I want to search for...
Permit #2015080567
Permit Details
Status: COED
| Parcel Id: 07-11-31-7017-00010-0700 |
| CONDITIONED SPACE: 2313 sqft |
| GARAGE: 745 sqft |
| OPENED PORCH (WITH ROOF) : 562 sqft |
| OPENED PORCH (WITH ROOF) : 71 sqft |
| Total Square Footage: 3691 sqft |
| Block: 00010 |
| Subdivision: 2129 - SECTION 17-BELLE TERRE |
| Job Phone: (386)931-1917 |
| Location Address: 169 BOULDER ROCK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/04/2015 |
| NOC: RECORDED |
| Applicant name: BRAD MICHAEL THOMAS |
| Owner: GEST, JAMES & FREDERICKA |
|
Address 1 ETHAN PLACE PALM COAST, FL 32164 |
| Lot: 0700 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AUBURN HOMES INC.
| Status | Location Address | State License Number | Phone |
| HOLD |
1 HARGROVE GRADE STE 1E PALM COAST, FL 32137 |
CGC1506292 (Exp: 08/31/2020) | (386)931-1917 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1351 HAZELNUT ST BUNNELL, FL 32110 |
CFC1427527 (Exp: 08/31/2026) | 386-445-2532 | 386-445-5575 |
YORDANIS GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
33 RICKENBACKER DRIVE PALM COAST, FL 32164 |
CCC1328730 (Exp: 08/31/2026) | 386-804-4109 |
WESLEY KIRKLAND CORDELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
873 HULL RD UNIT 20 ORMOND BEACH, FL 32174 |
SCC131151505 (Exp: 08/31/2026) | 386-852-2209 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 02/26/2016 | FINAL APPROVED | MBACON |
| BLD - BUILDING FINAL | 02/25/2016 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROW FINAL | 02/25/2016 | FINAL APPROVED | CTROHA |
| Note: APPROVED | |||
| ROW FINAL | 02/17/2016 | Disapproved -FEE REQUIRED | CTROHA |
| Note: knee wall along the water in the row and is not on the survey need to remove wall and grade a maintainable slope sod in swale must match existing grade seed adj property where straw was placed | |||
| BLD - BUILDING FINAL | 02/17/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 2/17/2016 12:45:10 PM SMOKE DETECTOR IN GUEST HALL NEEDS TO BE 10``MIN FOR BEDROOM OPENING.....GFI NOT WORKING @ ADJACENT TO GARAGE, PORCH SIDE......EXHAUST FANS CANNOT BE WITHIN 3`` OF OPERABLE WINDOW. RETAINING WALL REAR OF HOUSE TO BE REMOVED AS LOCATED IN CITY ROW. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/16/2016 | APPROVED | JHINDMAN |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 02/15/2016 | APPROVED - AS NOTED | RGROSS |
| Note: ADJUSTMENTS WERE MADE SO DRIVEWAY MATCHED FINAL SURVEY | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 01/29/2016 | APPROVED - AS NOTED | RGROSS |
| Note: FINAL SURVEY MUST SHOW DRIVEWAY AS FORMED AND POURED. | |||
| ELECTRIC - EARLY POWER | 01/28/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/28/2016 3:17:47 PM SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:30 | |||
| ELECTRIC - EARLY POWER | 01/27/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 1/27/2016 3:08:10 PM COVERS OFF BACKSPLASH OUTLETS AND LGHT AT MASTER BATHROOM TOILET. | |||
| ELECTRIC-TUG | 01/05/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: Inspection Resulted at 1/5/2016 2:18:32 PM SPOKE TO DELL AT FPL RELEASED TUG AT 2:18 | |||
| U - SEWER TIE IN | 12/18/2015 | APPROVED | JNICHOLS |
| GRAVITY SEWER TEST | 12/09/2015 | APPROVED | JCOLASANTI |
| LATH/BRICK/ WATER BARRIER | 12/03/2015 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 12/03/2015 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 12/02/2015 | CANCELLED BY APPLICANT | JCOLASANTI |
| INSULATION | 12/02/2015 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 12/2/2015 2:43:45 PM FIREBLOCKING NEEDED…..F.B.C. 302.11 NEED TO FOAM GAPS IN ARCH BLOCKING, NEED TO REPAIR FIREBLOCKING AT END OF ARCH AT FOYER...... METAL BOXES SHALL BE GROUNDED NEC.314.4 (PLEASE CHECK BOX FOYER CIELING.) | |||
| TIE BEAM / LINTEL | 11/23/2015 | APPROVED | JCOLASANTI |
| ALL ROUGH | 11/23/2015 | APPROVED - AS NOTED | JCOLASANTI |
| Note: Inspection Resulted at 11/23/2015 2:50:36 PM NEED TO CHECK FIREBLOCKING AT FRONT ENTRY NICHE AND ARCHWAY. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/20/2015 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/19/2015 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 11/19/2015 3:38:06 PM CONTINUOUS LOAD PATH FOR UPLIFT RESISTANCE FBC.. 802.1.9....(COULD NOT SEE STRAPS AT ENTRY TRUSSES PER PLAN) | |||
