Permit #2015060958

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00270-0160
CONDITIONED SPACE: 3039 sqft
GARAGE: 776 sqft
OPENED PORCH (WITH ROOF) : 466 sqft
OPENED PORCH (WITH ROOF) : 124 sqft
Total Square Footage: 4405 sqft
Block: 00270
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: (386)446-5161
Location Address: 26 FREEMAN LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/17/2015
NOC: RECORDED
Applicant name: HUGO A CAMACHO
Owner: FRANCIS RUDOLPH & NORMA C H&W

Address

42 HABITAT LANE

BLOOMFIELD, CT 06002

Lot: 0160
Contracted Stated Job Value: ¤350,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

IDEAL HOMES AT PALM COAST, INC.
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 353639

PALM COAST, FL 32137

CBC1250774 (Exp: 08/31/2026) (386)446-5161 (386)447-0238

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOANNA S REELEY
Status Location Address State License Number Phone
INACTIVE

2 MARKET PLACE D

PALM COAST, FL 32137

CCC1327485 (Exp: 08/31/2020) 386-445-7945

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 06/29/2016 FINAL APPROVED JNICHOLS
Note: utility final is approved but i can not close.
BLD - BUILDING FINAL 06/28/2016 FINAL APPROVED CMINI
PRE-APRON (PRE-POUR/DRIVEWAY) 06/22/2016 APPROVED CTROHA
FINAL APRON (AFTER POUR/DRIVEWAY) 06/22/2016 APPROVED CTROHA
Note: OK
ROW FINAL 06/22/2016 APPROVED - AS NOTED CTROHA
Note: SPOKE TO HUGO ABOUT ADDING SOME SEED AND STRAW TO WHAT WAS AREADY THERE
ELEV CERT-FOUNDATION APPROVAL 06/22/2016 CANCELLED BY APPLICANT AIRS WEB
FINAL SURVEY (OFFICE USE ONLY) 06/09/2016 APPROVED DREWIS
ELECTRIC - EARLY POWER 04/19/2016 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 4/19/2016 3:29:43 PM SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:15
PRE-APRON (PRE-POUR/DRIVEWAY) 03/22/2016 PARTIALLY APPROVED RGROSS
Note: THIS IS A REINSPECTION PARTIALLY APPROVED. READY TO POUR CONCRETE OVER PIPE ONLY. PAVER DRIVEWAY.
PRE-APRON (PRE-POUR/DRIVEWAY) 03/18/2016 CANCELLED BY APPLICANT CTROHA
Note: NOT READY TO POUR DUE TO WEATHER
GRAVITY SEWER TEST 02/19/2016 APPROVED LMILLER
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 02/18/2016 Disapproved - NO FEE LMILLER
Note: THIS IS A REINSPECTION Inspection Resulted at 2/18/2016 11:27:36 AM UNCOVER WORK TO BE INSPECTED..FBC...P2503.2 (NEED TO UNCOVER BELL HUB ON PIPE AS WELL)
GRAVITY SEWER TEST 02/10/2016 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 2/10/2016 11:27:24 AM UNCOVER WORK TO BE INSPECTED..FBC...P2503.2
U - SEWER TIE IN 02/10/2016 APPROVED MBACON
INSULATION 01/14/2016 APPROVED LMILLER
ALL ROUGH 01/11/2016 APPROVED CMINI
LATH/BRICK/ WATER BARRIER 12/31/2015 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/09/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/01/2015 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 12/1/2015 12:10:03 PM COMPLETE CONTINUOUS LOAD PATH PER DETAILS
ELECTRIC-TUG 10/19/2015 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 10/19/2015 2:18:54 PM SPOKE TO SUSAN FPL RELEASED TUG 2:17
TIE BEAM / LINTEL 10/16/2015 APPROVED LMILLER
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 10/15/2015 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 10/15/2015 11:15:54 AM DWV VENT PIPES; JOINTS AND CONNECTIONS IN THE DWV SYSTEM SHALL BE GAS TIGHT AND WATER TIGHT FOR THE INTENDED USE OR PRESSURE REQUIRED BY TEST FBC 312, TIE STEEL IN LENTALS WHERE CIRCLED ON PLANS
FOUND SURVEY APPROVED (OFFICE) 10/14/2015 APPROVED DREWIS
MONOLITHIC SLAB 09/30/2015 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 09/28/2015 APPROVED CMINI

Review History

Department Status Date In Date Out
SW1 COMPLETE 06/07/2016 06/09/2016
Note: Released By: DREWIS final s
BLD COMPLETE 01/07/2016 01/08/2016
ELEC COMPLETE 01/07/2016 01/08/2016
SW1 COMPLETE 10/14/2015 10/14/2015
Note: Released By: DREWIS foundation survey
ZON COMPLETE 08/14/2015 08/14/2015
SW1 COMPLETE 07/14/2015 07/14/2015
ZON HOLD 07/14/2015 07/15/2015
Note: REPEAT ORIGINAL COMMENT: Pending receipt of complete, recorded Binding Lot Agreement.
URB COMPLETE 07/14/2015 07/14/2015
BLD COMPLETE 07/14/2015 07/14/2015
BLD HOLD 06/29/2015 06/30/2015
Note: 1. Identify the lintel sizes at the master bedroom and family room windows. 2010 FBC 107.2.1.
ELEC COMPLETE 06/29/2015 06/29/2015
ENGIN1 COMPLETE 06/29/2015 07/13/2015
MECH COMPLETE 06/29/2015 06/30/2015
PLUM COMPLETE 06/29/2015 06/30/2015
SW1 HOLD 06/29/2015 06/29/2015
Note: Please provide proposed survey measurements for lot 16 side of home showing positive storm water flow as existing measurements would be higher than proposed foundation.
UD1 COMPLETE 06/29/2015 06/30/2015
Note: See Notes
ZON HOLD 06/29/2015 06/30/2015
Note: Pending receipt of complete, recorded Binding Lot Agreement.
URB HOLD 06/29/2015 06/30/2015
Note: Need to trade 2 of the understory trees for shade type trees.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/05/2016
REINSPECTION FEE ¤40.00 07/05/2016
REINSPECTION FEE ¤40.00 07/05/2016
REVISION ¤40.00 07/05/2016
SITE PLAN 20 ¤20.00 08/17/2015
SURCHARGE FS 533.721 ¤27.76 08/17/2015
SURCHARGE - FS 468.631 ¤27.76 08/17/2015
STORM WATER PERMIT FEES ¤80.00 08/17/2015
3% TRANS IMPACT FEE CREDIT (¤91.51) 08/17/2015
NEW RESIDENTIAL INSPECTIONS ¤786.00 08/17/2015
ADMIN FEE ¤20.00 08/17/2015
ELECTRIC FEE ¤295.80 08/17/2015
3% FIRE IMPACT FEE CREDIT (¤6.38) 08/17/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤212.80 08/17/2015
IMPACT FEE PARKS ¤849.24 08/17/2015
IMPACT FEE SCHOOL ¤3,600.00 08/17/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 08/17/2015
MECHANICAL FEE ¤295.80 08/17/2015
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/17/2015
PLAN CHECK FEE ¤157.20 08/17/2015
PLUMBING FEE ¤295.80 08/17/2015
Fees Total Due: ¤0.00 Total Paid: ¤9,755.03