Permit #2015070754
Permit Details
Status: COED
| Parcel Id: 07-11-31-7006-00050-0220 |
| CONDITIONED SPACE: 2866 sqft |
| GARAGE: 642 sqft |
| OPENED PORCH (WITH ROOF) : 135 sqft |
| OPENED PORCH (WITH ROOF) : 68 sqft |
| Total Square Footage: 3711 sqft |
| Block: 00050 |
| Subdivision: 2213 - SECTION 6-FLORIDA PARK |
| Job Phone: 386-445-9055 |
| Location Address: 3 FLETCHER CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/26/2015 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: CARCICH, ANTHONY P & LISA S |
|
Address 45 CHESTNUT RIDGE RD HOLANDER, NJ 07733 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SUN STATE CUSTOM BUILDERS, LLC
| Status | Location Address | State License Number |
| CANCEL |
946 SHADICH DRIVE ORANGE CITY, FL |
CGC1519145 (Exp: 08/31/2022) |
Sub Contractors
CHARLES K DAVIS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3000 E MOODY BLVD BLDG 2 BUNNELL , FL 32110 |
EC13004270 (Exp: 08/31/2026) | 386-931-6614 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1351 HAZELNUT ST BUNNELL, FL 32110 |
CFC1427527 (Exp: 08/31/2026) | 386-445-2532 | 386-445-5575 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 08/23/2017 | FINAL APPROVED | JNICHOLS |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 08/21/2017 | Disapproved - NO FEE | JNICHOLS |
| Note: The sewer cleanout cap that is located within the paver driveway needs to be changed to a brass cap | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 08/18/2017 | APPROVED | RGROSS |
| Note: APPROVED | |||
| ROW FINAL | 08/18/2017 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. APPROVED | |||
| ROW FINAL | 08/15/2017 | Disapproved -FEE REQUIRED | CTROHA |
| Note: NO FINAL SURVEY ON SITE EROSION BY THE SEAWALL SOD ALL BARE GROUND ADJACENT TO THE SEAWALL | |||
| BLD - BUILDING FINAL | 08/14/2017 | FINAL APPROVED | CMINI |
| FINAL SURVEY (OFFICE USE ONLY) | 08/11/2017 | APPROVED | JHINDMAN |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 06/20/2017 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. READY FOR PAVERS. | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 06/09/2017 | PARTIALLY APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. APPROVED FOR CONCRETE APRON AND OVER PIPE ONLY. PAVER DRIVEWAY. ON SITE WITH CONTRACTOR EXPLAINING HOW PARTIAL APPROVAL WORKS. | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 06/08/2017 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION. NO SWALE ON SITE. MISSING DOCUMENTATION. | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 06/07/2017 | Disapproved - NO FEE | RGROSS |
| Note: HEAVY RAINS BEFORE INSPECTION. CULVERT AND SWALE FLOODED. NO FEE. CONTRACTOR TO RESCHEDULE PRE POUR INSPECTION. 11:55 AM | |||
| ELECTRIC - EARLY POWER | 05/08/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 11:40 | |||
| GRAVITY SEWER TEST | 03/29/2017 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 03/29/2017 | APPROVED | JNICHOLS |
| Note: there was no inspection card on site to sign. this tie in looked good. | |||
| ELECTRIC-TUG | 02/10/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG 2:40 | |||
| INSULATION | 12/12/2016 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 12/09/2016 | FINAL APPROVED | CMINI |
| ALL ROUGH | 12/01/2016 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/01/2016 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 09/12/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 08/30/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: OVERBEND DOWEL BAR FBC R606.13.3 EXCEPTION (CIRCLED ON FOUNDATION PAGE WITH RED INK). REPAIR EROSION AT BACK PORCH AND OBTAIN ENGINEERS LETTER OF CORRECTION AND APPROVED SOIL TESTS OF COMPLETED REPAIR (FOOTINGS UNDERMINED) | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/04/2016 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 03/08/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 3/8/2016 11:09:33 AM SPEC ITEM NUMBER - 10 SHOULD BE 4-NUMBER FIVES EACH WAY. | |||
