Permit #2015050518

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-0340
CONDITIONED SPACE: 2641 sqft
GARAGE: 604 sqft
OPENED PORCH (WITH ROOF) : 372 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
Total Square Footage: 3649 sqft
Block: 00000
Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II
Job Phone: 386-236-4133
Location Address: 16 SCARLET OAK CIR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/18/2015
NOC: RECORDED
Applicant name: KEVIN MICHAEL MAYS
Owner: INTERVEST CONSTRUCTION INC

Address

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

Lot: 0340
Contracted Stated Job Value: ¤333,672.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INTERVEST CONSTRUCTION, INC
Status Location Address State License Number Phone Fax
CANCEL

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

CGC1517573 (Exp: 08/31/2018) 386-236-4133 386-763-7833

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
CHRIS C KOONTZ
Status Location Address State License Number Phone Fax
INACTIVE

651 CARSWELL AVE

Holly Hill, FL 32117

CAC035563 (Exp: 08/31/2024) (386) 252-1878 (386)252-9703
GARY WAYNE EVERS
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 740106

ORANGE CITY, FL 32763

CFC050566 (Exp: 08/31/2026) 386-775-0909 386-775-0918
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 12/07/2015 FINAL APPROVED JNICHOLS
BLD - BUILDING FINAL 12/04/2015 FINAL APPROVED LMILLER
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 12/03/2015 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 12/3/2015 2:03:24 PM FLEX DUCT THRU FIRE RATED ASSEMBLY PROHIBITED.. FLOOR,CEILING,WALL.FBC.R..M1601.1.2.7. HOLES IN WALLS MUST BE SEALED: FBC ENERGY CONSERVATION RESIDENTIAL PROVISIONS CHAPTER 4- R402.4.1 BUILDING THERMAL ENVELOPE, R402.4 1.1 AIR LEAKAGE (MANDATORY). INSTALLATION, R402.4, OPENINGS AND PENETRATIONS THROUGH WALLS OR CEILINGS SEPARATING THE DWELLING UNIT FROM THE GARAGE SHALL NOT BE PERMITTED FBC. R302.5. WEATHER STRIPPING NEEDS TO BE INSTALLED FOR FINAL ON DOORS R 612.12 FBC
ROW FINAL 12/02/2015 APPROVED CTROHA
ELECTRIC - EARLY POWER 11/19/2015 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 11/19/2015 2:48:18 PM CALLED DELL FROM FPL TO RELEASE POWER
ELECTRIC - EARLY POWER 11/18/2015 CANCELLED BY APPLICANT RMARTIN
FINAL APRON (AFTER POUR/DRIVEWAY) 11/17/2015 APPROVED - AS NOTED GLALIMA
Note: WILL CHECK FINAL SERVEY AT TIME OF ROW INSPECTIONS, FOR GRADE ELEVATIONS AND DRIVEWAY PLACEMENT
FINAL SURVEY (OFFICE USE ONLY) 11/13/2015 APPROVED DREWIS
PRE-APRON (PRE-POUR/DRIVEWAY) 10/29/2015 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
PRE-APRON (PRE-POUR/DRIVEWAY) 10/28/2015 PARTIALLY APPROVED GLALIMA
Note: PRE APRON AND SIDE WALKS
INSULATION 10/02/2015 APPROVED DROCKWELL
LATH/BRICK/ WATER BARRIER 10/02/2015 APPROVED DROCKWELL
ALL ROUGH 09/29/2015 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 9/29/2015 2:17:03 PM FILL GUEST TUB BOX WITH APPROVED MATERIAL
WALL SHEATHING 09/23/2015 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/22/2015 APPROVED DROCKWELL
Note: Inspection Resulted at 9/22/2015 3:06:04 PM CHECK THAT KNEE WALLS AT ENTRY ARE ANCHORED
TIE BEAM / LINTEL 08/11/2015 APPROVED DROCKWELL
ELECTRIC-TUG 08/11/2015 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 8/11/2015 11:52:15 AM SPOKE TO SUSAN AT FPL RELEASED POWER FOR TUG 11:50
GRAVITY SEWER TEST 08/07/2015 APPROVED CMINI
ELEV CERT-FOUNDATION APPROVAL 08/07/2015 APPROVED CBENTLEY
FOUND SURVEY APPROVED (OFFICE) 08/07/2015 APPROVED DREWIS
U - SEWER TIE IN 08/07/2015 APPROVED MBACON
MONOLITHIC SLAB 07/22/2015 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 07/20/2015 APPROVED CMINI

