Permit #2015030780

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00110-0020
CONDITIONED SPACE: 1666 sqft
GARAGE: 523 sqft
OPENED PORCH (WITH ROOF) : 180 sqft
OPENED PORCH (WITH ROOF) : 43 sqft
Total Square Footage: 2412 sqft
Block: 00110
Subdivision: 2123 - SECTION 57-ULYSSES TREES
Job Phone: (386)763-4190
Location Address: 26 UTIDE CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/17/2015
NOC: RECORDED
Applicant name: PAUL KEITH CULVER
Owner: DOUGLAS & BONNIE VINING

Address

34 UTRILLO PL

PALM COAST, FL 32164

Lot: 0020
Contracted Stated Job Value: ¤201,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

PAUL CULVER CONSTRUCTION INC
Status Location Address State License Number Phone Fax
ACTIVE

1301 BEVILLE RD SUITE #6

DAYTONA BEACH, FL 32119

CGC059149 (Exp: 08/31/2026) (386)763-4190 (386)322-6724

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
JAMES KUYKENDALL
Status Location Address State License Number Phone Fax
CANCEL

2550 US 1 NORTH SUITE 3

BUNNELL, FL 32110

CAC1815546 (Exp: 08/31/2022) (386)437-2929 (386)437-2942
CHARLES MICHAEL KING JR
Status Location Address State License Number Phone
INACTIVE

3415 PENNSYLANIA AVE

MIAMI , FL 32754

CFC1428859 (Exp: 08/31/2020) 386-479-2965
JOSEPH MARTIN DELIA JR
Status Location Address State License Number Phone Fax
INACTIVE

200 PALMETTO PINES RD

DAYTONA BEACH, FL 32114

CCC1326358 (Exp: 08/31/2026) (386)673-6600 (386)673-6600

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/18/2015 FINAL APPROVED LMILLER
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 09/17/2015 CANCELLED BY APPLICANT LMILLER
Note: THIS IS A REINSPECTION Inspection Resulted at 9/17/2015 10:39:25 AM SEE PRIOR NOTES ON FAILURE FOR DETAILS AT RE-INSPECTION, CANCELLED BY APPLICANT
U -UTILITY RESIDENTIAL FINAL 09/17/2015 FINAL APPROVED MBACON
FINAL APRON (AFTER POUR/DRIVEWAY) 09/16/2015 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
ROW FINAL 09/16/2015 APPROVED GLALIMA
FINAL APRON (AFTER POUR/DRIVEWAY) 09/15/2015 Disapproved -FEE REQUIRED CTROHA
Note: no final survey driveway is 7" wider than plans need a revision
BLD - BUILDING FINAL 09/15/2015 Disapproved -FEE REQUIRED DROCKWELL
Note: Inspection Resulted at 9/15/2015 11:51:43 AM FURNISH A/C PLAN /PROVIDE INSULATION CERT/REMOVE CONSTRUCTION DEBRIS FROM SITE/WATER HEATER PAN MUST DRAIN TO LOWER FLOOR/INSTALL WATER HAMMER AT DISHWASHER/CANNOT LOCATE BATH DUCT TERMINATION POINTS TO OUSIDE/PULL DOWN STAIR COVER MUST BE RATED FOR FLAME SPREAD
FINAL SURVEY (OFFICE USE ONLY) 09/14/2015 APPROVED DREWIS
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 09/08/2015 Disapproved - NO FEE DREWIS
Note: Swale diagram specs out invert at 21.28. Culverts have a below elevation allowance of 2/10ths and none above whats indicated on diagram. -DC. Rewis 9864736
FINAL SURVEY (OFFICE USE ONLY) 09/04/2015 Disapproved - NO FEE DREWIS
Note: Please provide culvert invert measurement and set back measurement for patio. -DC. Rewis 9864736
U - SEWER TIE IN 09/04/2015 APPROVED MBACON
GRAVITY SEWER TEST 08/18/2015 APPROVED DROCKWELL
ELECTRIC - EARLY POWER 08/14/2015 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 8/14/2015 1:35:58 PM SPOKE TO DELL FPL RELEASED POWER 1:21
PRE-APRON (PRE-POUR/DRIVEWAY) 07/30/2015 APPROVED - AS NOTED CTROHA
Note: THIS IS A REINSPECTION Driveway is 7" wider than plot plan needs revised before final survey 10%+ on apron Approved by city per G. Lalima
PRE-APRON (PRE-POUR/DRIVEWAY) 07/28/2015 Disapproved -FEE REQUIRED GLALIMA
Note: NO SWALE PLAN , NO SURVEY , SEE DRIVEWAY DETAIL FOR CULVERT ENDS , NO MORE THEN 8% SLOPE .50% OF CULVERT IS TO BE COVERED . THE 1"x FORM OVER THE TOP OF CULVERT NEEDS TO BE REMOVED .. AFTER RAIN WASHOUT YOU SHOULD RECHECK YOUR ELEVATIONS . REINSPECTION NEEDED
LATH/BRICK/ WATER BARRIER 06/16/2015 APPROVED DROCKWELL
INSULATION 06/16/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 6/16/2015 10:59:37 AM KITCHEN EXHAUST DUCT WIDER THAN WALL CAVITY BOTH SIDES AT TOP
ALL ROUGH 06/11/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 6/11/2015 1:10:24 PM CHECK HEAD AT INSULATION
ALL ROUGH 06/08/2015 Disapproved -FEE REQUIRED DROCKWELL
Note: Inspection Resulted at 6/8/2015 3:21:09 PM COMPLETE PLUMBING REPAIR AT TOILET/NEED 5FT WATER TEST ON SANITARY LINES/NO PRESURE ON SUPPLY SIDE/FILL TUB BOX WITH APPROVED MATERIAL/NAIL PLATE AT DRYER DUCT TOP PLATE BOTH SIDES/
WINDOW NAILING 06/04/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 6/4/2015 3:48:08 PM SLIDER DOOR TRACK INSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/20/2015 APPROVED DROCKWELL
TIE BEAM / LINTEL 05/13/2015 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 05/12/2015 APPROVED FREODICA
MONOLITHIC SLAB 05/04/2015 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 04/29/2015 APPROVED DROCKWELL
ELECTRIC TEMP POLE 04/24/2015 APPROVED JHINDMAN

