Permit #2015061022
Permit Details
Status: COED
| Parcel Id: 48-11-31-0000-01010-0110 |
| COMMERCIAL SQUARE FOOTAGE: 4720 sqft |
| Total Square Footage: 4720 sqft |
| Block: 01010 |
| Subdivision: - |
| Job Phone: (386)677-8736 |
| Location Address: 2298 COLBERT LN |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 09/11/2015 |
| NOC: RECORDED |
| Applicant name: LEONARD MARINACCO |
| Owner: GRAND HAVEN COMMERCIAL LLC |
|
Address 7 SANDPIPER COURT PALM COAST, FL 32164 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤750,000.00 |
| Job Description: GRAND HAVEN SALE CENTER OFFICE BUILDING |
| Type: CN |
Contractor
BOMAR CONSTRUCTION INC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
27 S ORCHARD STREET ORMOND BEACH, FL 32174 |
CGC015648 (Exp: 08/31/2022) | (386)677-8736 | (386)677-7726 |
Sub Contractors
KIPP S GARDNER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO Box 1350 Bunnell, FL 32110 |
EC0001298 (Exp: 08/31/2018) | (386) 437-3369 | (386)437-5228 |
DONALD G MEYER
| Status | Location Address | State License Number | Phone |
| CANCEL |
P. O. Drawer 730008 Ormond Beach, FL 32174 |
CAC039739 (Exp: 08/31/2016) | (386) 253-7774 |
GARY S WELBORN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1709 North Nova Road Holly Hill, 32117 |
CFC1426839 (Exp: 08/31/2026) | (386) 257-1172 | 386-252-5979 |
STUART A LYONS
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
2393 Bellevue Ave. Ext. DAYTONA BEACH, FL 32114 |
CCC032500 (Exp: 08/31/2024) | (386) 257-1007 | (386)257-9040 |
Inspection History
| Type | Request Date | Result | Inspector |
| U - UTILITY COMMERCIAL FINAL | 03/31/2016 | FINAL APPROVED | MBACON |
| Note: THIS IS A REINSPECTION | |||
| U - UTILITY COMMERCIAL FINAL | 03/28/2016 | Disapproved - NO FEE | MBACON |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/28/2016 11:24:25 AM SITE WORK IS INCOMPLETE | |||
| ELECTRIC FINAL | 03/28/2016 | FINAL APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| BUILDING FINAL | 03/28/2016 | APPROVED | JHINDMAN |
| FIREWALL | 03/28/2016 | APPROVED | JHINDMAN |
| Note: n/a | |||
| FIRE FINAL | 03/28/2016 | APPROVED | JHINDMAN |
| U - UTILITY COMMERCIAL FINAL | 03/24/2016 | CANCELLED BY APPLICANT | MBACON |
| ELECTRIC FINAL | 03/24/2016 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION Exit lights do not work under battery power. 2011 NEC 700.12. 2. Weather proof GFCI cover at rear patio is broken. 2011 NEC 406.9. J. hindman 986-3784 | |||
| GRAVITY SEWER | 03/24/2016 | APPROVED | JHINDMAN |
| STOREFRONT | 03/24/2016 | APPROVED | JHINDMAN |
| PLUMBING FINAL | 03/17/2016 | APPROVED | CMINI |
| HVAC FINAL | 03/17/2016 | APPROVED | CMINI |
| ELECTRIC FINAL | 03/17/2016 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: Inspection Resulted at 3/17/2016 1:03:54 PM NOT READY | |||
| ELECTRIC - EARLY POWER | 02/26/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: Inspection Resulted at 2/26/2016 1:07:06 PM SPOKE TO SUSAN FPL RELEASED EARLY POWER 1:10 | |||
| ABOVE CEILING | 02/24/2016 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| HVAC ROUGH | 01/26/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC 2ND ROUGH | 01/26/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 01/26/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ABOVE CEILING | 01/26/2016 | CANCELLED BY APPLICANT | CMINI |
| Note: per contractor | |||
| INSULATION | 01/25/2016 | APPROVED | CMINI |
| FRAMING | 01/20/2016 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 1/20/2016 3:04:40 PM OK TO INSULATE AND ONE SIDE STILL NEED TO LOOK AT INTERIOR WALLS FRAMING ON REVISION | |||
