Permit #2015030010
Permit Details
Status: FINAL
| Parcel Id: 41-11-31-4975-00000-0010 |
| Block: 00000 |
| Subdivision: 2272 - ISLAND WALK AT PALM COAST |
| Job Phone: 727-938-9719 |
| Location Address: 250 PALM COAST PKWY NE |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 05/14/2015 |
| NOC: RECORDED |
| Applicant name: MICHAEL S BEAUSIR |
| Owner: BRANCH ISLAND WALK ASSOCIATES LP |
|
Address SUITE 600 ATLANTA, GA 30326 |
|
Address 3340 PEACHTREE ROAD NE ATLANTA, GA 30326 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤733,814.00 |
| Job Description: COMMERCIAL BUILDING- PUBLIX CANOPY & FASCADE |
| Type: CN |
Contractor
HAWKINS CONSTRUCTION INC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1430 L AND R INDUSTRIAL BLVD TARPON SPRINGS, FL 34689 |
CGC061198 (Exp: 08/31/2018) | 727-938-9719 | 727-938-3208 |
Sub Contractors
CHRISTOPHER BLAKE LOVE JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6901 49TH AVENUE ST PETERSBURG, FL 33709 |
CMC1249892 (Exp: 08/03/2016) | 727-452-5727 | 727-289-5876 |
ANDREW JASON RODGERS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6915 BUSINESS PARK BOULEVARD NORTH JACKSONVILLE, FL 32256 |
CFC057050 (Exp: 08/31/2022) | 904-765-7964 | 904-765-9805 |
ROBERT PICKARD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12503 CREEKSIDE DRIVE LARGO, FL 33773 |
EC0000488 (Exp: 08/31/2018) | 727-507-0997 | 727-533-8906 |
MICHAEL L RUSS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 730 DUNNELLON , FL 34432 |
CCC057482 (Exp: 08/31/2026) | 352-489-4274 | 352-489-3466 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRIC FINAL | 10/14/2015 | APPROVED | RMARTIN |
| BUILDING FINAL | 10/14/2015 | FINAL APPROVED | CMINI |
| EXTERIOR WALL SHEATHING / SHEARWALL | 10/13/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| U - UTILITY COMMERCIAL FINAL | 10/13/2015 | APPROVED | DSPENCER |
| ELECTRIC 2ND ROUGH | 10/13/2015 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| FOUNDATION SURVEY - OFFICE USE ONLY | 10/12/2015 | APPROVED | DREWIS |
| FIRE FINAL | 10/07/2015 | APPROVED | JHINDMAN |
| ELECTRIC 2ND ROUGH | 09/16/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 9/16/2015 12:56:47 PM ALL GOOD STILL NEED SIGNS INSTALLED | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 08/13/2015 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION front columns | |||
| FRAMING | 08/11/2015 | APPROVED | JHINDMAN |
| Note: front columns | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 08/11/2015 | PARTIALLY APPROVED | JHINDMAN |
| Note: front tower | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 07/31/2015 | APPROVED | CMINI |
| ROOF SHEATHING / BRACE / TIE DOWN | 07/24/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 7/24/2015 2:40:14 PM FRONT ELEVATION | |||
| FOOTER | 05/27/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 5/27/2015 2:37:28 PM CANOPY OUTSIDE FOOTERS |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 10/12/2015 | 10/12/2015 |
| Note: Released By: DREWIS foundation survey | |||
| BLD | COMPLETE | 05/11/2015 | 05/11/2015 |
| BLD | HOLD | 04/16/2015 | 04/20/2015 |
| Note: 1. Provide all cold formed truss anchor connection details. 20/HS5-02. 2. Provide the pre engineered metal truss layout from the truss manufacturer. 2010 FBC 107.2.1 and 107.3.5 per previous requests | |||
| DSD | COMPLETE | 03/12/2015 | 03/12/2015 |
| Note: Released By: APILTAVER Substituted HA-4.1 sheet and manually released hold. | |||
| ZON | COMPLETE | 03/12/2015 | 03/12/2015 |
| Note: Released By: APILTAVER Substituted HA4.1 sheet and manually released hold. | |||
| DSD | HOLD | 03/06/2015 | 03/06/2015 |
| Note: 1. Please resubmit the revised Sheet HA4.1 that includes the revisions showing the textured finish on the side and rear walls as well as the cornice and EIFS band. | |||
| BLD | HOLD | 03/05/2015 | 03/09/2015 |
| Note: 1. Provide all cold formed truss anchor connection details. 20/HS5-02. 2. Provide all cold formed framing anchor details. 20/HS5-02. 3. Provide the stud to continuous angle connection detail 1/HS5-01. 4. Provide steel beam to column connection detail 6/ HS4-01. 5. Provide the stud to continuous angle connection detail 9/HS4-01 7. Provide metal stud ties, size spacing and connection details 7. HS5-02. 8 Provide the pre engineered metal truss layout from the truss manufacturer. 2010 FBC 107.2.1 and 107.3.5 | |||
| ELEC | COMPLETE | 03/05/2015 | 03/09/2015 |
| ENGIN1 | COMPLETE | 03/05/2015 | 03/05/2015 |
| FI1 | COMPLETE | 03/05/2015 | 03/09/2015 |
| MECH | COMPLETE | 03/05/2015 | 03/05/2015 |
| Note: Not applicable. | |||
| PLUM | COMPLETE | 03/05/2015 | 03/05/2015 |
| Note: Not applicable. | |||
| UD1 | COMPLETE | 03/05/2015 | 03/09/2015 |
| ZON | HOLD | 03/05/2015 | 03/06/2015 |
| Note: Planning Comment: 1. Please resubmit the revised Sheet HA4.1 that includes the revisions showing the textured finish on the side and rear walls as well as the cornice and EIFS band. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN COMMERCIAL | ¤60.00 | 05/14/2015 |
| ELECTRIC FEE | ¤500.40 | 05/14/2015 |
| ENGINEERING PERMIT FEES | ¤120.00 | 05/14/2015 |
| FIRE PLANS REVIEW | ¤25.00 | 05/14/2015 |
| MECHANICAL FEE | ¤500.40 | 05/14/2015 |
| PERMIT FEE | ¤4,037.00 | 05/14/2015 |
| PLAN CHECK FEE | ¤844.10 | 05/14/2015 |
| PLUMBING FEE | ¤500.40 | 05/14/2015 |
| SITE PLAN 20 | ¤20.00 | 05/14/2015 |
| SURCHARGE FS 533.721 | ¤98.43 | 05/14/2015 |
| SURCHARGE - FS 468.631 | ¤98.43 | 05/14/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤6,804.16 |