I want to search for...

Permit #2015060726

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-00710-0110
CONDITIONED SPACE: 2727 sqft
GARAGE: 622 sqft
OPENED PORCH (WITH ROOF) : 376 sqft
OPENED PORCH (WITH ROOF) : 56 sqft
Total Square Footage: 3781 sqft
Block: 00710
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-931-1725
Location Address: 21 EGAN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/08/2015
NOC: RECORDED
Applicant name: JOSEPH ALEIXO PORTAL
Owner: TENREIRO, DECIO T & FERNANDA T

Address

63 FANSHAWE LANE

PALM COAST, FL 32164

Lot: 0110
Contracted Stated Job Value: ¤270,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SWEETWATER CUSTOM HOMES INC.
Status Location Address State License Number Phone Fax
INACTIVE

1105 LAMBERT AVENUE

FLAGLER BEACH, FL 32136

CBC1252965 (Exp: 08/31/2024) 386-931-1725 386-439-4676

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone Fax
CANCEL

2 HARGROVE GRADE

PALM COAST, FL 32136

CAC048127 (Exp: 08/31/2018) 386-445-5023 386-446-4614
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOANNA S REELEY
Status Location Address State License Number Phone
INACTIVE

2 MARKET PLACE D

PALM COAST, FL 32137

CCC1327485 (Exp: 08/31/2020) 386-445-7945

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 03/29/2016 FINAL APPROVED MBACON
BLD - BUILDING FINAL 03/28/2016 FINAL APPROVED LMILLER
PRE-APRON (PRE-POUR/DRIVEWAY) 03/28/2016 APPROVED CTROHA
Note: APPROVED
FINAL APRON (AFTER POUR/DRIVEWAY) 03/28/2016 APPROVED CTROHA
Note: APPROVED
ROW FINAL 03/28/2016 APPROVED CTROHA
Note: APPROVED
FINAL SURVEY (OFFICE USE ONLY) 03/24/2016 APPROVED DREWIS
ELECTRIC - EARLY POWER 01/21/2016 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 1/21/2016 1:34:22 PM SPOKE TO DELL FPL RELEASED EARLY POWER 1:23
PRE-APRON (PRE-POUR/DRIVEWAY) 01/11/2016 PARTIALLY APPROVED CTROHA
Note: concrete only around culvert ready to pour
GRAVITY SEWER TEST 12/23/2015 APPROVED DROCKWELL
U - SEWER TIE IN 12/22/2015 APPROVED MBACON
INSULATION 10/19/2015 APPROVED DROCKWELL
ALL ROUGH 10/07/2015 APPROVED - AS NOTED LMILLER
Note: Inspection Resulted at 10/7/2015 11:07:52 AM FASTEN TOP OF GREAT ROOM DOOR FRAME BY INSULATION INSPECTION!
LATH/BRICK/ WATER BARRIER 10/07/2015 APPROVED LMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/23/2015 APPROVED DROCKWELL
TIE BEAM / LINTEL 08/28/2015 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 08/21/2015 APPROVED DREWIS
ELECTRIC TEMP POLE 08/11/2015 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 8/11/2015 11:52:16 AM RELEASED TEMP POLE POWER 11:50 SPOKE TO SUSAN AT FPL
MONOLITHIC SLAB 08/10/2015 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 08/03/2015 APPROVED DROCKWELL

Review History

Department Status Date In Date Out
SW1 COMPLETE 03/24/2016 03/24/2016
Note: Released By: DREWIS final s
BLD COMPLETE 09/16/2015 09/21/2015
BLD HOLD 09/03/2015 09/03/2015
Note: 1. Provide a detail for how the opening is to be closed in. 5th ed. FBC 107.2.1. J. Hindman 9863784.
SW1 COMPLETE 08/21/2015 08/21/2015
Note: Released By: DREWIS foundation s
ZON COMPLETE 07/02/2015 07/07/2015
MECH COMPLETE 07/02/2015 07/07/2015
UD1 COMPLETE 06/30/2015 06/30/2015
Note: See Notes
URB COMPLETE 06/30/2015 06/30/2015
ZON HOLD 06/30/2015 06/30/2015
Note: 1. Site plan still depicts concrete driveway. Contractor verified that paver driveway will be installed. Correct site plan. 2. Right-of-Way Utilization Agreement must be signed by ALL parties on deed to property and all persons signatures must be properly notarized.
MECH HOLD 06/30/2015 07/01/2015
Note: 1. Provide a signed energy performance display card. 2010 FBC 107.2.1.
BLD COMPLETE 06/30/2015 07/01/2015
ELEC COMPLETE 06/30/2015 06/30/2015
BLD HOLD 06/23/2015 06/24/2015
Note: 1. Provide lintels over window openings at the front of the house per 2010 FBCR 606.10. 2. Clarify the roof covering underlayment as plan/detail does not match with those shown on Roofing Worksheet per 2010 FBC 107.2.1.
ELEC COMPLETE 06/23/2015 06/23/2015
ENGIN1 COMPLETE 06/23/2015 06/29/2015
MECH HOLD 06/23/2015 06/24/2015
Note: Provide energy calculations per 2010 FBCEC 405.
PLUM COMPLETE 06/23/2015 06/23/2015
SW1 COMPLETE 06/23/2015 06/23/2015
UD1 HOLD 06/23/2015 06/23/2015
Note: PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 06/23/2015 06/23/2015
Note: 1. Provide landscape plan. 2. Provide exterior color and material sheet. 3. Site plan depicts concrete driveway, however there is a Right-of-Way Utilization Agreement for paver driveway submitted. Please clarify and correct as needed. 4. Site plan must depict flood zone information to include panel # information.
URB HOLD 06/23/2015 06/23/2015
Note: Need to submit a landscape plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 03/29/2016
SITE PLAN 20 ¤20.00 07/08/2015
SURCHARGE FS 533.721 ¤24.80 07/08/2015
SURCHARGE - FS 468.631 ¤24.80 07/08/2015
STORM WATER PERMIT FEES ¤80.00 07/08/2015
ADMIN FEE ¤20.00 07/08/2015
ELECTRIC FEE ¤267.60 07/08/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤212.80 07/08/2015
IMPACT FEE PARKS ¤849.24 07/08/2015
IMPACT FEE SCHOOL ¤3,600.00 07/08/2015
RECORDING FEE REIMBURSE DOC ¤52.50 07/08/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 07/08/2015
MECHANICAL FEE ¤267.60 07/08/2015
PLAN CHECK FEE ¤138.40 07/08/2015
PLUMBING FEE ¤267.60 07/08/2015
NEW RESIDENTIAL INSPECTIONS ¤692.00 07/08/2015
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
Fees Total Due: ¤60.00 Total Paid: ¤9,607.58