Review History

Department Status Date In Date Out
PLFM COMPLETE 11/30/2015 11/30/2015
PLFM HOLD 11/20/2015 11/23/2015
Note: 1. Revise Section B9 to 10ths.
PLFM HOLD 11/18/2015 11/19/2015
Note: Held By: CBENTLEY 1. During a recent audit of the elevation certificates Floodplain Managment Staff was informed by FEMA that Section B9 had to be in 10ths. Please revise the elevation certificate to show 10ths rather than the 9'.
SW1 COMPLETE 11/13/2015 11/13/2015
Note: Released By: DREWIS final survey
PLFM COMPLETE 08/07/2015 08/07/2015
BLD COMPLETE 08/07/2015 08/07/2015
SW1 COMPLETE 08/06/2015 08/07/2015
Note: Released By: DREWIS foundation s
BLD HOLD 07/01/2015 07/01/2015
Note: 1. Provide Florida product approval for the new door.
MECH COMPLETE 06/16/2015 06/16/2015
MECH HOLD 06/15/2015 06/15/2015
Note: Previous comment item 2 shall be addressed. 2. Provide the efficiency rating of selected hvac units from the manufacturer's performance data per 2010 FBCEC 403.6.2.1.
PLFM COMPLETE 05/20/2015 05/20/2015
BLD COMPLETE 05/18/2015 05/19/2015
ELEC COMPLETE 05/18/2015 05/19/2015
ENGIN1 COMPLETE 05/18/2015 05/19/2015
Note: No swale plan required.
MECH HOLD 05/18/2015 05/19/2015
Note: 1. Provide balanced return air from study room per 2010 FBCR M 1602.4. 2. Provide the efficiency rating of selected hvac units from the manufacturer's performance data per 2010 FBCEC 403.6.2.1.
PLUM COMPLETE 05/18/2015 05/19/2015
SW1 COMPLETE 05/18/2015 05/18/2015
UD1 COMPLETE 05/18/2015 05/19/2015
Note: See Notes
ZON COMPLETE 05/18/2015 05/20/2015
URB COMPLETE 05/18/2015 05/19/2015

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/10/2015
REVISION ¤40.00 12/03/2015
SITE PLAN 20 ¤20.00 06/18/2015
SURCHARGE FS 533.721 ¤24.04 06/18/2015
SURCHARGE - FS 468.631 ¤24.04 06/18/2015
STORM WATER PERMIT FEES ¤80.00 06/18/2015
3% TRANS IMPACT FEE CREDIT (¤91.51) 06/18/2015
NEW RESIDENTIAL INSPECTIONS ¤668.00 06/18/2015
ADMIN FEE ¤20.00 06/18/2015
ELECTRIC FEE ¤260.40 06/18/2015
3% FIRE IMPACT FEE CREDIT (¤6.33) 06/18/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤211.11 06/18/2015
IMPACT FEE PARKS ¤849.24 06/18/2015
IMPACT FEE SCHOOL ¤3,600.00 06/18/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 06/18/2015
MECHANICAL FEE ¤260.40 06/18/2015
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/18/2015
PLAN CHECK FEE ¤133.60 06/18/2015
PLUMBING FEE ¤260.40 06/18/2015
Fees Total Due: ¤0.00 Total Paid: ¤9,418.15