Permit #2015040638
Permit Details
Status: COED
| Parcel Id: 07-11-31-7014-00020-1030 |
| CONDITIONED SPACE: 2453 sqft |
| GARAGE: 506 sqft |
| OPENED PORCH (WITH ROOF) : 315 sqft |
| OPENED PORCH (WITH ROOF) : 109 sqft |
| Total Square Footage: 3383 sqft |
| Block: 00020 |
| Subdivision: 2202 - SECTION 14-COUNTRY CLUB COVE |
| Job Phone: (386)446-5161 |
| Location Address: 51 COLLINGWOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/29/2015 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: CHENG XU JIN |
|
Address 25 CLERMONT CT PALM COAST, FL 32137 |
| Lot: 1030 |
| Contracted Stated Job Value: ¤285,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
PAUL S AIELLO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 351926 PALM COAST, FL 32137 |
CAC1815808 (Exp: 08/31/2016) | (386)239-0053 | (386)323-1955 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOANNA S REELEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2 MARKET PLACE D PALM COAST, FL 32137 |
CCC1327485 (Exp: 08/31/2020) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 05/19/2016 | FINAL APPROVED | JNICHOLS |
| BLD - BUILDING FINAL | 05/18/2016 | FINAL APPROVED | CMINI |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 04/28/2016 | APPROVED | GLALIMA |
| Note: PER HUGO | |||
| ROW FINAL | 04/28/2016 | APPROVED - AS NOTED | GLALIMA |
| Note: YOU NEED TO GET THE SEAWALL GUY BACK AND REPAIR THE SEEM / GAP ''' RIGHT REAR | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/07/2016 | APPROVED | DREWIS |
| ELECTRIC - EARLY POWER | 02/23/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: Inspection Resulted at 2/23/2016 1:55:36 PM SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:00 | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 02/22/2016 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION READY TO POUR AND PLACE PAVERS. | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 02/18/2016 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: # 1 COULD NOT SEE EDGE OF ROAD BECAUSE OF DAMAGE # 2 REMOVE TOILET FROM THE END OF CULVERT PIPE # 2 SO WE CAN SEE THE CENTER LINE OF SWALE AND BASIN . AND YOU DID NOT SHOW ME THE LOCATION OF EDGE OF ROAD. SO CLEAN IT UP THANK YOU ''''' 3 PICTURE | |||
| U - SEWER TIE IN | 01/27/2016 | APPROVED | MBACON |
| GRAVITY SEWER TEST | 01/27/2016 | APPROVED | CMINI |
| INSULATION | 11/24/2015 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 11/23/2015 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 11/23/2015 11:56:10 AM NEED FOAM AT ELECTRIC THROUGH GARAGE FRAMED WALL, AND AT TOP BAND IN BEDROOMS 2, AND 3 EMPTY HOLES FOR WIRE HOLES DRILLED FOR WIRE: FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL(WITH APPROVED MATERIAL) | |||
| LATH/BRICK/ WATER BARRIER | 11/20/2015 | APPROVED | CMINI |
| ALL ROUGH | 11/17/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 11/17/2015 10:45:19 AM NEED TO PHASE OUT HOT CONDUCTORS IN PANEL.210.5(C).. THERAPUTIC SPA MOTOR NEEDS TO BE BONDED AT LUG THAT IS SUPPLIED. NEC 680.62(2)B BONDING | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2015 | APPROVED | CMINI |
| ELECTRIC-TUG | 09/11/2015 | APPROVED - AS NOTED | RMARTIN |
| Note: Inspection Resulted at 9/11/2015 3:34:29 PM SPOKE TO SUSAN FPL RELEASED POWER 1:50 | |||
