Permit #2015070351
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7016-00070-0070 |
| CONDITIONED SPACE: 180 sqft |
| Total Square Footage: 180 sqft |
| Block: 00070 |
| Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE |
| Job Phone: 386-437-2997 |
| Location Address: 80 COLECHESTER LN |
| Type: BA - BUILDING ADDITION |
| Issue Date: 08/03/2015 |
| NOC: RECORDED |
| Applicant name: THOMAS CHARLES TALLAKSEN JR. |
| Owner: VENTURA, THOMAS & TERESE |
|
Address 80 COLECHESTER LANE PALM COAST, FL 32137 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: ADDITION/INTERIOR REMODEL |
| Type: CN |
Contractor
TALLY'S CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
503 SOUTH OLD DIXIE HWY BUNNELL, FL 32110 |
CRC1330234 (Exp: 08/31/2024) | 386-931-2990 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32136 |
CAC048127 (Exp: 08/31/2018) | 386-445-5023 | 386-446-4614 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1351 HAZELNUT ST BUNNELL, FL 32110 |
CFC1427527 (Exp: 08/31/2026) | 386-445-2532 | 386-445-5575 |
THOMAS CHARLES TALLAKSEN JR.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
503 SOUTH OLD DIXIE HWY BUNNELL, FL 32110 |
CCC1327743 (Exp: 08/31/2024) | 386-931-2990 | (386)437-2279 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 05/12/2016 | FINAL APPROVED | MBACON |
| BLD - BUILDING FINAL | 05/11/2016 | FINAL APPROVED | CMINI |
| FINAL SURVEY (OFFICE USE ONLY) | 05/09/2016 | APPROVED | DREWIS |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 05/06/2016 | Disapproved - NO FEE | DREWIS |
| Note: Please provide final survey measurements for storm water flow. -DC. Rewis 986-4736 | |||
| LATH/BRICK/ WATER BARRIER | 01/21/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 01/11/2016 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 1/11/2016 1:49:48 PM NEED REVISION FOR GRADE ON SERICE, AND CHANGED TO UNDERGROUND | |||
| ALL ROUGH | 01/06/2016 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 1/6/2016 11:22:22 AM SUPPORT AND STRAP WIRES IN GARAGE, RECPT WALL SPACING IN BEDROOMS, NEEDES CORRECTION, NEED TO PICK UP APPROVED TRUSS REPAIR FROM BD | |||
| LATH/BRICK/ WATER BARRIER | 12/28/2015 | CANCELLED BY APPLICANT | CMINI |
| WALL SHEATHING | 11/19/2015 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/19/2015 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 11/19/2015 11:34:09 AM INTERIOR TRUSS REPAIR ON EXISTING TRUSSES NEEDED BY ALL ROUGH | |||
| TIE BEAM / LINTEL | 09/14/2015 | APPROVED | LMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 09/11/2015 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 08/20/2015 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/18/2015 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 05/09/2016 | 05/09/2016 |
| Note: Released By: DREWIS | |||
| SW1 | HOLD | 05/05/2016 | 05/06/2016 |
| Note: Held By: DREWIS FINAL S Please provide the final survey measurements depicting the storm water flow for the site where work was performed. -DC. Rewis 986-4736 | |||
| ELEC | COMPLETE | 03/08/2016 | 03/09/2016 |
| ELEC | HOLD | 01/26/2016 | 01/26/2016 |
| Note: Please prove a riser diagram signed(with license number) by the electrical contractor. -DC. Rewis 986-4736 | |||
| BLD | COMPLETE | 01/07/2016 | 01/07/2016 |
| SW1 | COMPLETE | 09/10/2015 | 09/11/2015 |
| Note: Released By: DREWIS foundation s | |||
| PLUM | COMPLETE | 07/30/2015 | 07/30/2015 |
| PLUM | HOLD | 07/28/2015 | 07/29/2015 |
| Note: Sanitary riser diagram for the first floor does not match with floor plan. Also, identify bathroom name for clarity per FBC 5th ed. 107.2.1 as previously requested. Also, the fixture drain of the stand pipe serving washing machine at the second floor shall connect to a 3-inch branch drain downstream of bathroom group per FBCR 5th ed. P3108.1/FBCP5th ed.406.2. | |||
| MECH | COMPLETE | 07/28/2015 | 07/28/2015 |
| ELEC | COMPLETE | 07/28/2015 | 07/29/2015 |
| ELEC | HOLD | 07/17/2015 | 07/21/2015 |
| Note: 1. Provide replacement pages that have the corrected information on them.The original pages have conflicting information from the new pages. | |||
| BLD | COMPLETE | 07/17/2015 | 07/21/2015 |
| MECH | HOLD | 07/17/2015 | 07/21/2015 |
| Note: Previous comment 2 shall be addressed. 2. Provide EPL Display Card signed by the builder per FBCEC 5th ed. R405.4.3. | |||
| PLUM | HOLD | 07/17/2015 | 07/21/2015 |
| Note: Sanitary riser diagram for the first floor does not match with floor plan. Also, provide complete pipe sizes on bathroom and identify bathroom name for clarity per FBC 5th ed. 107.2.1. | |||
| ZON | COMPLETE | 07/17/2015 | 07/17/2015 |
| BLD | HOLD | 07/14/2015 | 07/14/2015 |
| Note: 1. Provide a 7/8 in. minimum wood frame wall exterior finish that complies with 5th ed. FBC R Table 702.1 (1). and 703.6. | |||
| SW1 | COMPLETE | 07/14/2015 | 07/14/2015 |
| ZON | HOLD | 07/14/2015 | 07/15/2015 |
| Note: Re-label "office" with another residential room-type. Residential dwellings are not allowed to have commercially named rooms. | |||
| ELEC | HOLD | 07/14/2015 | 07/14/2015 |
| Note: 1. provide disconnects at the air handler units. 2011 NEC 422. | |||
| MECH | HOLD | 07/14/2015 | 07/14/2015 |
| Note: 1. Provide hvac duct system layout on first floor due to relocated ahu unit to second floor per FBC 5th edition 107.2.1. 2. Provide EPL Display Card signed by the builder per FBCEC 5th ed. R405.4.3. | |||
| PLUM | HOLD | 07/14/2015 | 07/14/2015 |
| Note: Provide sanitary riser diagram either prepared by FL design professional or plumbing contractor with signature and license number per FBC 5th ed. 107.2.1. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 05/09/2016 |
| REVISION | ¤40.00 | 05/09/2016 |
| SITE PLAN 20 | ¤20.00 | 08/03/2015 |
| SURCHARGE FS 533.721 | ¤20.04 | 08/03/2015 |
| SURCHARGE - FS 468.631 | ¤20.04 | 08/03/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/03/2015 |
| WORK WITHOUT PERMIT | ¤668.00 | 08/03/2015 |
| WORK WITHOUT PERMIT | 08/03/2015 | |
| ADMIN FEE | ¤20.00 | 08/03/2015 |
| ELECTRIC FEE | ¤168.00 | 08/03/2015 |
| MECHANICAL FEE | ¤168.00 | 08/03/2015 |
| PLAN CHECK FEE | ¤72.00 | 08/03/2015 |
| PLUMBING FEE | ¤168.00 | 08/03/2015 |
| REMODEL/ADDITION/ACCES INSPECT | ¤72.00 | 08/03/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,556.08 |