I want to search for...
Permit #2015020583
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7013-00070-0010 |
| CONDITIONED SPACE: 300 sqft |
| Total Square Footage: 300 sqft |
| Block: 00070 |
| Subdivision: 2192 - SECTION 13-BELLE TERRE |
| Job Phone: (386)931-1917 |
| Location Address: 32 BREEZE HILL LN |
| Type: BA - BUILDING ADDITION |
| Issue Date: 03/05/2015 |
| NOC: RECORDED |
| Applicant name: BRAD MICHAEL THOMAS |
| Owner: ADAMS THEODORE F & EMMA I H&W |
|
Address 32 BREEZE HILL LANE PALM COAST, FL 32137 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤42,000.00 |
| Job Description: 20'X15' BUILDING ADDITION |
| Type: CN |
Contractor
AUBURN HOMES INC.
| Status | Location Address | State License Number | Phone |
| HOLD |
1 HARGROVE GRADE STE 1E PALM COAST, FL 32137 |
CGC1506292 (Exp: 08/31/2020) | (386)931-1917 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
YORDANIS GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
33 RICKENBACKER DRIVE PALM COAST, FL 32164 |
CCC1328730 (Exp: 08/31/2026) | 386-804-4109 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/11/2015 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 05/27/2015 | FINAL APPROVED | MBACON |
| BLD - BUILDING FINAL | 05/27/2015 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/27/2015 2:41:56 PM NEED TO GET REVISION FOR SUB PANEL NOT ON PLANS. MAKE SURE LABELING IS CORRECT AT PANELS. BREAKER IN PANEL IS 20AMP UNIT CALL FOR MAX 15AMP BREAKER. | |||
| BLD - BUILDING FINAL | 05/26/2015 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/26/2015 11:05:57 AM NEED CITY APPROVED FINAL SURVEY ON SITE TO COMPLETE INSPECTION. | |||
| BLD - BUILDING FINAL | 05/21/2015 | CANCELLED BY APPLICANT | JCOLASANTI |
| FINAL SURVEY (OFFICE USE ONLY) | 05/19/2015 | APPROVED | FREODICA |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/18/2015 | CANCELLED BY APPLICANT | AIRS WEB |
| INSULATION | 04/21/2015 | APPROVED | JCOLASANTI |
| ALL ROUGH | 04/20/2015 | APPROVED - AS NOTED | JCOLASANTI |
| Note: Inspection Resulted at 4/20/2015 9:52:40 AM NEED TO MOVE ELECTRICAL WIRE TOUCHING CAN LIGHT. NEED TO LABLE PANEL BY FINAL | |||
| U - SEWER TIE IN | 04/10/2015 | FINAL APPROVED | MBACON |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/09/2015 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 03/30/2015 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 03/27/2015 | APPROVED | FREODICA |
| U - SEWER TIE IN | 03/17/2015 | Disapproved - NO FEE | MBACON |
| Note: Inspection Resulted at 3/17/2015 9:28:59 AM WE DO NOT ALLOW VERTICAL DROPS IN 4 INCH RISER FOR CLEAN OUT PIPE. PLEASE TIE INTO THE 4 INCH BURIED PIPE USING A 45 OR OTHER APPROVED FITTING. ALSO OLD EXISTING CLEANOUT IN RIGHT OF WAY IS SUFFICIENT THERE IS NO NEED FOR ADDITIONAL CLEAN OUT IN THIS AREA. | |||
| MONOLITHIC SLAB | 03/12/2015 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/11/2015 | APPROVED - AS NOTED | JCOLASANTI |
| Note: Inspection Resulted at 3/11/2015 10:55:01 AM NEED WATER PRESURE GAGE. CHECK AT SLAB INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 06/03/2015 | 06/09/2015 |
| SW1 | COMPLETE | 05/18/2015 | 05/19/2015 |
| Note: Released By: FREODICA final survey | |||
| SW1 | COMPLETE | 03/26/2015 | 03/27/2015 |
| Note: Released By: FREODICA foundation sruvey | |||
| ZON | COMPLETE | 03/05/2015 | 03/05/2015 |
| MECH | COMPLETE | 03/02/2015 | 03/04/2015 |
| ZON | HOLD | 03/02/2015 | 03/03/2015 |
| Note: Stepping stone "walkway" is actually considered to be a patio and would therefore be required to meet the 10' rear setback for the property. | |||
| BLD | COMPLETE | 02/23/2015 | 02/24/2015 |
| ELEC | COMPLETE | 02/23/2015 | 02/24/2015 |
| MECH | HOLD | 02/23/2015 | 02/24/2015 |
| Note: Provide the model number of hvac units, specification and its location per 2010 FBC 107.2.1. | |||
| PLUM | COMPLETE | 02/23/2015 | 02/24/2015 |
| SW1 | COMPLETE | 02/23/2015 | 02/23/2015 |
| ZON | HOLD | 02/23/2015 | 02/24/2015 |
| Note: Site plan depicts paver patio which is not on permit application. The paver patio depicted does not meet the minimum rear setbacks of the zoning district. Please either remove the patio from the permit or revise the plan so that the patio is within the required zoning setbacks. T. Childs 986-2473 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 06/17/2015 |
| REINSPECTION FEE | ¤40.00 | 06/17/2015 |
| REINSPECTION FEE | ¤40.00 | 06/17/2015 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 03/05/2015 |
| SITE PLAN 20 | ¤20.00 | 03/05/2015 |
| SURCHARGE FS 533.721 | ¤5.33 | 03/05/2015 |
| SURCHARGE - FS 468.631 | ¤5.33 | 03/05/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/05/2015 |
| ADMIN FEE | ¤20.00 | 03/05/2015 |
| ELECTRIC FEE | ¤85.20 | 03/05/2015 |
| MECHANICAL FEE | ¤85.20 | 03/05/2015 |
| PLAN CHECK FEE | ¤40.00 | 03/05/2015 |
| PLUMBING FEE | ¤85.20 | 03/05/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤586.26 |