Permit #2015061069

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1610
CONDITIONED SPACE: 2002 sqft
GARAGE: 428 sqft
OPENED PORCH (WITH ROOF) : 282 sqft
OPENED PORCH (WITH ROOF) : 28 sqft
SCREEN PORCH (SOLID ROOF) : 435 sqft
Total Square Footage: 3175 sqft
Block: 00000
Subdivision: 2094 - Conservatory at Hammock Beach
Job Phone: (386)383-0376
Location Address: 341 HIBISCUS WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/26/2015
NOC: RECORDED
Applicant name: ANTHONY CRAIG GUCCIONE
Owner: GEORGE VIRGINA VAN FLEET

Address

PO BOX 6721

MEREDITH, OH 03253

Lot: 1610
Contracted Stated Job Value: ¤315,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLD COAST HOME BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 354707

PALM COAST, FL 32137

CGC1507791 (Exp: 08/31/2026) 386-313-6221

Sub Contractors

BENJAMIN EDWARD SMITH
Status Location Address State License Number Phone
CANCEL

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13004288 (Exp: 08/31/2016) 386-265-2687
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
JOHN BRADLEY WINFREY JR
Status Location Address State License Number Phone Fax
ACTIVE

1685 S. CLARA AVE

Deland, FL 32720

CFC054901 (Exp: 08/31/2026) 386-734-0154 386-734-2751
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 02/03/2016 FINAL APPROVED MBACON
BLD - BUILDING FINAL 02/02/2016 FINAL APPROVED CMINI
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 02/01/2016 CANCELLED BY APPLICANT CMINI
FINAL APRON (AFTER POUR/DRIVEWAY) 01/29/2016 APPROVED RGROSS
ROW FINAL 01/29/2016 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 01/27/2016 APPROVED DREWIS
FOOTER 01/20/2016 APPROVED JCOLASANTI
ELECTRIC - EARLY POWER 01/12/2016 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 1/12/2016 2:03:30 PM SPOKE TO DELL FPL RELEASED EARLY POWER 2:00
PRE-APRON (PRE-POUR/DRIVEWAY) 01/12/2016 APPROVED GLALIMA
Note: THIS IS A REINSPECTION
PRE-APRON (PRE-POUR/DRIVEWAY) 01/11/2016 CANCELLED BY APPLICANT RGROSS
Note: Cancelled by Applicant
LATH/BRICK/ WATER BARRIER 12/03/2015 APPROVED JCOLASANTI
INSULATION 11/19/2015 APPROVED JCOLASANTI
ALL ROUGH 11/17/2015 APPROVED - AS NOTED JCOLASANTI
Note: Inspection Resulted at 11/17/2015 12:51:00 PM TEST ON DWV AND WATER PIPPING FPC .312 FBC 2503.5.1.....NAIL PLATES NEEDED MARKED ON WALL... WILL CHECK ON INSULATION. SUPERENTENTENT ON SITE.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/19/2015 APPROVED LMILLER
Note: THIS IS A REINSPECTION
ELECTRIC-TUG 10/16/2015 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 10/16/2015 3:00:57 PM SPOKE TO SUSAN FPL RELEASED TUG 2:57
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/13/2015 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 10/13/2015 12:46:55 PM CONTINUOUS LOAD PATH FOR UPLIFT RESISTANCE FBC.. 802.1.9 MISSING STRAPPS ON TRUSSES; A-10, HJ1, HJ, CJA, CO1, CHECK ALL. DOWN CELL AT LEFT SIDE OF ENTRYWAY
TIE BEAM / LINTEL 09/21/2015 APPROVED CMINI
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 09/18/2015 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 9/18/2015 9:48:49 AM ADD DOWN ROD CIRCLED ON PLANS DRILL AND EPOXY IN 2-PLACES INDICATED ON PLANS (CIRCLED)
FOUND SURVEY APPROVED (OFFICE) 09/17/2015 APPROVED DREWIS
MONOLITHIC SLAB 09/10/2015 APPROVED - AS NOTED LMILLER
Note: Inspection Resulted at 9/10/2015 9:54:43 AM SIGN OFF PLOACARD NOT ON SITE AT TIME OF INSPECTION. PLEASE LOCATE AND POST!
PLUMBING 1ST ROUGH UNDERGROUND 09/09/2015 APPROVED JCOLASANTI
GRAVITY SEWER TEST 09/09/2015 APPROVED JCOLASANTI
U - SEWER TIE IN 09/09/2015 APPROVED JNICHOLS