| ELEV CERT-FOUNDATION APPROVAL | 11/06/2015 | APPROVED | CBENTLEY |
| FOUND SURVEY APPROVED (OFFICE) | 10/28/2015 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 10/07/2015 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/06/2015 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/05/2015 | CANCELLED BY APPLICANT | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 02/25/2016 | 02/25/2016 |
| Note: Released By: FREODICA revised final survey | |||
| PLFM | COMPLETE | 02/12/2016 | 02/12/2016 |
| SW1 | COMPLETE | 02/11/2016 | 02/16/2016 |
| Note: Released By: JHINDMAN FINAL S | |||
| BLD | COMPLETE | 01/27/2016 | 01/27/2016 |
| SW1 | COMPLETE | 01/27/2016 | 01/27/2016 |
| ZON | COMPLETE | 01/27/2016 | 01/28/2016 |
| PLFM | COMPLETE | 11/05/2015 | 11/06/2015 |
| SW1 | COMPLETE | 10/27/2015 | 10/28/2015 |
| Note: Released By: DREWIS FOUNDATION S | |||
| ZON | COMPLETE | 09/04/2015 | 09/04/2015 |
| ZON | HOLD | 09/01/2015 | 09/02/2015 |
| Note: Required foundation plantings at rear of home facing freshwater canal must continue along the lanai except at any access (door) openings. | |||
| URB | COMPLETE | 09/01/2015 | 09/03/2015 |
| Note: Prior to clearing all saved trees will require a barricade. | |||
| PLUM | COMPLETE | 09/01/2015 | 09/01/2015 |
| PLFM | COMPLETE | 08/24/2015 | 08/25/2015 |
| BLD | COMPLETE | 08/21/2015 | 08/24/2015 |
| ELEC | COMPLETE | 08/21/2015 | 08/24/2015 |
| ENGIN1 | COMPLETE | 08/21/2015 | 08/27/2015 |
| MECH | COMPLETE | 08/21/2015 | 08/24/2015 |
| PLUM | HOLD | 08/21/2015 | 08/24/2015 |
| Note: Laundry tub and washing machine connection as shown on sanitary riser diagram does not comply with FBCR P3108.1. | |||
| SW1 | COMPLETE | 08/21/2015 | 08/24/2015 |
| UD1 | COMPLETE | 08/21/2015 | 08/24/2015 |
| Note: See Notes | |||
| ZON | HOLD | 08/21/2015 | 08/24/2015 |
| Note: 1. Site plan depicts concrete driveway, however culvert detail sheets are for a paver driveway. Please correct whichever is wrong. Note that if a paver driveway is to be installed, a completed Right of Way Utilization is required. The agreement must be signed by all persons on property deed, witnessed and notarized. 2. Site plan must provide setbacks of A/C pad to demonstrate that it does not encroach into the 5' easement. 3. Paver patio in front is encroaching 7.5' side setback. 4. Foundation plantings are required along rear of home facing freshwater canal; A/C pad must be screened. 5. Landscape plan depicts floratam sod which requires an irrigation system. This must be shown on the plan. 6. Banding is required around all doors and windows facing the canal. | |||
| URB | HOLD | 08/21/2015 | 08/24/2015 |
| Note: 1.Legend for saved trees is cut off. 2. Need to indicate irrigation on plan. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 02/26/2016 |
| REINSPECTION FEE | ¤40.00 | 02/26/2016 |
| REINSPECTION FEE | ¤40.00 | 02/26/2016 |
| REINSPECTION FEE | ¤40.00 | 02/26/2016 |
| REINSPECTION FEE | ¤40.00 | 02/26/2016 |
| REVISION | ¤40.00 | 02/26/2016 |
| SITE PLAN 20 | ¤20.00 | 09/04/2015 |
| SURCHARGE FS 533.721 | ¤22.78 | 09/04/2015 |
| SURCHARGE - FS 468.631 | ¤22.78 | 09/04/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/04/2015 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.51) | 09/04/2015 |
| NEW RESIDENTIAL INSPECTIONS | ¤628.00 | 09/04/2015 |
| ADMIN FEE | ¤20.00 | 09/04/2015 |
| ELECTRIC FEE | ¤248.40 | 09/04/2015 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 09/04/2015 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 09/04/2015 |
| IMPACT FEE PARKS | ¤849.24 | 09/04/2015 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/04/2015 |
| IMPACT FEE TRANSPORTATION | ¤3,050.24 | 09/04/2015 |
| MECHANICAL FEE | ¤248.40 | 09/04/2015 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/04/2015 |
| PLAN CHECK FEE | ¤125.60 | 09/04/2015 |
| PLUMBING FEE | ¤248.40 | 09/04/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,493.27 |