Permit #2015060947
Permit Details
Status: FINAL
| Parcel Id: 33-11-31-3060-00000-00N0 |
| Subdivision: 2106 - HIDDEN LAKES, PHASE 1 |
| Job Phone: (386)322-8700 |
| Location Address: 20 GRAHAM WOODS PL |
| Type: SDD - SUBDIVISION SITE DEVELOPMENT |
| Issue Date: 07/29/2015 |
| NOC: Unknown |
| Applicant name: MARC ALLEN HAZEN |
| Owner: HLPC, LLC |
|
Address 2855 S ATLANTIC AVENUE #202 DAYTONA BEACH, FL 32118 |
| Contracted Stated Job Value: ¤1,200,000.00 |
| Job Description: HIDDEN LAKES PHASE 1 - SECTION 2A |
| Type: CN |
Contractor
HAZEN CONSTRUCTION LLC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2417 TOMOKA FARMS ROAD PORT ORANGE, FL 32128 |
CUC1223713 (Exp: 08/31/2026) | (386)322-8700 | (386)756-0000 |
Inspection History
| Type | Request Date | Result | Inspector |
| MAINT BOND ACCEPTANCE (OFFICE) | 04/06/2016 | APPROVED | DRAMIREZ |
| FINAL INSPECTION | 03/29/2016 | FINAL APPROVED | GLALIMA |
| LDSC- LANDSCAPE FINAL | 03/28/2016 | APPROVED | WBUTLER |
| U - UTILITY COMMERCIAL FINAL | 03/28/2016 | APPROVED | DSPENCER |
| TRAFFIC SIGNAGE/PAVEMENT MARKING FINAL | 03/24/2016 | APPROVED | SCASTELLO |
| BOND DRAFT | 03/24/2016 | CANCELLED BY APPLICANT | GLALIMA |
| PROJECT STATUS (OFFICE USE) | 03/24/2016 | Disapproved - NO FEE | GLALIMA |
| Note: POOL COMPANY AS MADE RUTS 2 ' FOOT DEEP ON LOT 49 AND HAS CONCRETE WASTE OL OVER LOT FAILED | |||
| BLD - ADA COMPLIANT | 03/24/2016 | APPROVED | GLALIMA |
| FLAT WORK-BIKE PATH,TRAIL | 03/23/2016 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| FORM BOARD | 03/23/2016 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| FINAL DRAINAGE | 03/23/2016 | APPROVED | GLALIMA |
| UC-SUBSTANTIAL WALK-THRU | 03/23/2016 | APPROVED | DSPENCER |
| LDSC-PRE-PLANTING TREE QUALITY | 03/08/2016 | APPROVED | WBUTLER |
| Note: THIS IS A REINSPECTION | |||
| FLAT WORK-BIKE PATH,TRAIL | 03/08/2016 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION NOT FORMED AND READY FOR INSPECTION | |||
| FORM BOARD | 03/08/2016 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION NOT YET FULLY FORMED AND READY FOR INSPECTION. | |||
| PROJECT STATUS (OFFICE USE) | 03/08/2016 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION ALL REPAIRS MADE FROM PUNCH LIST . DRAINAGE PIPE CULVERT ENDS HAVE BEEN REPAIRED . BROKEN STREET GUTTERS AT CORNER LOT WILL BE REPLACED WHEN HOUSE IS BUILT ON LOT . | |||
| FINAL SURVEY (COMM - OFFICE USE ONLY) | 03/08/2016 | APPROVED | SCASTELLO |
| Note: THIS IS A REINSPECTION | |||
| UC-SUBSTANTIAL WALK-THRU | 03/01/2016 | APPROVED | DSPENCER |
| Note: Inspection Resulted at 3/1/2016 8:33:18 AM PUNCH LIST CREATED | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 02/22/2016 | CANCELLED BY INSPECTOR | WBUTLER |
| Note: 2/23/16 WMB I was out of the office yesterday at a seminar but Bill Hoover confirmed with me this morning that the applicant did not submit any as-builts as part of this inspection, therefore, I am cancelling it. | |||
| UC-SUBSTANTIAL WALK-THRU | 02/22/2016 | APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 2/23/2016 6:58:27 AM PUNCH LIST CREATED | |||
| LDSC-PRE-PLANTING TREE QUALITY | 02/22/2016 | CANCELLED BY APPLICANT | CJMINI |
| Note: CJM 2/22/2016 Contractor called in wrong inspection. | |||
| FINAL DRAINAGE | 02/22/2016 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION STREET GUTTERS WILL NEED TO BE REPLACED AT CORNER OF LOT # 59 WHEN NEW HOME IS BUILT | |||
| FINAL SURVEY (COMM - OFFICE USE ONLY) | 02/22/2016 | PARTIALLY APPROVED | DSPENCER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/3/2016 7:25:05 AM UTILITY PORTION IS GOOD | |||
| PROJECT STATUS (OFFICE USE) | 02/22/2016 | Disapproved - NO FEE | GLALIMA |
| Note: THIS IS A REINSPECTION WORKING ON PUNCH LIST | |||
| FORM BOARD | 02/22/2016 | Disapproved - NO FEE | GLALIMA |
