Permit #2015050520

Permit Details

Status: COED

Parcel Id: 22-11-31-5903-00000-0160
CONDITIONED SPACE: 2358 sqft
GARAGE: 646 sqft
OPENED PORCH (WITH ROOF) : 177 sqft
OPENED PORCH (WITH ROOF) : 29 sqft
Total Square Footage: 3210 sqft
Block: 00000
Subdivision: 1208 - VILLAGE I-1 AT GRAND HAVEN
Job Phone: 386-236-4133
Location Address: 10 SAND PINE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/18/2015
NOC: RECORDED
Applicant name: KEVIN MICHAEL MAYS
Owner: INTERVEST CONSTRUCTION INC

Address

2379 BEVILLE TOAD

DAYTONA BEACH, FL 32119

Lot: 0160
Contracted Stated Job Value: ¤300,532.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INTERVEST CONSTRUCTION, INC
Status Location Address State License Number Phone Fax
CANCEL

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

CGC1517573 (Exp: 08/31/2018) 386-236-4133 386-763-7833

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
CHRIS C KOONTZ
Status Location Address State License Number Phone Fax
INACTIVE

651 CARSWELL AVE

Holly Hill, FL 32117

CAC035563 (Exp: 08/31/2024) (386) 252-1878 (386)252-9703
GARY WAYNE EVERS
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 740106

ORANGE CITY, FL 32763

CFC050566 (Exp: 08/31/2026) 386-775-0909 386-775-0918
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701

Inspection History

Type Request Date Result Inspector
U - SEWER TIE IN 12/01/2015 APPROVED MBACON
U -UTILITY RESIDENTIAL FINAL 12/01/2015 FINAL APPROVED MBACON
ROW FINAL 11/30/2015 FINAL APPROVED GLALIMA
BLD - BUILDING FINAL 11/30/2015 FINAL APPROVED LMILLER
ELECTRIC - EARLY POWER 11/20/2015 APPROVED DROCKWELL
FINAL SURVEY (OFFICE USE ONLY) 11/17/2015 APPROVED DREWIS
FINAL APRON (AFTER POUR/DRIVEWAY) 11/17/2015 APPROVED GLALIMA
PRE-APRON (PRE-POUR/DRIVEWAY) 10/29/2015 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
PRE-APRON (PRE-POUR/DRIVEWAY) 10/28/2015 PARTIALLY APPROVED GLALIMA
Note: PRE APRON AND SIDEWALK
LATH/BRICK/ WATER BARRIER 10/09/2015 APPROVED DROCKWELL
INSULATION 10/06/2015 APPROVED DROCKWELL
ALL ROUGH 10/02/2015 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ALL ROUGH 09/30/2015 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 9/30/2015 11:36:23 AM NEED REVISION ON ELECTRIC BY INSULATION INSPECTION. NAIL PLATES ON ELECTRIC NEC.300.4 MISSING NAIL PLATES TRHOUGHOUT, MISSING GFCI IN COMMON BATH (PLAN SHOWS TWO) ELECTRIC OUT OF WALL IN COMMON BATH.
WALL SHEATHING 09/29/2015 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
WALL SHEATHING 09/25/2015 Disapproved - NO FEE DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 9/25/2015 2:37:40 PM PROVIDE BLOCKING AT WALL SHEATHING LOCATIONS SO NAILING PATTERN REQUIREMENTS CAN BE MET
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/25/2015 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 9/25/2015 2:37:39 PM CORRECTIONS MADE DURING INSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/24/2015 CANCELLED BY APPLICANT DROCKWELL
WALL SHEATHING 09/24/2015 CANCELLED BY APPLICANT DROCKWELL
GRAVITY SEWER TEST 08/28/2015 APPROVED DROCKWELL
TIE BEAM / LINTEL 08/18/2015 APPROVED DROCKWELL
ELECTRIC-TUG 08/14/2015 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 8/14/2015 1:35:59 PM SPOKE TO DELL FPL RELEASED POWER 1:21
FOUND SURVEY APPROVED (OFFICE) 08/14/2015 APPROVED DREWIS
MONOLITHIC SLAB 07/30/2015 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 07/28/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 07/27/2015 Disapproved - NO FEE DROCKWELL
Note: Inspection Resulted at 7/27/2015 2:32:57 PM PROVIDE LOOP FOR SHUT-OFF IN GARAGE/REVISE RISER TO AS-BUILT

Review History

Department Status Date In Date Out
ELEC COMPLETE 10/06/2015 10/08/2015
SW1 COMPLETE 08/13/2015 08/14/2015
Note: Released By: DREWIS FOUNDATION S
MECH COMPLETE 06/16/2015 06/16/2015
MECH HOLD 06/15/2015 06/15/2015
Note: Previous comment shall be addressed. Provide the manufacturer, model number of outdoor and indoor units along with sensible and total cooling capacities at the design conditions per 2010 FBCEC 403. 6.1.
UD1 COMPLETE 06/15/2015 06/16/2015
Note: See notes
ZON COMPLETE 06/15/2015 06/15/2015
BLD COMPLETE 05/18/2015 05/19/2015
ELEC COMPLETE 05/18/2015 05/19/2015
ENGIN1 COMPLETE 05/18/2015 05/19/2015
Note: No swale plan required.
MECH HOLD 05/18/2015 05/18/2015
Note: Provide the manufacturer, model number of outdoor and indoor units along with sensible and total cooling capacities at the design conditions per 2010 FBCEC 403. 6.1.
PLUM COMPLETE 05/18/2015 05/18/2015
SW1 COMPLETE 05/18/2015 05/18/2015
UD1 HOLD 05/18/2015 05/19/2015
Note: See Notes
ZON HOLD 05/18/2015 05/20/2015
Note: Per LDC 13.03.03.B.3 Banding is required around all doors and windows facing the right-of-way.
URB COMPLETE 05/18/2015 05/19/2015
SW1 COMPLETE 11/17/2015
Note: Released By: DREWIS

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 11/17/2015
REINSPECTION FEE ¤40.00 11/17/2015
NEW RESIDENTIAL INSPECTIONS ¤602.00 06/18/2015
SITE PLAN 20 ¤20.00 06/18/2015
SURCHARGE FS 533.721 ¤21.96 06/18/2015
SURCHARGE - FS 468.631 ¤21.96 06/18/2015
STORM WATER PERMIT FEES ¤80.00 06/18/2015
3% TRANS IMPACT FEE CREDIT (¤91.51) 06/18/2015
ADMIN FEE ¤20.00 06/18/2015
ELECTRIC FEE ¤240.60 06/18/2015
3% FIRE IMPACT FEE CREDIT (¤6.33) 06/18/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤211.11 06/18/2015
IMPACT FEE PARKS ¤849.24 06/18/2015
IMPACT FEE SCHOOL ¤3,600.00 06/18/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 06/18/2015
MECHANICAL FEE ¤240.60 06/18/2015
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/18/2015
PLAN CHECK FEE ¤120.40 06/18/2015
PLUMBING FEE ¤240.60 06/18/2015
Fees Total Due: ¤0.00 Total Paid: ¤9,275.39