Permit #2015030116

Permit Details

Status: COED

Parcel Id: 33-11-31-3060-00030-0180
CONDITIONED SPACE: 2146 sqft
GARAGE: 503 sqft
GARAGE: 62 sqft
OPENED PORCH (WITH ROOF) : 370 sqft
OPENED PORCH (WITH ROOF) : 88 sqft
Total Square Footage: 3169 sqft
Block: 00030
Subdivision: 2106 - HIDDEN LAKES, PHASE 1
Job Phone: 386-445-9055
Location Address: 186 ARENA LAKE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/22/2015
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: ESTEVAM, FERNANDO S & MARIA L

Address

64 HAMILTON AVE

SOUTHINGTON, CT 06489

Lot: 0180
Contracted Stated Job Value: ¤236,060.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SUN STATE CUSTOM BUILDERS, LLC
Status Location Address State License Number
CANCEL

946 SHADICH DRIVE

ORANGE CITY, FL

CGC1519145 (Exp: 08/31/2022)

Sub Contractors

CHARLES K DAVIS
Status Location Address State License Number Phone
ACTIVE

3000 E MOODY BLVD BLDG 2

BUNNELL , FL 32110

EC13004270 (Exp: 08/31/2026) 386-931-6614
HEATH EDWARD SANFORD
Status Location Address State License Number Phone Fax
ACTIVE

1351 HAZELNUT ST

BUNNELL, FL 32110

CFC1427527 (Exp: 08/31/2026) 386-445-2532 386-445-5575
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 02/17/2017 FINAL APPROVED JNICHOLS
BLD - BUILDING FINAL 02/16/2017 FINAL APPROVED CMINI
FINAL APRON (AFTER POUR/DRIVEWAY) 02/16/2017 APPROVED GLALIMA
ROW FINAL 02/16/2017 APPROVED GLALIMA
FINAL SURVEY (OFFICE USE ONLY) 02/15/2017 APPROVED FREODICA
ELECTRIC - EARLY POWER 02/03/2017 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION, called fpl to release power spoke to Dell
PRE-APRON (PRE-POUR/DRIVEWAY) 01/23/2017 APPROVED GLALIMA
U - SEWER TIE IN 01/19/2017 APPROVED JNICHOLS
GRAVITY SEWER TEST 01/19/2017 APPROVED CMINI
SEWER SERVICE 01/19/2017 CANCELLED BY APPLICANT AIRS WEB
ELECTRIC-TUG 11/22/2016 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TUG
ELECTRIC - EARLY POWER 11/21/2016 Disapproved - NO FEE RMARTIN
Note: NEED TO CALL IN TUG INSPECTION, WRONG INSPECTION WAS CALLED IN
INSULATION 10/12/2016 APPROVED CMINI
LATH/BRICK/ WATER BARRIER 09/13/2016 APPROVED CMINI
ALL ROUGH 09/13/2016 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/13/2016 APPROVED CMINI
TIE BEAM / LINTEL 02/19/2016 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 2/19/2016 1:38:58 PM LOUIS, NEED REVISION FOR LEFT SIDE ELEVATION CHANGE.PLEASE HAVE BY ALL-ROUGH INSPECTION
TIE BEAM / LINTEL 02/02/2016 CANCELLED BY APPLICANT DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 10/08/2015 APPROVED DREWIS
MONOLITHIC SLAB 06/11/2015 Disapproved -FEE REQUIRED DROCKWELL
Note: Inspection Resulted at 6/11/2015 1:10:47 PM NEED A RELIEVING ARCH OVER CLUSTER OF PIPES THRU FOOTER BACK WALL
PLUMBING 1ST ROUGH UNDERGROUND 05/26/2015 APPROVED DROCKWELL

