Permit #2015040275

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-0400
CONDITIONED SPACE: 3048 sqft
GARAGE: 1050 sqft
OPENED PORCH (WITH ROOF) : 772 sqft
OPENED PORCH (WITH ROOF) : 37 sqft
Total Square Footage: 4907 sqft
Block: 00000
Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II
Job Phone: 386-236-4133
Location Address: 5 SCARLET OAK CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/08/2015
NOC: RECORDED
Applicant name: KEVIN MICHAEL MAYS
Owner: HOPKINS, JOAN A & RALPH F

Address

7306 WESTWOOD DRIVE

FREDERICK, MD 21701

Lot: 0400
Contracted Stated Job Value: ¤412,250.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INTERVEST CONSTRUCTION, INC
Status Location Address State License Number Phone Fax
CANCEL

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

CGC1517573 (Exp: 08/31/2018) 386-236-4133 386-763-7833

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
CHRIS C KOONTZ
Status Location Address State License Number Phone Fax
INACTIVE

651 CARSWELL AVE

Holly Hill, FL 32117

CAC035563 (Exp: 08/31/2024) (386) 252-1878 (386)252-9703
GARY WAYNE EVERS
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 740106

ORANGE CITY, FL 32763

CFC050566 (Exp: 08/31/2026) 386-775-0909 386-775-0918
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701
KEN DEPRINZIO
Status Location Address State License Number Phone Fax
ACTIVE

325 WALKER STREET

HOLLY HILL, FL 32117

11351 (Exp: 08/31/2026) 386-672-8494 386-673-7856

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 10/21/2015 FINAL APPROVED MBACON
BLD - BUILDING FINAL 10/20/2015 FINAL APPROVED LMILLER
ROW FINAL 10/19/2015 APPROVED GLALIMA
FINAL SURVEY (OFFICE USE ONLY) 10/13/2015 APPROVED DREWIS
PRE-APRON (PRE-POUR/DRIVEWAY) 10/07/2015 APPROVED GLALIMA
Note: THIS INSPECTION WAS FOR REPLACEMENT OF '''''' DAMAGED '''''VALLEY GUTTERS AT STREET
FINAL APRON (AFTER POUR/DRIVEWAY) 10/07/2015 APPROVED GLALIMA
ELECTRIC - EARLY POWER 09/28/2015 APPROVED DROCKWELL
PRE-APRON (PRE-POUR/DRIVEWAY) 09/21/2015 APPROVED GLALIMA
Note: THIS IS A REINSPECTION INSPECTION WAS PERFORMED ON 9 / 18 / 2015 GARY LALIMA
PRE-APRON (PRE-POUR/DRIVEWAY) 09/18/2015 CANCELLED BY APPLICANT GLALIMA
Note: THIS IS A REINSPECTION
PRE-APRON (PRE-POUR/DRIVEWAY) 09/17/2015 PARTIALLY APPROVED GLALIMA
Note: STREET GUTTER ONLY READY TO POUR
INSULATION 08/21/2015 APPROVED LMILLER
INSULATION 08/20/2015 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 8/20/2015 3:26:14 PM MISSING BAFFLES IN GAREGE ON INSULATION INSPECTION, FOAM WIRING AT TOP OF ELECTRIC PANEL
LATH/BRICK/ WATER BARRIER 08/20/2015 APPROVED LMILLER
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 08/19/2015 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 8/19/2015 10:59:31 AM NEED TO HAVE CORNERBEAD ON ROUND WALL IN ORDER TO ACHIEVE 7/8" STUCCO AND MISSING WEEP SCREED AT BOTTOM FBC 703.1
ALL ROUGH 08/14/2015 APPROVED DROCKWELL
WALL SHEATHING 08/12/2015 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 08/07/2015 APPROVED CMINI
U - SEWER TIE IN 08/07/2015 APPROVED MBACON
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/30/2015 APPROVED DROCKWELL
WALL SHEATHING 07/30/2015 CANCELLED BY APPLICANT DROCKWELL
ELECTRIC-TUG 07/02/2015 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 7/2/2015 11:35:59 AM SPOKE TO SUSAN AT FPL 11:05A.M
ELECTRIC-TUG 06/30/2015 Disapproved -FEE REQUIRED RMARTIN
Note: Inspection Resulted at 6/30/2015 12:08:24 PM RIGHT SIDE PANEL WIRES ARE LOOSE, NEED TO BE TORQUED PER SPEC. NEC 110.14
TIE BEAM / LINTEL 06/29/2015 APPROVED DROCKWELL
ELEV CERT-FOUNDATION APPROVAL 06/24/2015 APPROVED CBENTLEY
FOUND SURVEY APPROVED (OFFICE) 06/24/2015 APPROVED DREWIS
MONOLITHIC SLAB 06/15/2015 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 06/11/2015 APPROVED DROCKWELL