| Note: NEED TO CALL GARY LA LIMA 585-0287 '''' NO FORM BOARDS IN PLACE ? ? ? ? | |||
| FLAT WORK-BIKE PATH,TRAIL | 02/22/2016 | Disapproved - NO FEE | GLALIMA |
| Note: THIS IS A REINSPECTION BIKE PATH FORMS ? ? ALL READY POURED | |||
| FLAT WORK-BIKE PATH,TRAIL | 02/19/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION | |||
| FORM BOARD | 02/19/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| BLD - ADA COMPLIANT | 02/19/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| PROJECT STATUS (OFFICE USE) | 02/19/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION | |||
| FOUNDATION SURVEY - OFFICE USE ONLY | 02/19/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| FINAL SURVEY (COMM - OFFICE USE ONLY) | 02/19/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION | |||
| FINAL DRAINAGE | 02/19/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 02/19/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) | 02/12/2016 | APPROVED - AS NOTED | WBUTLER |
| Note: 2-12-16 Landscape and Irrigation Preliminary As-Built Comments 1. Add one half head to zone 1 along curb for head to head coverage. 2. Show one 90 degree spray head to be added to the west end of zone 8. 3. Need to install the specified controller and Solar Sync option to make the controller a "smart" controller. This can be done when FPL brings the power to the controller. In the cul-de-sac island planting, the Hunter Pro-C controller that is battery operated can remain due to the fact that power will never be brought to this area. Just change the specifications on the plans to match what was installed. 4. The contractor had indicated that the bare soil area at the top of the slope of the common area will be sodded with St. Augustine sod and irrigated. Need to show this on the landscape and irrigation as-builts. 5. On zone 7 need to change the nozzle description for all heads spaced more than 15' apart to 18' radius nozzles for head to head coverage. 6. The perimeter heads around the cul-de-sac island are shown as two less than what was actually installed. Correct as-built. 7. Three more spray heads were added behind the bench bump out and need to be shown. Others were shown on the as-built mark-ups so be sure and pick them all up when doing the final as-builts. 8. Spartina grass was added behind the lots that are west of the street side common area landscaping. Need to show a clouded line to encompass the area that was planted and note in the plant list the plant name, size and spacing and label the area on the plans with a symbol noting the key and quantity. 9. Show irrigation valve boxes in their approximate locations and dimension clearly from two fixed points. 10. Need one hard copy original of the as-built landscape and irrigation plans, signed and sealed by the project landscape architect. Once these plans are submitted to the City Building Department and approved, the final landscape inspection can be called in. Landscape and Irrigation Punch List of Remaining Items 1. Need to sod and irrigate the bare soil area at the top of the hill along the common landscape area. Make sure head to head coverage is done on the irrigation. 2. Add head along curb to zone 1 for head to head coverage. 3. Change nozzles to 18' radius anywhere on zone 7 where head to head coverage is not attained. 4. Add a 90 degree head to the west end of zone 8 for head to head coverage. 5. Change out the Pro-C controller to the one specified on the plans and add a solar sync option to make it a "smart" controller. This needs to be done when FPL supplies power to the controller. Contractor to call Bill Butler to inform him when this has been done. 6. Need to install the bench and trash receptacle per the approved plans. 7. Need to install the required 12" x 12" re-use irrigation sign on a low post at each end of the common area and at the north side of the cul-de-sac island per the approved detail on the plans. | |||