Review History

Department Status Date In Date Out
SW1 COMPLETE 01/27/2016 01/27/2016
Note: Released By: DREWIS final survey
ELEC COMPLETE 01/26/2016 01/26/2016
ZON COMPLETE 01/19/2016 01/19/2016
BLD COMPLETE 01/12/2016 01/12/2016
ZON HOLD 01/12/2016 01/13/2016
Note: Site plan required. It must depict proposed structure and include dimensions and setbacks. T. Childs 986-2473
MECH COMPLETE 11/16/2015 11/16/2015
MECH HOLD 11/12/2015 11/16/2015
Note: Revision: Energy Performance Level (EPL) Display Card on energy calculations shall be signed by the builder per FBCEC 5th ed. R405.4.3. F.N.Reodica- 386-986-4734.
SW1 COMPLETE 09/16/2015 09/17/2015
Note: Released By: DREWIS foundation survey
ENGIN1 COMPLETE 09/03/2015 09/04/2015
Note: No swale plan required.
SW1 COMPLETE 09/03/2015 09/03/2015
ZON COMPLETE 09/03/2015 09/04/2015
ELEC COMPLETE 08/18/2015 08/20/2015
PLUM COMPLETE 08/18/2015 08/20/2015
BLD COMPLETE 07/01/2015 07/06/2015
ELEC HOLD 07/01/2015 07/02/2015
Note: 1. Provide electrical load calculations. 2008 NEC art 220.
ENGIN1 COMPLETE 07/01/2015 07/01/2015
Note: No swale plan required.
MECH COMPLETE 07/01/2015 07/06/2015
PLUM HOLD 07/01/2015 07/06/2015
Note: 1. Provide a plumbing riser diagram 2010 FBC 107.2.1.
SW1 COMPLETE 07/01/2015 07/01/2015
UD1 COMPLETE 07/01/2015 07/02/2015
Note: See comment in general notes Danny Spencer 386-386-2640
ZON COMPLETE 07/01/2015 07/02/2015
URB COMPLETE 07/01/2015 07/01/2015

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 02/03/2016
REVISION ¤40.00 02/03/2016
REVISION ¤40.00 02/03/2016
REVISION ¤40.00 02/03/2016
REINSPECTION FEE ¤40.00 02/03/2016
REINSPECTION FEE ¤40.00 02/03/2016
NEW RESIDENTIAL INSPECTIONS ¤630.00 08/26/2015
SITE PLAN 20 ¤20.00 08/26/2015
SURCHARGE FS 533.721 ¤22.85 08/26/2015
SURCHARGE - FS 468.631 ¤22.85 08/26/2015
STORM WATER PERMIT FEES ¤80.00 08/26/2015
3% TRANS IMPACT FEE CREDIT (¤91.51) 08/26/2015
ADMIN FEE ¤20.00 08/26/2015
ELECTRIC FEE ¤249.00 08/26/2015
3% FIRE IMPACT FEE CREDIT (¤6.38) 08/26/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤212.80 08/26/2015
IMPACT FEE PARKS ¤849.24 08/26/2015
IMPACT FEE SCHOOL ¤3,600.00 08/26/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 08/26/2015
MECHANICAL FEE ¤249.00 08/26/2015
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/26/2015
PLAN CHECK FEE ¤126.00 08/26/2015
PLUMBING FEE ¤249.00 08/26/2015
Fees Total Due: ¤0.00 Total Paid: ¤9,497.61