Review History

Department Status Date In Date Out
PLFM COMPLETE 10/21/2015 10/22/2015
SW1 COMPLETE 10/13/2015 10/13/2015
Note: Released By: DREWIS FINAL S
PLFM COMPLETE 06/24/2015 06/24/2015
SW1 COMPLETE 06/24/2015 06/24/2015
Note: Released By: DREWIS foundation s
MECH COMPLETE 04/24/2015 04/28/2015
SW1 COMPLETE 04/24/2015 04/27/2015
BLD COMPLETE 04/09/2015 04/13/2015
ELEC COMPLETE 04/09/2015 04/13/2015
ENGIN1 COMPLETE 04/09/2015 04/13/2015
Note: No swale plan required.
MECH HOLD 04/09/2015 04/09/2015
Note: 1. Provide the manufacturer and model number of outdoor and indoor units along with sensible and total cooling capacities at the design conditions serving the master bedroom and bedroom 4/study per 2010 FBCEC 403.6.1. 2. Provide duct size of main supply air to bedrooms 2, 3 and their bathrooms per 2010 FBC 107.2.1. 3. Clarify the total CFM for HPX-24 as shown on hvac plan per 2010 FBC 107.2.1.
PLFM COMPLETE 04/09/2015 04/10/2015
PLUM COMPLETE 04/09/2015 04/09/2015
SW1 HOLD 04/09/2015 04/13/2015
Note: 1. Provide a minimum finish floor elevation of 12.0' per the approved subdivision drainage plan.
UD1 COMPLETE 04/09/2015 04/10/2015
Note: See Comments
URB COMPLETE 04/09/2015 04/09/2015
ZON COMPLETE 04/09/2015 04/10/2015

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 10/15/2015
REVISION (¤40.00) 10/15/2015
REINSPECTION FEE ¤40.00 10/07/2015
REINSPECTION FEE ¤40.00 10/07/2015
REINSPECTION FEE ¤40.00 10/07/2015
NEW RESIDENTIAL INSPECTIONS ¤830.00 05/08/2015
SITE PLAN 20 ¤20.00 05/08/2015
SURCHARGE FS 533.721 ¤29.15 05/08/2015
SURCHARGE - FS 468.631 ¤29.15 05/08/2015
STORM WATER PERMIT FEES ¤80.00 05/08/2015
3% TRANS IMPACT FEE CREDIT (¤91.51) 05/08/2015
ADMIN FEE ¤20.00 05/08/2015
ELECTRIC FEE ¤309.00 05/08/2015
3% FIRE IMPACT FEE CREDIT (¤6.33) 05/08/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤211.11 05/08/2015
IMPACT FEE PARKS ¤849.24 05/08/2015
IMPACT FEE SCHOOL ¤3,600.00 05/08/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 05/08/2015
MECHANICAL FEE ¤309.00 05/08/2015
3% PARKS IMPACT FEE CREDIT (¤25.48) 05/08/2015
PLAN CHECK FEE ¤166.00 05/08/2015
PLUMBING FEE ¤309.00 05/08/2015
Fees Total Due: ¤0.00 Total Paid: ¤9,808.57