| MONOLITHIC SLAB | 03/08/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/02/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/01/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 3/1/2016 11:16:09 AM SILT FENCE NEEDS TO BE PROPERLY INSTALLED TO PROTECT ADJASCENT PROPERTY AND WATERWAY. PRESSURE TEST FOR SUPPLLY LINES P2503.7 WATER SUPPLY-SYSTEM TESTING. MUST USE WATER FOR PLASTIC PIPE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 08/11/2017 | 08/11/2017 |
| Note: Released By: JHINDMAN FINAL | |||
| ENGIN1 | COMPLETE | 02/16/2017 | 02/16/2017 |
| SW1 | COMPLETE | 02/16/2017 | 02/16/2017 |
| UD1 | COMPLETE | 02/16/2017 | 02/20/2017 |
| Note: This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 02/16/2017 | 02/16/2017 |
| SW1 | COMPLETE | 05/03/2016 | 05/04/2016 |
| Note: Released By: DREWIS Foundation survey | |||
| ZON | COMPLETE | 10/05/2015 | 10/06/2015 |
| ELEC | COMPLETE | 09/25/2015 | 09/25/2015 |
| PLUM | COMPLETE | 09/25/2015 | 09/28/2015 |
| BLD | COMPLETE | 09/25/2015 | 09/28/2015 |
| URB | COMPLETE | 09/25/2015 | 09/25/2015 |
| ZON | HOLD | 09/25/2015 | 09/28/2015 |
| Note: REPEAT COMMENT: Right of Way Utilization Agreement for paver driveway is required. Please note that this Agreement must be signed by all persons on property deed, witnessed and notarized. If driveway material is changed, the site plan must be corrected to indicate the change. | |||
| BLD | HOLD | 07/28/2015 | 07/28/2015 |
| Note: 1. Provide plans that are designed to the 5th edition (2014) of the Florida building code. | |||
| ELEC | HOLD | 07/28/2015 | 07/28/2015 |
| Note: 1. Provide plans that are designed to the 2011 NEC. 2. Provide electrical load calculation per 2011 NEC art 220. | |||
| ENGIN1 | COMPLETE | 07/28/2015 | 07/31/2015 |
| MECH | COMPLETE | 07/28/2015 | 07/28/2015 |
| PLUM | HOLD | 07/28/2015 | 07/28/2015 |
| Note: Sanitary riser diagram shows summer kitchen sink drain tied into a shower fixture drain of pool bathroom which does not comply with FBCR 5th edition P3108.1. | |||
| SW1 | COMPLETE | 07/28/2015 | 07/28/2015 |
| UD1 | COMPLETE | 07/28/2015 | 07/29/2015 |
| Note: See Notes | |||
| ZON | HOLD | 07/28/2015 | 07/29/2015 |
| Note: 1. Provide landscape plan. 2. Right of Way Utilization Agreement for paver driveway is required. Please note that this Agreement must be signed by all persons on property deed, witnessed and notarized. | |||
| URB | HOLD | 07/28/2015 | 07/29/2015 |
| Note: Need landscape plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/23/2017 |
| CONTRACTOR CHANGE | ¤40.00 | 08/23/2017 |
| REINSPECTION FEE | ¤40.00 | 08/23/2017 |
| REINSPECTION FEE | ¤40.00 | 08/23/2017 |
| REINSPECTION FEE | ¤40.00 | 08/23/2017 |
| REINSPECTION FEE | ¤40.00 | 08/23/2017 |
| REINSPECTION FEE | ¤40.00 | 08/23/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤704.00 | 10/26/2015 |
| SITE PLAN 20 | ¤20.00 | 10/26/2015 |
| SURCHARGE FS 533.721 | ¤25.18 | 10/26/2015 |
| SURCHARGE - FS 468.631 | ¤25.18 | 10/26/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/26/2015 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.51) | 10/26/2015 |
| ELECTRIC FEE | ¤271.20 | 10/26/2015 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 10/26/2015 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 10/26/2015 |
| IMPACT FEE PARKS | ¤849.24 | 10/26/2015 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/26/2015 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 10/26/2015 |
| IMPACT FEE TRANSPORTATION | ¤3,050.24 | 10/26/2015 |
| MECHANICAL FEE | ¤271.20 | 10/26/2015 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/26/2015 |
| PLAN CHECK FEE | ¤140.80 | 10/26/2015 |
| PLUMBING FEE | ¤271.20 | 10/26/2015 |
| ADMIN FEE | ¤20.00 | 10/26/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,750.17 |