Permit #2015020583

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7013-00070-0010
CONDITIONED SPACE: 300 sqft
Total Square Footage: 300 sqft
Block: 00070
Subdivision: 2192 - SECTION 13-BELLE TERRE
Job Phone: (386)931-1917
Location Address: 32 BREEZE HILL LN
Type: BA - BUILDING ADDITION
Issue Date: 03/05/2015
NOC: RECORDED
Applicant name: BRAD MICHAEL THOMAS
Owner: ADAMS THEODORE F & EMMA I H&W

Address

32 BREEZE HILL LANE

PALM COAST, FL 32137

Lot: 0010
Contracted Stated Job Value: ¤42,000.00
Job Description: 20'X15' BUILDING ADDITION
Type: CN

Contractor

AUBURN HOMES INC.
Status Location Address State License Number Phone
HOLD

1 HARGROVE GRADE STE 1E

PALM COAST, FL 32137

CGC1506292 (Exp: 08/31/2020) (386)931-1917

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
DENNIS GENE GAINEY
Status Location Address State License Number Phone Fax
INACTIVE

P.O. BOX 1203

Bunnell, FL 32110

CFC046004 (Exp: 08/31/2026) (386) 437-5637 386-437-3012
YORDANIS GONZALEZ
Status Location Address State License Number Phone
ACTIVE

33 RICKENBACKER DRIVE

PALM COAST, FL 32164

CCC1328730 (Exp: 08/31/2026) 386-804-4109

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/11/2015 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 05/27/2015 FINAL APPROVED MBACON
BLD - BUILDING FINAL 05/27/2015 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION Inspection Resulted at 5/27/2015 2:41:56 PM NEED TO GET REVISION FOR SUB PANEL NOT ON PLANS. MAKE SURE LABELING IS CORRECT AT PANELS. BREAKER IN PANEL IS 20AMP UNIT CALL FOR MAX 15AMP BREAKER.
BLD - BUILDING FINAL 05/26/2015 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION Inspection Resulted at 5/26/2015 11:05:57 AM NEED CITY APPROVED FINAL SURVEY ON SITE TO COMPLETE INSPECTION.
BLD - BUILDING FINAL 05/21/2015 CANCELLED BY APPLICANT JCOLASANTI
FINAL SURVEY (OFFICE USE ONLY) 05/19/2015 APPROVED FREODICA
PLUMBING 1ST ROUGH UNDERGROUND 05/18/2015 CANCELLED BY APPLICANT AIRS WEB
INSULATION 04/21/2015 APPROVED JCOLASANTI
ALL ROUGH 04/20/2015 APPROVED - AS NOTED JCOLASANTI
Note: Inspection Resulted at 4/20/2015 9:52:40 AM NEED TO MOVE ELECTRICAL WIRE TOUCHING CAN LIGHT. NEED TO LABLE PANEL BY FINAL
U - SEWER TIE IN 04/10/2015 FINAL APPROVED MBACON
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/09/2015 APPROVED CMINI
TIE BEAM / LINTEL 03/30/2015 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 03/27/2015 APPROVED FREODICA
U - SEWER TIE IN 03/17/2015 Disapproved - NO FEE MBACON
Note: Inspection Resulted at 3/17/2015 9:28:59 AM WE DO NOT ALLOW VERTICAL DROPS IN 4 INCH RISER FOR CLEAN OUT PIPE. PLEASE TIE INTO THE 4 INCH BURIED PIPE USING A 45 OR OTHER APPROVED FITTING. ALSO OLD EXISTING CLEANOUT IN RIGHT OF WAY IS SUFFICIENT THERE IS NO NEED FOR ADDITIONAL CLEAN OUT IN THIS AREA.
MONOLITHIC SLAB 03/12/2015 APPROVED JCOLASANTI
PLUMBING 1ST ROUGH UNDERGROUND 03/11/2015 APPROVED - AS NOTED JCOLASANTI
Note: Inspection Resulted at 3/11/2015 10:55:01 AM NEED WATER PRESURE GAGE. CHECK AT SLAB INSPECTION

Review History

Department Status Date In Date Out
ELEC COMPLETE 06/03/2015 06/09/2015
SW1 COMPLETE 05/18/2015 05/19/2015
Note: Released By: FREODICA final survey
SW1 COMPLETE 03/26/2015 03/27/2015
Note: Released By: FREODICA foundation sruvey
ZON COMPLETE 03/05/2015 03/05/2015
MECH COMPLETE 03/02/2015 03/04/2015
ZON HOLD 03/02/2015 03/03/2015
Note: Stepping stone "walkway" is actually considered to be a patio and would therefore be required to meet the 10' rear setback for the property.
BLD COMPLETE 02/23/2015 02/24/2015
ELEC COMPLETE 02/23/2015 02/24/2015
MECH HOLD 02/23/2015 02/24/2015
Note: Provide the model number of hvac units, specification and its location per 2010 FBC 107.2.1.
PLUM COMPLETE 02/23/2015 02/24/2015
SW1 COMPLETE 02/23/2015 02/23/2015
ZON HOLD 02/23/2015 02/24/2015
Note: Site plan depicts paver patio which is not on permit application. The paver patio depicted does not meet the minimum rear setbacks of the zoning district. Please either remove the patio from the permit or revise the plan so that the patio is within the required zoning setbacks. T. Childs 986-2473

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 06/17/2015
REINSPECTION FEE ¤40.00 06/17/2015
REINSPECTION FEE ¤40.00 06/17/2015
REMODEL/ADDITION/ACCES INSPECT ¤40.00 03/05/2015
SITE PLAN 20 ¤20.00 03/05/2015
SURCHARGE FS 533.721 ¤5.33 03/05/2015
SURCHARGE - FS 468.631 ¤5.33 03/05/2015
STORM WATER PERMIT FEES ¤80.00 03/05/2015
ADMIN FEE ¤20.00 03/05/2015
ELECTRIC FEE ¤85.20 03/05/2015
MECHANICAL FEE ¤85.20 03/05/2015
PLAN CHECK FEE ¤40.00 03/05/2015
PLUMBING FEE ¤85.20 03/05/2015
Fees Total Due: ¤0.00 Total Paid: ¤586.26