I want to search for...
Permit #2015050520
Permit Details
Status: COED
| Parcel Id: 22-11-31-5903-00000-0160 |
| CONDITIONED SPACE: 2358 sqft |
| GARAGE: 646 sqft |
| OPENED PORCH (WITH ROOF) : 177 sqft |
| OPENED PORCH (WITH ROOF) : 29 sqft |
| Total Square Footage: 3210 sqft |
| Block: 00000 |
| Subdivision: 1208 - VILLAGE I-1 AT GRAND HAVEN |
| Job Phone: 386-236-4133 |
| Location Address: 10 SAND PINE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/18/2015 |
| NOC: RECORDED |
| Applicant name: KEVIN MICHAEL MAYS |
| Owner: INTERVEST CONSTRUCTION INC |
|
Address 2379 BEVILLE TOAD DAYTONA BEACH, FL 32119 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤300,532.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
CGC1517573 (Exp: 08/31/2018) | 386-236-4133 | 386-763-7833 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
CHRIS C KOONTZ
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
651 CARSWELL AVE Holly Hill, FL 32117 |
CAC035563 (Exp: 08/31/2024) | (386) 252-1878 | (386)252-9703 |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
Inspection History
| Type | Request Date | Result | Inspector |
| U - SEWER TIE IN | 12/01/2015 | APPROVED | MBACON |
| U -UTILITY RESIDENTIAL FINAL | 12/01/2015 | FINAL APPROVED | MBACON |
| ROW FINAL | 11/30/2015 | FINAL APPROVED | GLALIMA |
| BLD - BUILDING FINAL | 11/30/2015 | FINAL APPROVED | LMILLER |
| ELECTRIC - EARLY POWER | 11/20/2015 | APPROVED | DROCKWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 11/17/2015 | APPROVED | DREWIS |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 11/17/2015 | APPROVED | GLALIMA |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 10/29/2015 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 10/28/2015 | PARTIALLY APPROVED | GLALIMA |
| Note: PRE APRON AND SIDEWALK | |||
| LATH/BRICK/ WATER BARRIER | 10/09/2015 | APPROVED | DROCKWELL |
| INSULATION | 10/06/2015 | APPROVED | DROCKWELL |
| ALL ROUGH | 10/02/2015 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 09/30/2015 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 9/30/2015 11:36:23 AM NEED REVISION ON ELECTRIC BY INSULATION INSPECTION. NAIL PLATES ON ELECTRIC NEC.300.4 MISSING NAIL PLATES TRHOUGHOUT, MISSING GFCI IN COMMON BATH (PLAN SHOWS TWO) ELECTRIC OUT OF WALL IN COMMON BATH. | |||
| WALL SHEATHING | 09/29/2015 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| WALL SHEATHING | 09/25/2015 | Disapproved - NO FEE | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/25/2015 2:37:40 PM PROVIDE BLOCKING AT WALL SHEATHING LOCATIONS SO NAILING PATTERN REQUIREMENTS CAN BE MET | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/25/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/25/2015 2:37:39 PM CORRECTIONS MADE DURING INSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/24/2015 | CANCELLED BY APPLICANT | DROCKWELL |
| WALL SHEATHING | 09/24/2015 | CANCELLED BY APPLICANT | DROCKWELL |
| GRAVITY SEWER TEST | 08/28/2015 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 08/18/2015 | APPROVED | DROCKWELL |
| ELECTRIC-TUG | 08/14/2015 | APPROVED - AS NOTED | RMARTIN |
| Note: Inspection Resulted at 8/14/2015 1:35:59 PM SPOKE TO DELL FPL RELEASED POWER 1:21 | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/14/2015 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 07/30/2015 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/28/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/27/2015 | Disapproved - NO FEE | DROCKWELL |
| Note: Inspection Resulted at 7/27/2015 2:32:57 PM PROVIDE LOOP FOR SHUT-OFF IN GARAGE/REVISE RISER TO AS-BUILT |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 10/06/2015 | 10/08/2015 |
| SW1 | COMPLETE | 08/13/2015 | 08/14/2015 |
| Note: Released By: DREWIS FOUNDATION S | |||
| MECH | COMPLETE | 06/16/2015 | 06/16/2015 |
| MECH | HOLD | 06/15/2015 | 06/15/2015 |
| Note: Previous comment shall be addressed. Provide the manufacturer, model number of outdoor and indoor units along with sensible and total cooling capacities at the design conditions per 2010 FBCEC 403. 6.1. | |||
| UD1 | COMPLETE | 06/15/2015 | 06/16/2015 |
| Note: See notes | |||
| ZON | COMPLETE | 06/15/2015 | 06/15/2015 |
| BLD | COMPLETE | 05/18/2015 | 05/19/2015 |
| ELEC | COMPLETE | 05/18/2015 | 05/19/2015 |
| ENGIN1 | COMPLETE | 05/18/2015 | 05/19/2015 |
| Note: No swale plan required. | |||
| MECH | HOLD | 05/18/2015 | 05/18/2015 |
| Note: Provide the manufacturer, model number of outdoor and indoor units along with sensible and total cooling capacities at the design conditions per 2010 FBCEC 403. 6.1. | |||
| PLUM | COMPLETE | 05/18/2015 | 05/18/2015 |
| SW1 | COMPLETE | 05/18/2015 | 05/18/2015 |
| UD1 | HOLD | 05/18/2015 | 05/19/2015 |
| Note: See Notes | |||
| ZON | HOLD | 05/18/2015 | 05/20/2015 |
| Note: Per LDC 13.03.03.B.3 Banding is required around all doors and windows facing the right-of-way. | |||
| URB | COMPLETE | 05/18/2015 | 05/19/2015 |
| SW1 | COMPLETE | 11/17/2015 | |
| Note: Released By: DREWIS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 11/17/2015 |
| REINSPECTION FEE | ¤40.00 | 11/17/2015 |
| NEW RESIDENTIAL INSPECTIONS | ¤602.00 | 06/18/2015 |
| SITE PLAN 20 | ¤20.00 | 06/18/2015 |
| SURCHARGE FS 533.721 | ¤21.96 | 06/18/2015 |
| SURCHARGE - FS 468.631 | ¤21.96 | 06/18/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/18/2015 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.51) | 06/18/2015 |
| ADMIN FEE | ¤20.00 | 06/18/2015 |
| ELECTRIC FEE | ¤240.60 | 06/18/2015 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.33) | 06/18/2015 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤211.11 | 06/18/2015 |
| IMPACT FEE PARKS | ¤849.24 | 06/18/2015 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/18/2015 |
| IMPACT FEE TRANSPORTATION | ¤3,050.24 | 06/18/2015 |
| MECHANICAL FEE | ¤240.60 | 06/18/2015 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/18/2015 |
| PLAN CHECK FEE | ¤120.40 | 06/18/2015 |
| PLUMBING FEE | ¤240.60 | 06/18/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,275.39 |