Review History

Department Status Date In Date Out
SW1 HOLD 09/08/2015 09/08/2015
Note: Held By: DREWIS Inverts are to too high. -DC. Rewis 9864736
SW1 HOLD 09/04/2015 09/04/2015
Note: Held By: DREWIS Please provide culvert invert measurement and set back measurement for front patio. -DC. Rewis 9864736
BLD COMPLETE 07/30/2015 07/31/2015
Note: Driveway revision. No vertical structure.
ENGIN1 COMPLETE 07/30/2015 07/30/2015
SW1 COMPLETE 07/30/2015 07/30/2015
UD1 COMPLETE 07/30/2015 07/31/2015
Note: see notes
ZON COMPLETE 07/30/2015 07/31/2015
SW1 COMPLETE 07/28/2015 07/28/2015
ZON COMPLETE 07/28/2015 07/29/2015
SW1 COMPLETE 05/11/2015 05/12/2015
Note: Released By: FREODICA foundation survey Note: Setback dimensions are different from approved site plan but still within limits per Tracey. Revised file copy will be done on final survey.
ZON COMPLETE 04/10/2015 04/13/2015
URB COMPLETE 04/10/2015 04/13/2015
PLUM COMPLETE 04/02/2015 04/07/2015
MECH COMPLETE 04/02/2015 04/07/2015
BLD COMPLETE 04/02/2015 04/07/2015
ZON HOLD 04/02/2015 04/02/2015
Note: Pending completed, recorded Binding Lot Agreement.
URB HOLD 04/02/2015 04/02/2015
Note: Need to add 2 FL#1 30 gallon shade trees 2" @ 6" 8' in height when planted. No credit for Robellini palms or Existing pine trees .FYI Sabal palm used as a understory tree must have a min. of 3' of clear trunk to receive credit.
ELEC COMPLETE 04/02/2015 04/07/2015
BLD HOLD 03/25/2015 03/26/2015
Note: 1. Plans shall be signed and sealed by Florida registered engineer per 2010 FBC 107.2.1. 2. Provide design criteria per 2010 FBCR 301. 3. Provide garage/house opening protection per 2010 FBCR 302.5.
ELEC HOLD 03/25/2015 03/27/2015
Note: 1. Provide GFCI receptacles at master bathroom vanity per 2008 NEC 210.8. 2.Provide electrical receptacles between the doors and the closets in the small bedrooms per 2008 NEC 210.52. 3. Provide electrical load calculations per 2008 NEC art.220. 4.Provide original signed and sealed plans per state statute and 2010 FBC 107.1.
ENGIN1 COMPLETE 03/25/2015 03/26/2015
Note: Swale plan to be issued at a later date.
MECH HOLD 03/25/2015 03/26/2015
Note: 1. Provide hvac plan with signature and license number of hvac contractor per 2010 FBC 107.2.1. 2. Energy Performance Level (EPL) Display Card on energy calculation shall be signed by the builder per 2010 FBCEC 405.4.3.
PLUM HOLD 03/25/2015 03/26/2015
Note: Provide sanitary riser diagram with signature and license number of plumbing contractor per 2010 FBC 107.2.1.
SW1 COMPLETE 03/25/2015 03/26/2015
UD1 COMPLETE 03/25/2015 03/26/2015
Note: See Comments
URB HOLD 03/25/2015 03/26/2015
Note: If using a site plan for landscaping you must write in Bold ( For Landscape Use Only ) on the plan
ZON HOLD 03/25/2015 03/26/2015
Note: 1. Site plan and boundary survey must show lot square footages. 2. Provide completed, recorded Binding Lot Agreement. 3. Foundation plantings are required along the entire front foundation of the home. A/C equipment must be screened.
SW1 COMPLETE 09/14/2015
Note: Released By: DREWIS

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 09/15/2015
REINSPECTION FEE ¤40.00 09/15/2015
REINSPECTION FEE ¤40.00 07/30/2015
REINSPECTION FEE ¤40.00 06/09/2015
NEW RESIDENTIAL INSPECTIONS ¤432.00 04/17/2015
SITE PLAN 20 ¤20.00 04/17/2015
SURCHARGE FS 533.721 ¤16.61 04/17/2015
SURCHARGE - FS 468.631 ¤16.61 04/17/2015
STORM WATER PERMIT FEES ¤80.00 04/17/2015
3% TRANS IMPACT FEE CREDIT (¤91.51) 04/17/2015
ADMIN FEE ¤20.00 04/17/2015
ELECTRIC FEE ¤189.60 04/17/2015
3% FIRE IMPACT FEE CREDIT (¤6.33) 04/17/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤211.11 04/17/2015
IMPACT FEE PARKS ¤849.24 04/17/2015
IMPACT FEE SCHOOL ¤3,600.00 04/17/2015
RECORDING FEE REIMBURSE DOC ¤35.50 04/17/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 04/17/2015
MECHANICAL FEE ¤189.60 04/17/2015
3% PARKS IMPACT FEE CREDIT (¤25.48) 04/17/2015
PLAN CHECK FEE ¤86.40 04/17/2015
PLUMBING FEE ¤189.60 04/17/2015
Fees Total Due: ¤0.00 Total Paid: ¤9,023.19