| TIE BEAM / LINTEL | 09/10/2015 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 09/08/2015 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 08/21/2015 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/19/2015 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/06/2016 | 04/07/2016 |
| Note: Released By: DREWIS FINAL S | |||
| ZON | COMPLETE | 03/11/2016 | 03/15/2016 |
| ENGIN1 | COMPLETE | 02/02/2016 | 02/04/2016 |
| SW1 | COMPLETE | 02/02/2016 | 02/02/2016 |
| UD1 | COMPLETE | 02/02/2016 | 02/03/2016 |
| Note: See original notes. | |||
| ZON | COMPLETE | 02/02/2016 | 02/03/2016 |
| BLD | COMPLETE | 10/26/2015 | 10/26/2015 |
| Note: Revision- Truss repair on trusses T28, T29, T30 and T37. | |||
| SW1 | COMPLETE | 09/08/2015 | 09/08/2015 |
| Note: Released By: DREWIS foundation s | |||
| BLD | COMPLETE | 08/12/2015 | 08/14/2015 |
| BLD | HOLD | 07/08/2015 | 07/08/2015 |
| Note: Revision Provide elevation drawings affected by the changes per 2010 FBC 107.2.1. | |||
| ENGIN1 | COMPLETE | 07/08/2015 | 07/08/2015 |
| UD1 | COMPLETE | 07/08/2015 | 07/09/2015 |
| ZON | COMPLETE | 07/08/2015 | 07/14/2015 |
| URB | COMPLETE | 04/28/2015 | 04/28/2015 |
| Note: FYI the HVAC needs the 7 gal. 30" tall @ planting (E) and foundation needs 3 gal. shrubbery | |||
| ZON | COMPLETE | 04/28/2015 | 04/28/2015 |
| BLD | COMPLETE | 04/21/2015 | 04/21/2015 |
| ELEC | COMPLETE | 04/21/2015 | 04/21/2015 |
| ENGIN1 | COMPLETE | 04/21/2015 | 04/22/2015 |
| Note: Swale plan to be issued at a later date. | |||
| MECH | COMPLETE | 04/21/2015 | 04/21/2015 |
| PLUM | COMPLETE | 04/21/2015 | 04/21/2015 |
| SW1 | COMPLETE | 04/21/2015 | 04/21/2015 |
| UD1 | COMPLETE | 04/21/2015 | 04/22/2015 |
| Note: See Comments | |||
| URB | HOLD | 04/21/2015 | 04/22/2015 |
| Note: Foundation shrubs are required for the rear of house. | |||
| ZON | HOLD | 04/21/2015 | 04/22/2015 |
| Note: 1. Foundation plantings are required along rear of home facing saltwater canal. 2. Banding is required around all windows and doors facing saltwater canal. | |||
| BLD | COMPLETE | 07/09/2015 | |
| Note: Revision |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 05/20/2016 |
| REVISION | ¤40.00 | 05/20/2016 |
| REVISION | ¤40.00 | 05/20/2016 |
| REINSPECTION FEE | ¤40.00 | 05/20/2016 |
| REINSPECTION FEE | ¤40.00 | 05/20/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤620.00 | 04/29/2015 |
| SITE PLAN 20 | ¤20.00 | 04/29/2015 |
| SURCHARGE FS 533.721 | ¤22.53 | 04/29/2015 |
| SURCHARGE - FS 468.631 | ¤22.53 | 04/29/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/29/2015 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.51) | 04/29/2015 |
| ADMIN FEE | ¤20.00 | 04/29/2015 |
| ELECTRIC FEE | ¤246.00 | 04/29/2015 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.33) | 04/29/2015 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤211.11 | 04/29/2015 |
| IMPACT FEE PARKS | ¤849.24 | 04/29/2015 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/29/2015 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 04/29/2015 |
| IMPACT FEE TRANSPORTATION | ¤3,050.24 | 04/29/2015 |
| MECHANICAL FEE | ¤246.00 | 04/29/2015 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/29/2015 |
| PLAN CHECK FEE | ¤124.00 | 04/29/2015 |
| PLUMBING FEE | ¤246.00 | 04/29/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,486.83 |