I want to search for...
Permit #2015070571
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00470-0120 |
| CONDITIONED SPACE: 2427 sqft |
| GARAGE: 575 sqft |
| OPENED PORCH (WITH ROOF) : 180 sqft |
| OPENED PORCH (WITH ROOF) : 19 sqft |
| Total Square Footage: 3201 sqft |
| Block: 00470 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: 904-268-7730 |
| Location Address: 33 WOOD CLIFT LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/26/2015 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMPBELL JR |
| Owner: MARONDA HOMES, INC |
|
Address 9700 PHILIPS HIGHWAY JACKSONVILLE, FL 32256 |
|
Address SUITE 102 JACKSONVILLE, FL 32256 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤121,792.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES INC. OF FLORIDA
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6800 SOUTHPOINT PKWAY SUITE 300 JACKSONVILLE, FL 32216 |
CBC058803 (Exp: 08/31/2018) | 904-268-7730 | 904-268-7740 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
DEBORAH MAXINE JACKSON
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
9474 OLD PLANK RD JACKSONVILLE , FL 32220 |
CCC1328530 (Exp: 08/31/2016) | 904-435-7663 | 904-404-8406 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 04/28/2016 | APPROVED | DSPENCER |
| Note: per contractor | |||
| BLD - BUILDING FINAL | 04/27/2016 | FINAL APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 04/26/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 4/26/2016 3:30:28 PM GROUT ALL TOILETS COMPLETE, NEED STICKERS IDENTIFING GFI AT KIT. ISLAND, HOT/GRD REVERSED AT KIT ISLAND GGI PLUGS, LIGHTING OUTLETS SHALL BE INSTALLED IN BED ROOMS NEC 210.70 (GUEST BEDROOMS BEHIND KITCHEN. | |||
| ROW FINAL | 04/25/2016 | APPROVED | CTROHA |
| Note: SAW CUT IN DRIVEWAY IS ACCEPTABLE | |||
| GRAVITY SEWER TEST | 04/25/2016 | APPROVED | JCOLASANTI |
| Note: SWITCH FROM BUILDING FINAL TO GRAVITY PER CHARLIE | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 04/22/2016 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION ON SITE WITH SUPER. EXPANSION JOINT OVER CULVERT MUST BE CUT DEEPER BEFORE FINAL ROW IS CALLED IN. | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 04/21/2016 | CANCELLED BY APPLICANT | CTROHA |
| Note: SITE MEET WITH CONTRACTOR HE WILL CALL IT BACK IN WHEN HE IS READY | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/21/2016 | APPROVED | DREWIS |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 04/06/2016 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION MUST HAVE EDGES OF THE NEW POUR COMPACTED AND SODDED BEFORE THIS INSPECTION. MATERIAL ALL WASHED OUT ALONG THE NEW POUR EDGES. | |||
| ELECTRIC - EARLY POWER | 04/01/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/1/2016 3:29:44 PM SPOKE TO DELL FPL RELEASED EARLY POWER 3:30 | |||
| ELECTRIC - EARLY POWER | 03/31/2016 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: Inspection Resulted at 3/31/2016 10:25:48 AM SERVICE WIRES LOOSE IN METER, NEED TO CHECK ALL AND TORQUE TO SPEC NEC...110.14 | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 03/31/2016 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: NEED TO HAVE YOUR FINAL SURVEY FOR THIS INSPECTIONS , FAILED FEE | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 03/23/2016 | APPROVED - AS NOTED | CTROHA |
| Note: READY TO POUR CONCRETE NEEDS TO BE 5" IN THE ROW BACK 15' FROM ROAD EDGE | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 03/22/2016 | Disapproved -FEE REQUIRED | RGROSS |
| Note: MUST BE 4 INCHES OF CONCRETE THICKNESS THROUGHOUT THE ENTIRE UPPER POUR. REMOVE MORE MATERIAL FROM THE CENTER AREA TO ACHIEVE THE 4 INCH MINIMUM. | |||
| U - SEWER TIE IN | 03/04/2016 | APPROVED | MBACON |
| FOUND SURVEY APPROVED (OFFICE) | 02/29/2016 | APPROVED | DREWIS |
| INSULATION | 02/09/2016 | APPROVED | JCOLASANTI |
| ALL ROUGH | 02/04/2016 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 02/02/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 2/2/2016 11:23:49 AM NEC 230.75 (TIGHTEN GREEN GROUND SCREW) NO GREEN SCREW........ STRAPPING NEC 358.30(A)AND (B) SEVERAL PLACES IN GARAGE......REQUIRED OUTLETS AND SPACING OF OUTLETS. NEC 2008 210.52 BEDROOM BY GARAGE ENTERING DOOR. TEST ON DWV AND WATER PIPPING TEST PIPE SHALL BE FILLED WITH WATER TO A POINT NOT LESS THAN 10’AND HELD UNDER TEST FOR A PERIOD OF 15 MIN. FPC .312 FBC 2503.5.1 NEED TO HOLD MORE WATER IN PIPE.......NAIL PLATES NEED TO BE INSTALLED VARIOUS PLACES AND SECURITY WIRES BY WINDOWS, CODE READS ALL WIRES NEED TO BE PROTECTED. | |||
