026) 904-266-2100 904-266-2177
DERRICK SCOTT HARGER
Status Location Address State License Number Phone Fax
ACTIVE

975 SUNSHINE LANE

ALTAMONTE SPRINGS, FL 32714

CFC1425861 (Exp: 08/31/2026) (407)295-1000 (407)295-0000
ROBERT W BINNS
Status Location Address Mailing Address State License Number Phone Fax
INACTIVE

ROBERT BINNS ROOFING INC

WINTER HAVEN, FL 33880

5918 COUNTY RD 542 W`

WINTER HAVEN, FL 33880

CCC1325548 (Exp: 08/31/2024) 863-984-9685 863-984-9688

Inspection History

Type Request Date Result Inspector
PLUMBING 1ST ROUGH
PLUMBING FINAL
HVAC ROUGH
HVAC FINAL
ELECTRIC 1ST ROUGH
ELECTRIC FINAL
MONOLITHIC SLAB
FOOTER
LINTEL
FRAMING
ROOF SHEATHING / BRACE / TIE DOWN
ABOVE CEILING
INSULATION
BUILDING FINAL
FIRE FINAL
LDSC- LANDSCAPE FINAL
U-GREASE INTERCEPTOR PRE-INSTALLATION
U-GREASE INTERCEPTOR INSTALLED/PLUMBED
U-GREASE INTERCEPTOR FLOW/DYE TESTED
U - UTILITY COMMERCIAL FINAL
U - SEWER TIE IN

Review History

Department Status Date In Date Out
DSD HOLD 06/02/2015 06/08/2015
Note: 1. Property must be platted before a Development Oder is issued. 2. Commercial Site Development permit must be applied for and issued prior to issuance of all building permits.
BLD COMPLETE 06/02/2015 06/09/2015
PLUM COMPLETE 04/29/2015 04/29/2015
DSD HOLD 04/29/2015 05/11/2015
Note: Please revise sheet A-300 to be consistent with the changes requested on the same sheet for a Development Order approval. The changes are to provide linear width for each elevation and remove the illuminated swirl sign panel from the front elevation. 2. Development Order for the Site must be approved prior to issuance of a building permit. 3. Site Development Permit must be submitted for approval prior to issuance of a building permit.
DSD HOLD 04/08/2015 04/08/2015
Note: 1. Development Order for the Site must be approved prior to issuance of a building permit. 2. Site Development Permit must be submitted for approval prior to issuance of a building permit. 3. Elevation/Architectural Plans cannot be reviewed or approved until the Development Order Elevation/Architectural plans are approved and submitted for review. Development Order Elevation/Architectural plans must match Elevation/Architectural plans submitted for a building permit.
UD1 COMPLETE 03/20/2015 03/23/2015
PLUM HOLD 03/20/2015 03/25/2015
Note: Submitted correction of riser diagram (Sheet P200) does not match with corrected floor plan (Sheet P110). The hand sinks on riser diagram were deleted instead of connecting them from sanitary to grease line. For clarification, coordinate plan with riser diagram per 2010 FBC 107.2.1.
ELEC COMPLETE 03/20/2015 03/24/2015
SW1 COMPLETE 03/20/2015 03/27/2015
MECH COMPLETE 03/20/2015 03/25/2015
ZON COMPLETE 03/20/2015 04/08/2015
BLD COMPLETE 02/13/2015 02/17/2015
DSD HOLD 02/13/2015 02/17/2015
Note: 1. Development Order for the Site must be approved prior to issuance of a building permit. 2. Site Development Permit must be submitted for approval prior to issuance of a building permit. 3. Plans cannot be approved or reviewed until the Development Order elevation plans are approved. Development Order elevation plans must match elevation plans on the building permit.
ELEC HOLD 02/13/2015 02/20/2015
Note: The MDP schedule calls for a 200amp cb in panel B. Panel B schedule calls for a 125 mlo. Provide matching schedules.
ENGIN1 COMPLETE 02/13/2015 02/13/2015
FI1 COMPLETE 02/13/2015 02/17/2015
MECH HOLD 02/13/2015 02/16/2015
Note: Kitchen exhaust hood shall be applied under separate permit per 2010 FBC 107.2.1. Consolidate and submit plans, details, and notes from the original permit (2015020372) applicable to kitchen exhaust hood.
PLLA COMPLETE 02/13/2015 02/16/2015
PLUM HOLD 02/13/2015 02/17/2015
Note: Revise sheet P110 and P200 to tie in two (2) hand sinks at brew bar and yogurt areas from sanitary to grease line per 2010 FBCP1003.3.1
SW1 COMPLETE 02/13/2015 02/13/2015
UD1 HOLD 02/13/2015 02/17/2015
Note: Connect the EQ233 next to corner 3 compartment sink to grease line. Connect the EQ232 next to Cappuccino dispenser to grease line Cjohnson 986-2384
ZON HOLD 02/13/2015 02/17/2015
Note: See DSD planning hold.
DSD CANCEL