I want to search for...
Permit #2015040755
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00210-0380 |
| CONDITIONED SPACE: 2478 sqft |
| GARAGE: 508 sqft |
| SCREEN PORCH (SOLID ROOF) : 340 sqft |
| OPENED PORCH (WITH ROOF) : 169 sqft |
| Total Square Footage: 3495 sqft |
| Block: 00210 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: (386)446-5161 |
| Location Address: 69 FAIRCASTLE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/27/2015 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: RONG WAN |
|
Address 69 FAIRCASTLE LANE PALM COAST, FL 32164 |
| Lot: 0380 |
| Contracted Stated Job Value: ¤285,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
PAUL S AIELLO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 351926 PALM COAST, FL 32137 |
CAC1815808 (Exp: 08/31/2016) | (386)239-0053 | (386)323-1955 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOANNA S REELEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2 MARKET PLACE D PALM COAST, FL 32137 |
CCC1327485 (Exp: 08/31/2020) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/02/2016 | FINAL APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 03/02/2016 | FINAL APPROVED | MBACON |
| ROW FINAL | 02/25/2016 | FINAL APPROVED | CTROHA |
| Note: APPROVED | |||
| BLD - BUILDING FINAL | 02/25/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 2/25/2016 11:49:56 AM SPACES AROUND PIPES MUST BE SEALED….SEALING OF ANNULAR SPACES…P2606.1 HOLES IN WALLS MUST BE SEALED: FBC ENERGY CONSERVATION RESIDENTIAL PROVISIONS CHAPTER 4- R402.4.1 BUILDING THERMAL ENVELOPE, R402.4 1.1 AIR LEAKAGE (MANDATORY). INSTALLATION, R402.4, OPENINGS AND PENETRATIONS THROUGH WALLS OR CEILINGS SEPARATING THE DWELLING UNIT FROM THE GARAGE SHALL NOT BE PERMITTED FBC. R302.5 DISCONNECT NEEDED WITHIN SIGHT OF AND READILY ACCESSIBLE OF AIR CONDITIONING UNIT..NEC 440.14 GFCI STICKERS MUST BE APPLIED PER MANUFACTURER INSTRUCTIONS | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 01/26/2016 | APPROVED | CTROHA |
| Note: COMPLETE | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/12/2016 | APPROVED | DREWIS |
| ELECTRIC - EARLY POWER | 11/25/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 11/25/2015 2:02:18 PM CALLED FPL TO RELEAE POWER, SPOKE WITH DELL | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 11/09/2015 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION WORKING ON SLOPE, READY TO POUR | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 11/06/2015 | Disapproved -FEE REQUIRED | CTROHA |
| Note: SITE MEET WITH MATT DISCUSSED WHAT NEEDED TO BE CORRECTED ON SLOPE OF APRON AND ENCASE PIPE IN CONCRETE TO REDUCE SLOPE TO LESS THAN 10% | |||
| U - SEWER TIE IN | 09/04/2015 | APPROVED | MBACON |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 09/03/2015 | Disapproved - NO FEE | MBACON |
| Note: Inspection Resulted at 9/3/2015 9:11:23 AM HOLE IS FULL OF WATER | |||
| GRAVITY SEWER TEST | 09/03/2015 | APPROVED | CMINI |
| INSULATION | 08/18/2015 | APPROVED | JCOLASANTI |
| ALL ROUGH | 08/10/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 8/10/2015 12:08:02 PM RE-INSTALL FIREBLOCKING AT DROP MASTER WALL/TIGHTEN ALL THREADED RODS | |||
| LATH/BRICK/ WATER BARRIER | 08/10/2015 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/01/2015 | APPROVED | CMINI |
| ELECTRIC-TUG | 06/22/2015 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 06/17/2015 | FINAL APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 06/10/2015 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 05/28/2015 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/21/2015 | APPROVED | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 01/12/2016 | 01/12/2016 |
| Note: Released By: DREWIS final s | |||
| ENGIN1 | COMPLETE | 10/26/2015 | 10/26/2015 |
| SW1 | COMPLETE | 10/26/2015 | 10/27/2015 |
| URB | COMPLETE | 10/26/2015 | 10/27/2015 |
| ZON | COMPLETE | 10/26/2015 | 10/27/2015 |
| SW1 | COMPLETE | 06/09/2015 | 06/10/2015 |
| Note: Released By: JHINDMAN foundation s | |||
| BLD | COMPLETE | 04/23/2015 | 04/23/2015 |
| ELEC | COMPLETE | 04/23/2015 | 04/23/2015 |
| ENGIN1 | COMPLETE | 04/23/2015 | 04/23/2015 |
| Note: Swale plan to be issued at a later date. | |||
| MECH | COMPLETE | 04/23/2015 | 04/23/2015 |
| PLUM | COMPLETE | 04/23/2015 | 04/23/2015 |
| SW1 | COMPLETE | 04/23/2015 | 04/23/2015 |
| UD1 | COMPLETE | 04/23/2015 | 04/24/2015 |
| Note: See Comments | |||
| URB | COMPLETE | 04/23/2015 | 04/24/2015 |
| Note: Prior to construction all saved trees will require a barricade. | |||
| ZON | COMPLETE | 04/23/2015 | 04/23/2015 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/10/2016 |
| REINSPECTION FEE | ¤40.00 | 03/10/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤634.00 | 04/27/2015 |
| SITE PLAN 20 | ¤20.00 | 04/27/2015 |
| SURCHARGE FS 533.721 | ¤22.97 | 04/27/2015 |
| SURCHARGE - FS 468.631 | ¤22.97 | 04/27/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/27/2015 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.51) | 04/27/2015 |
| ADMIN FEE | ¤20.00 | 04/27/2015 |
| ELECTRIC FEE | ¤250.20 | 04/27/2015 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.33) | 04/27/2015 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤211.11 | 04/27/2015 |
| IMPACT FEE PARKS | ¤849.24 | 04/27/2015 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/27/2015 |
| IMPACT FEE TRANSPORTATION | ¤3,050.24 | 04/27/2015 |
| MECHANICAL FEE | ¤250.20 | 04/27/2015 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/27/2015 |
| PLAN CHECK FEE | ¤126.80 | 04/27/2015 |
| PLUMBING FEE | ¤250.20 | 04/27/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,344.61 |