| ELECTRIC 2ND ROUGH | 01/20/2016 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 1/20/2016 3:04:39 PM NEED REVISION ON INTERIOR WALLS ADDED WITH ELECTRIC, NEED TO CHECK GANGABLE SWITCH BOXES TO MAKE SURE OF PROPER GROUNDING NEED SERVICE CONDUCTORS AND BRANCH CIRCUITS LANDED IN PANELS | |||
| ELECTRIC TEMP POLE | 01/05/2016 | APPROVED | JHINDMAN |
| HVAC ROUGH | 01/05/2016 | CANCELLED BY APPLICANT | JHINDMAN |
| PLUMBING 2ND ROUGH | 01/05/2016 | APPROVED | JHINDMAN |
| ROOF SHEATHING / BRACE / TIE DOWN | 12/18/2015 | APPROVED | CMINI |
| ROOF SHEATHING / BRACE / TIE DOWN | 12/14/2015 | PARTIALLY APPROVED | CMINI |
| Note: roof top nailing and strapping | |||
| LINTEL | 12/04/2015 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| LINTEL | 12/01/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/1/2015 2:20:59 PM 1 MORE LIFT AT ENTRANCE WAY TO BE COMPLETE | |||
| LINTEL | 11/25/2015 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 11/25/2015 10:07:09 AM TOP OUT ON MAIN PERIMETER WALLS, EYEBROWS AND FRONT ENTRANCE TO CONTINUE | |||
| LINTEL | 11/19/2015 | PARTIALLY APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 11/19/2015 2:24:31 PM 2ND LIFT ONLY | |||
| LINTEL | 11/16/2015 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 11/16/2015 12:55:16 PM 1ST LIFT ONLY | |||
| FLOOD ZONE A CERTIFICATE APPROVED | 11/13/2015 | APPROVED | DBEVAN |
| Note: Note: At completion of construction, an elevation certificate (EC) will be required to verify conditions at the "finished construction stage". Staff has contacted the surveyor, Peter Johnson, to discuss the requirements of EC data and associated form sections. | |||
| FOUNDATION SURVEY - OFFICE USE ONLY | 11/12/2015 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 10/30/2015 | APPROVED | CMINI |
| ELECTRIC 1ST ROUGH | 10/28/2015 | APPROVED | RMARTIN |
| PLUMBING 1ST ROUGH | 10/27/2015 | APPROVED | CMINI |
| STEMWALL FOOTING | 10/22/2015 | APPROVED | CMINI |
| FOOTER | 10/16/2015 | APPROVED | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 03/22/2016 | 03/22/2016 |
| ELEC | COMPLETE | 01/22/2016 | 01/25/2016 |
| MECH | COMPLETE | 01/15/2016 | 01/19/2016 |
| Note: Revision - changed duct layout. | |||
| BLD | COMPLETE | 01/15/2016 | 01/15/2016 |
| ELEC | HOLD | 01/15/2016 | 01/15/2016 |
| Note: Please provide the electrical layout for the revision per NEC 2011. -DC. Rewis 986-4736 | |||
| MECH | HOLD | 01/13/2016 | 01/14/2016 |
| Note: Revision Provide full sized plan of revised hvac duct layout signed and sealed by engineer of record for clarity per FBC 5th ed. 107.2.1. F.N.Reodica- 386-986-4734. | |||
| SW1 | COMPLETE | 11/12/2015 | 11/12/2015 |
| Note: Released By: DREWIS foundation s | |||
| PLFM | COMPLETE | 11/10/2015 | 11/13/2015 |
| Note: Note: At completion of construction, an elevation certificate (EC) will be required to verify conditions at the "finished construction stage". Staff has contacted the surveyor, Peter Johnson, to discuss the requirements of EC data and associated form sections. | |||
| PLUM | COMPLETE | 10/14/2015 | 10/14/2015 |
| Note: Revision 4 dated 8-19-15. Sheet P-3.1. Specs. changed. | |||
| BLD | COMPLETE | 10/14/2015 | 10/14/2015 |
| Note: Revision 4 dated 9-18-15. See support document for details. | |||
| MECH | COMPLETE | 10/14/2015 | 10/14/2015 |
| Note: Revision 4 dated 9-18-15. Revised energy calc. duct layout and duct specs. | |||
| DSD | COMPLETE | 09/03/2015 | 09/03/2015 |
| DSD | HOLD | 09/02/2015 | 09/02/2015 |
| Note: Please provide an updated elevation certificate so we can verify that the property is now in an X zone and not in a AE zone. | |||
| DSD | COMPLETE | 09/01/2015 | 09/02/2015 |
| FI1 | COMPLETE | 09/01/2015 | 09/02/2015 |
| BLD | COMPLETE | 09/01/2015 | 09/02/2015 |
| PLLA | COMPLETE | 09/01/2015 | 09/01/2015 |
| PLLA | HOLD | 08/19/2015 | 08/21/2015 |