| LDSC-TREE BARRICADE | 01/26/2016 | APPROVED | WBUTLER |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 01/26/2016 | APPROVED | DSPENCER |
| Note: Inspection Resulted at 1/26/2016 1:42:15 PM ALL TESTING CHLORINATION COMPLETED AND ACCEPTED BY FDEP | |||
| U-GRAVITY SEWER INSTALL/TESTING | 01/26/2016 | APPROVED | DSPENCER |
| Note: Inspection Resulted at 1/26/2016 1:42:17 PM COMPLETE TESTING PASSED AND ACCEPTED BY FDEP | |||
| U-REUSE MAIN INSTALL/TESTING | 01/26/2016 | APPROVED | DSPENCER |
| Note: Inspection Resulted at 1/26/2016 1:42:15 PM ALL TESTING AND VIDEO COMPLETED AND ACCEPTED BY FDEP | |||
| U-WATER MAIN DISINFECTION | 01/26/2016 | APPROVED | DSPENCER |
| U-WATER MAIN DISINFECTION SAMPLING | 01/26/2016 | APPROVED | DSPENCER |
| UC-SUBSTANTIAL WALK-THRU | 01/26/2016 | PARTIALLY APPROVED | DSPENCER |
| Note: Inspection Resulted at 1/26/2016 1:42:17 PM REVIEW AND SUBSTANTIAL INSPECTION NOT COMPLETED | |||
| TURBIDITY BARRIER | 01/26/2016 | APPROVED | DSPENCER |
| CONSTRUCTION ENTRANCE | 01/26/2016 | APPROVED | DSPENCER |
| MOT - MAINT OF TRAFFIC | 01/26/2016 | APPROVED | DSPENCER |
| COMPACTION | 01/26/2016 | APPROVED | DSPENCER |
| ROAD BASE/DENSITY | 01/26/2016 | APPROVED | DSPENCER |
| FINAL SURVEY (COMM - OFFICE USE ONLY) | 01/26/2016 | PARTIALLY APPROVED | DSCHRAGER |
| Note: - Need final as-builts | |||
| PROJECT STATUS (OFFICE USE) | 01/26/2016 | PARTIALLY APPROVED | DSCHRAGER |
| Note: - Project nearing completion | |||
| ASPHALT PRE-PLACEMENT | 01/26/2016 | APPROVED | DSPENCER |
| DRAINAGE STRUCTURE PLACEMENT | 01/26/2016 | APPROVED | DSPENCER |
| Note: Inspection Resulted at 1/26/2016 1:42:12 PM COMPLETED INSPECTIONS BY JIM NICHOLS | |||
| DRAINAGE PIPE PLACEMENT | 01/26/2016 | APPROVED | DSPENCER |
| Note: Inspection Resulted at 1/26/2016 1:42:12 PM INSPECTIONS BY JIM NICHOLS LOOKS GOOD | |||
| RETENTION /DETENTION STABILIZATION | 01/26/2016 | APPROVED | DSPENCER |
| FLAT WORK-BIKE PATH,TRAIL | 01/26/2016 | PARTIALLY APPROVED | GLALIMA |
| Note: - Common area sidewalk under construction | |||
| FINAL GRADE PRIOR TO SOD | 01/26/2016 | APPROVED | DSPENCER |
| CURBING AND GUTTER | 01/26/2016 | APPROVED | DSPENCER |
| FINAL DRAINAGE | 01/26/2016 | PARTIALLY APPROVED | GLALIMA |
| Note: Not all sod complete. Need final approved drainage plan | |||
| EROSION CONTROL / INLET PROTECTION/SILT FENCE | 08/11/2015 | APPROVED | JNICHOLS |
| PRE-CONSTRUCTION -CALL 986-3736 | 07/30/2015 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 7/30/2015 10:04:49 AM DON CHARLIE CONSTANCE SHAWN DARYL ATTENDED |
Review History
| Department | Status | Date In | Date Out |
| DSD | COMPLETE | 07/28/2015 | 07/28/2015 |
| SW1 | COMPLETE | 07/28/2015 | 07/28/2015 |
| BLD | COMPLETE | 07/28/2015 | 07/28/2015 |
| FI1 | COMPLETE | 07/28/2015 | 07/28/2015 |
| UD1 | COMPLETE | 07/28/2015 | 07/28/2015 |
| SW1 | HOLD | 06/29/2015 | 06/29/2015 |
| Note: No DO issued yet. | |||
| UD1 | HOLD | 06/29/2015 | 07/02/2015 |
| Note: FDEP permits shall be complete prior to issuance of site development permit | |||
| BLD | HOLD | 06/29/2015 | 07/02/2015 |
| Note: 1. Need approved do plans | |||
| DSD | HOLD | 06/29/2015 | 06/29/2015 |
| Note: Development Order construction plans must be approved prior to issuance of this permit. | |||
| ENGIN1 | COMPLETE | 06/29/2015 | 06/29/2015 |
| Note: No DO issued yet. | |||
| FI1 | HOLD | 06/29/2015 | 07/02/2015 |
| Note: 1. Need approved do plans | |||
| PLLA | COMPLETE | 06/29/2015 | 06/29/2015 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/29/2016 |
| SITE PLAN 20 | ¤20.00 | 07/29/2015 |
| INSPECTION 40 | ¤1,000.00 | 07/29/2015 |
| PERMIT FEE | ¤125.00 | 07/29/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,185.00 |