Permit #2015060174

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00350-0170
CONDITIONED SPACE: 1820 sqft
GARAGE: 565 sqft
OPENED PORCH (WITH ROOF) : 419 sqft
OPENED PORCH (WITH ROOF) : 44 sqft
Total Square Footage: 2848 sqft
Block: 00350
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: (386)445-9393
Location Address: 21 FENHILL LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/29/2015
NOC: RECORDED
Applicant name: ANTONIO AMARAL JR
Owner: AMARAL CUSTOM HOMES INC

Address

13 UTILITY DRIVE

PALM COAST, FL 32137

Lot: 0170
Contracted Stated Job Value: ¤230,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AMARAL CUSTOM HOMES INC.
Status Location Address State License Number Phone Fax
CANCEL

13 Utility Drive

PALM COAST, FL 32135

CBC058062 (Exp: 08/31/2020) (386)445-9393 (386)446-0403

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ANTONIO JR AMARAL
Status Location Address State License Number Phone Fax
CANCEL

13 Utility Drive

PALM COAST, FL 32137

CCC058004 (Exp: 08/31/2018) (386)445-9393 (386)446-0403

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 11/02/2016 FINAL APPROVED JNICHOLS
BLD - BUILDING FINAL 11/01/2016 FINAL APPROVED CMINI
GRAVITY SEWER TEST 11/01/2016 APPROVED CMINI
Note: THIS IS A REINSPECTION
FINAL APRON (AFTER POUR/DRIVEWAY) 06/22/2016 APPROVED CTROHA
Note: OK
ROW FINAL 06/22/2016 FINAL APPROVED CTROHA
Note: OK
FINAL SURVEY (OFFICE USE ONLY) 06/01/2016 APPROVED DREWIS
ELECTRIC - EARLY POWER 04/26/2016 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 4/26/2016 2:42:52 PM CALLED FPL TO RELEASE POWER, SPOKE TO SUSAN
PRE-APRON (PRE-POUR/DRIVEWAY) 02/10/2016 APPROVED CTROHA
Note: READY TO POUR
U - SEWER TIE IN 02/09/2016 APPROVED MBACON
GRAVITY SEWER TEST 02/09/2016 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 2/9/2016 11:01:16 AM (PIPE IS DRY) DWV GRAVITY TEST, P2503.4 BUILDING SEWER TESTING. MUST BE TESTED AT THE POINT BY INSERTION OF A PLUG AT THE POINT OF CONNECTION OF PUBLIC SEWER
LATH/BRICK/ WATER BARRIER 12/10/2015 APPROVED CMINI
INSULATION 12/07/2015 APPROVED CMINI
ALL ROUGH 11/25/2015 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/16/2015 APPROVED CMINI
TIE BEAM / LINTEL 10/19/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 10/16/2015 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 10/16/2015 3:16:04 PM DRILL AND ADD MISSING ROD (CIRCLED ON PLANS), AND ADD EPOXY
FOUND SURVEY APPROVED (OFFICE) 10/15/2015 APPROVED DREWIS
MONOLITHIC SLAB 10/02/2015 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 09/30/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 09/29/2015 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 9/29/2015 10:37:24 AM JOINTS AND CONNECTIONS IN THE DWV SYSTEM SHALL BE GAS TIGHT AND WATER TIGHT FOR THE INTENDED USE OR PRESSURE REQUIRED BY TEST FBC 312
PLUMBING 1ST ROUGH UNDERGROUND 09/28/2015 CANCELLED BY APPLICANT CMINI
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 09/24/2015 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 9/24/2015 10:31:09 AM MISSING HEAD TEST ON DWV FBC P 312.2
PLUMBING 1ST ROUGH UNDERGROUND 08/28/2015 CANCELLED BY APPLICANT CMINI

Review History

Department Status Date In Date Out
SW1 COMPLETE 05/31/2016 06/01/2016
Note: Released By: DREWIS final s
SW1 COMPLETE 10/15/2015 10/15/2015
Note: Released By: DREWIS foundation s
ZON COMPLETE 06/25/2015 06/25/2015
URB COMPLETE 06/16/2015 06/16/2015
ZON HOLD 06/16/2015 06/16/2015
Note: REPEAT COMMENTS: 1. Provide site plan that also clearly depicts ALL PLATTED EASEMENTS. 2. Stucco banding must wrap the corners of the home for at least 2'.
BLD COMPLETE 06/04/2015 06/10/2015
ELEC COMPLETE 06/04/2015 06/09/2015
ENGIN1 COMPLETE 06/04/2015 06/11/2015
MECH COMPLETE 06/04/2015 06/10/2015
PLUM COMPLETE 06/04/2015 06/10/2015
SW1 COMPLETE 06/04/2015 06/09/2015
UD1 COMPLETE 06/04/2015 06/05/2015
Note: See Notes
ZON HOLD 06/04/2015 06/05/2015
Note: 1. Provide site plan that clearly depicts lot boundaries, all platted easements and dimensions and setbacks of all proposed improvements to property. 2. Landscape plan must provide the following: a. Location of index trees (note that one must be in the rear yard) b. Show sod type (and irrigation if St. Augustine sod is being used) c. Mechanical equipment must be screened. 3. Stucco banding must wrap the corners of the home for at least 2'.
URB HOLD 06/04/2015 06/04/2015
Note: Need to indicate location of 2 replacement trees on plan or caliper,type and location of 2 saved trees on plan. Need the type of sod / irrigation being installed.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 11/03/2016
REINSPECTION FEE ¤40.00 11/03/2016
REINSPECTION FEE ¤40.00 11/03/2016
REINSPECTION FEE ¤40.00 11/03/2016
NEW RESIDENTIAL INSPECTIONS ¤488.00 06/29/2015
SITE PLAN 20 ¤20.00 06/29/2015
SURCHARGE FS 533.721 ¤18.37 06/29/2015
SURCHARGE - FS 468.631 ¤18.37 06/29/2015
STORM WATER PERMIT FEES ¤80.00 06/29/2015
3% TRANS IMPACT FEE CREDIT (¤91.51) 06/29/2015
ADMIN FEE ¤20.00 06/29/2015
ELECTRIC FEE ¤206.40 06/29/2015
3% FIRE IMPACT FEE CREDIT (¤6.38) 06/29/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤212.80 06/29/2015
IMPACT FEE PARKS ¤849.24 06/29/2015
IMPACT FEE SCHOOL ¤3,600.00 06/29/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 06/29/2015
MECHANICAL FEE ¤206.40 06/29/2015
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/29/2015
PLAN CHECK FEE ¤97.60 06/29/2015
PLUMBING FEE ¤206.40 06/29/2015
Fees Total Due: ¤0.00 Total Paid: ¤9,110.45