| Note: 8-21-15 WMB 1) Need a modified landscape plan that shows the modified location of the transformer and provides screening with 30" tall shrubs, 7-gallon container size, 4' on center per FPL clearances. 2) Show also on the landscape plan the modified light pole locations. | |||
| FI1 | HOLD | 08/19/2015 | 08/21/2015 |
| Note: 1. Provide manufacturers specifications for the microwave/oven combination that identifies the required ventilation. If this is a commercial oven then a type 2 exhaust hood will be required under a separate permit. | |||
| BLD | HOLD | 08/19/2015 | 08/21/2015 |
| Note: 1. Identify the exact U.L.Design that is to be used for the underside of the roof trusses. 2010 FBC 107.2.1.J. Hindman 986-3784. | |||
| DSD | HOLD | 08/19/2015 | 08/20/2015 |
| Note: Repeat Comment: 1. The architectural plans submitted with the building permit does not match what was approved with the Development Order. If it is desired to retain the architectural sheets submitted with the building permit, the development order must be modified to reflect those changes. Development Order is in the process of being modified. | |||
| BLD | HOLD | 07/01/2015 | 07/08/2015 |
| Note: 1. Provide a complete interior plan with interior dimensions for the corridor outside of the restrooms and an interior door schedule with dimensions. 2010 FBC 107.2.1. 2. Provide complete connection and anchor details for the pergola 2010 FBC 107.2.1. 3. Identify the exact U.L.Design that is to be used for the underside of the roof trusses. 4. Provide and identify all roof truss anchor connections or the truss uplifts from the engineer of record on the layout per 2010 FBC 2303.4.4. 5. Provide the roof truss engineering 2010 FBC 107.2.1. 6. Provide Florida product approval for all doors, windows and storefront units. 2010 FBC 107.2.1. | |||
| ELEC | COMPLETE | 07/01/2015 | 07/06/2015 |
| FI1 | HOLD | 07/01/2015 | 07/06/2015 |
| Note: 1. Provide fire extinguishers per NFPA10. | |||
| MECH | COMPLETE | 07/01/2015 | 07/07/2015 |
| PLUM | COMPLETE | 07/01/2015 | 07/07/2015 |
| UD1 | COMPLETE | 07/01/2015 | 07/01/2015 |
| DSD | HOLD | 07/01/2015 | 07/15/2015 |
| Note: 1. The architectural plans submitted with the building permit does not match what was approved with the Development Order. If it is desired to retain the architectural sheets submitted with the building permit, the development order must be modified to reflect those changes. | |||
| ENGIN1 | COMPLETE | 07/01/2015 | 07/01/2015 |
| PLLA | HOLD | 07/01/2015 | 07/02/2015 |
| Note: 1) Tree conflicts exist. See marked-up sheet E100 for comments. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/24/2016 |
| REVISION | ¤40.00 | 03/23/2016 |
| REVISION | ¤40.00 | 03/18/2016 |
| REVISION | ¤40.00 | 03/18/2016 |
| REINSPECTION FEE | ¤40.00 | 03/18/2016 |
| REVISION | ¤40.00 | 10/15/2015 |
| REVISION | ¤40.00 | 10/15/2015 |
| REVISION | ¤40.00 | 10/15/2015 |
| SITE PLAN 20 | ¤20.00 | 09/11/2015 |
| SURCHARGE FS 533.721 | ¤100.46 | 09/11/2015 |
| SURCHARGE - FS 468.631 | ¤100.46 | 09/11/2015 |
| 3% TRANS IMPACT FEE CREDIT | (¤402.88) | 09/11/2015 |
| ADMIN COMMERCIAL | ¤60.00 | 09/11/2015 |
| ELECTRIC FEE | ¤510.00 | 09/11/2015 |
| ENGINEERING PERMIT FEES | ¤120.00 | 09/11/2015 |
| 3% FIRE IMPACT FEE CREDIT | (¤38.20) | 09/11/2015 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤1,273.46 | 09/11/2015 |
| FIRE PLANS REVIEW | ¤47.20 | 09/11/2015 |
| IMPACT FEE TRANSPORTATION | ¤13,429.49 | 09/11/2015 |
| MECHANICAL FEE | ¤510.00 | 09/11/2015 |
| PERMIT FEE | ¤4,125.00 | 09/11/2015 |
| PLAN CHECK FEE | ¤862.50 | 09/11/2015 |
| PLUMBING FEE | ¤510.00 | 09/11/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,547.49 |