| LATH/BRICK/ WATER BARRIER | 01/21/2016 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/10/2015 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/08/2015 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 12/8/2015 11:59:58 AM TRUSSES AT REAR PORCH NOT ATTACHED PER PLAN, STRAP NEEDS TO BE NAILED 3 PLY TRUSS GARAGE. (CIRCLED ON PLANS). | |||
| TIE BEAM / LINTEL | 11/19/2015 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 11/18/2015 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 11/18/2015 2:37:44 PM DRIIL AND EPOXY MISSING DOWELS AT BACK PORCH COLLUMN | |||
| TIE BEAM / LINTEL | 11/17/2015 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 11/17/2015 11:51:00 AM MISSING CONTINUES STEEL AT TOP OF DOULBE WINDOW REAR WALL. | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/16/2015 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 10/30/2015 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/27/2015 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/22/2015 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/22/2015 9:57:39 AM PLUMBING COVERED UP BEFORE INSPWCTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/20/2015 | Disapproved - NO FEE | JCOLASANTI |
| Note: Inspection Resulted at 10/20/2015 12:10:18 PM COURTESY INSPECTION. PERMITS PULLED AFTER 7/1.HOT WATER PIPING UNDER SLAB MUST BE INSULATED PER FBC-ENERGY 403.4.2. NEED TO INSTALL INSULATION AND CALL IN FOR RE-INSPECTION | |||
| STEM WALL FOUNDATION | 10/06/2015 | APPROVED | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/20/2016 | 04/21/2016 |
| Note: Released By: DREWIS final survey | |||
| SW1 | COMPLETE | 02/29/2016 | 02/29/2016 |
| Note: Released By: DREWIS foundation s | |||
| SW1 | COMPLETE | 11/16/2015 | 11/16/2015 |
| Note: Released By: DREWIS foundation survey | |||
| ELEC | COMPLETE | 08/14/2015 | 08/18/2015 |
| BLD | COMPLETE | 08/14/2015 | 08/18/2015 |
| MECH | COMPLETE | 08/14/2015 | 08/18/2015 |
| BLD | HOLD | 07/22/2015 | 07/22/2015 |
| Note: 1. Provide plans that are designed per the 5th ed. Florida Building Code.2. Provide 30 lb. roof underlayment per 5th ed. FBC R 905.2.7. 3. Provide 1/2 in. exterior masonry plaster to block per 5th ed. FBC R table702.1 (1). | |||
| ELEC | HOLD | 07/22/2015 | 07/22/2015 |
| Note: 1. Provide plans that are designed per the 2011 NEC. 2. Provide a disconnect for the condensing unit. 2011 NEC 440.14. | |||
| ENGIN1 | COMPLETE | 07/22/2015 | 07/28/2015 |
| MECH | HOLD | 07/22/2015 | 07/22/2015 |
| Note: Provide energy calculation based on updated Form 405-2014 per FBCEC 5th edition R405.4. | |||
| PLUM | COMPLETE | 07/22/2015 | 07/22/2015 |
| SW1 | COMPLETE | 07/22/2015 | 07/22/2015 |
| UD1 | COMPLETE | 07/22/2015 | 07/23/2015 |
| Note: See Notes | |||
| ZON | COMPLETE | 07/22/2015 | 07/23/2015 |
| URB | COMPLETE | 07/22/2015 | 07/22/2015 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/27/2016 |
| REINSPECTION FEE | ¤40.00 | 04/27/2016 |
| REINSPECTION FEE | ¤40.00 | 04/27/2016 |
| REINSPECTION FEE | ¤40.00 | 04/27/2016 |
| REINSPECTION FEE | ¤40.00 | 04/27/2016 |
| REINSPECTION FEE | ¤40.00 | 04/27/2016 |
| REINSPECTION FEE | ¤40.00 | 04/27/2016 |
| REINSPECTION FEE | ¤40.00 | 04/27/2016 |
| REINSPECTION FEE | ¤40.00 | 04/27/2016 |
| REINSPECTION FEE | ¤40.00 | 04/27/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤602.00 | 08/26/2015 |
| SITE PLAN 20 | ¤20.00 | 08/26/2015 |
| SURCHARGE FS 533.721 | ¤21.96 | 08/26/2015 |
| SURCHARGE - FS 468.631 | ¤21.96 | 08/26/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/26/2015 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.51) | 08/26/2015 |
| ADMIN FEE | ¤20.00 | 08/26/2015 |
| ELECTRIC FEE | ¤240.60 | 08/26/2015 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 08/26/2015 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 08/26/2015 |
| IMPACT FEE PARKS | ¤849.24 | 08/26/2015 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/26/2015 |
| IMPACT FEE TRANSPORTATION | ¤3,050.24 | 08/26/2015 |
| MECHANICAL FEE | ¤240.60 | 08/26/2015 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/26/2015 |
| PLAN CHECK FEE | ¤120.40 | 08/26/2015 |
| PLUMBING FEE | ¤240.60 | 08/26/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,597.03 |