Review History

Department Status Date In Date Out
SW1 COMPLETE 02/15/2017 02/15/2017
Note: Released By: FREODICA final survey
SW1 COMPLETE 02/08/2017 02/08/2017
UD1 COMPLETE 02/08/2017 02/10/2017
Note: All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON COMPLETE 02/08/2017 02/09/2017
BLD COMPLETE 02/15/2016 02/18/2016
SW1 COMPLETE 10/08/2015 10/08/2015
Note: Released By: DREWIS foundation survey
ZON COMPLETE 04/02/2015 04/02/2015
BLD COMPLETE 04/02/2015 04/07/2015
ZON HOLD 03/26/2015 03/27/2015
Note: Per original hold comment, recording information on Site Plan is incorrect. When resubmitting, please also make sure paver driveway note is carried over to corrected site plan. T. Childs 986-2473
URB COMPLETE 03/26/2015 03/26/2015
MECH COMPLETE 03/26/2015 03/27/2015
BLD HOLD 03/26/2015 03/27/2015
Note: 1. Provide lintel over openings of front master bathroom window and doors per 2010 FBCR 606.10. 2. Provide Florida product approval for concrete tile roofing material per 2010 FBC 107.2.1
SW1 COMPLETE 03/26/2015 03/27/2015
Note: final s
ELEC COMPLETE 03/26/2015 03/27/2015
BLD HOLD 03/05/2015 03/06/2015
Note: 1. Provide lintel over openings of front windows and doors per 2010 FBCR 606.10. 2. Provide Florida product approval for concrete tile roofing material per 2010 FBC 107.2.1.
ELEC HOLD 03/05/2015 03/09/2015
Note: 1. Provide a disconnect for the air handler per 2008 NEC art 422.
ENGIN1 COMPLETE 03/05/2015 03/18/2015
MECH HOLD 03/05/2015 03/06/2015
Note: Clarify the hvac units cooling capacity to be installed per 2010 FBC 107.2.1/ FBCEC 403.6.1.1. The energy calculation shows 3.5 tons but the sizing calculation shows 2.5 tons.
PLUM COMPLETE 03/05/2015 03/06/2015
SW1 HOLD 03/05/2015 03/09/2015
Note: 1. Provide a site plan with the proposed drainage.
UD1 COMPLETE 03/05/2015 03/06/2015
Note: See Comments
URB HOLD 03/05/2015 03/06/2015
Note: Need foundation shrubbery front of bump-out left side and wrap all corners.
ZON HOLD 03/05/2015 03/05/2015
Note: 1. Provide site plan. Please be sure that paver driveway is depicted and that the recording information map book and page number(s) are correct. 2. Foundation plantings are required to wrap front corners of house. T. Childs 986-2473

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 02/17/2017
CONTRACTOR CHANGE ¤40.00 02/17/2017
REVISION ¤40.00 02/17/2017
REINSPECTION FEE ¤40.00 02/17/2017
NEW RESIDENTIAL INSPECTIONS ¤560.00 04/22/2015
ADMIN FEE ¤20.00 04/22/2015
SITE PLAN 20 ¤20.00 04/22/2015
SURCHARGE FS 533.721 ¤20.64 04/22/2015
SURCHARGE - FS 468.631 ¤20.64 04/22/2015
STORM WATER PERMIT FEES ¤80.00 04/22/2015
3% TRANS IMPACT FEE CREDIT (¤91.51) 04/22/2015
ELECTRIC FEE ¤228.00 04/22/2015
3% FIRE IMPACT FEE CREDIT (¤6.33) 04/22/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤211.11 04/22/2015
IMPACT FEE PARKS ¤849.24 04/22/2015
IMPACT FEE SCHOOL ¤3,600.00 04/22/2015
RECORDING FEE REIMBURSE DOC ¤52.50 04/22/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 04/22/2015
MECHANICAL FEE ¤228.00 04/22/2015
3% PARKS IMPACT FEE CREDIT (¤25.48) 04/22/2015
PLAN CHECK FEE ¤112.00 04/22/2015
PLUMBING FEE ¤228.00 04/22/2015
Fees Total Due: ¤0.00 Total Paid: ¤9,317.05