Permit #2015080646

Permit Details

Status: COED

Parcel Id: 15-11-31-2830-00000-0590
CONDITIONED SPACE: 2831 sqft
GARAGE: 447 sqft
SCREEN PORCH (SOLID ROOF) : 657 sqft
OPENED PORCH (WITH ROOF) : 99 sqft
Total Square Footage: 4034 sqft
Block: 00000
Subdivision: 1071 - FRONT STREET @ GRAND HAVEN PHASE 1
Job Phone: (386) 446-5850
Location Address: 51 FRONT ST
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/10/2015
NOC: RECORDED
Applicant name: CHARLES DALLAS RINEK
Owner: FLANAGAN, JOHN F & JUDY G

Address

76 COVINGTON LANE

PALM COAST, FL 32137

Lot: 0590
Contracted Stated Job Value: ¤398,425.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

CHARLES RINEK CONSTRUCTION, INC.
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 352502

Palm Coast, FL 32137

CGC046080 (Exp: 08/31/2026) (386) 446-5850 (386)445-9992

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
BRANDON LEONARD LOSIK
Status Location Address State License Number Phone
INACTIVE

4680 LAKE INDUSTRIAL BLVD

CLEARMONT, FL 34714

CCC1330061 (Exp: 08/31/2024) 352-459-7599

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 08/01/2016 FINAL APPROVED MBACON
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 07/29/2016 Disapproved - NO FEE MBACON
Note: Sewer cleanout at property line is not visible. Please make sure it is a flushmount cap at grade level
BLD - BUILDING FINAL 07/28/2016 FINAL APPROVED LMILLER
FINAL APRON (AFTER POUR/DRIVEWAY) 07/27/2016 APPROVED RGROSS
Note: THIS IS A REINSPECTION. APPROVED
ROW FINAL 07/27/2016 APPROVED RGROSS
Note: APPROVED
FINAL SURVEY (OFFICE USE ONLY) 07/25/2016 APPROVED DREWIS
FINAL APRON (AFTER POUR/DRIVEWAY) 07/12/2016 Disapproved -FEE REQUIRED CTROHA
Note: CUT OUT SIDE WALK BACK 5' AND REPLACE (PATCH NOT ACCEPTABLE) SEE PHOTO
PRE-APRON (PRE-POUR/DRIVEWAY) 06/20/2016 APPROVED - AS NOTED GLALIMA
Note: SO YOU KNOW YOU ASK BEFOR YOU PATCH STREET GUTTERS. THANK YOU GARY LALIMA
PRE-APRON (PRE-POUR/DRIVEWAY) 06/14/2016 PARTIALLY APPROVED GLALIMA
Note: CONCRETE AND SIDEWALKS ONLY . CALL WHEN YOU GET PAVER BASE
U - SEWER TIE IN 05/26/2016 APPROVED JNICHOLS
GRAVITY SEWER TEST 05/25/2016 CANCELLED BY APPLICANT AIRS WEB
GRAVITY SEWER TEST 05/25/2016 APPROVED LMILLER
ELECTRIC - EARLY POWER 05/02/2016 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 5/2/2016 2:31:21 PM ELECTRIC REVISION DID NOT SHOW ADDED ELECTRIC SUB PANEL IN GARAGE OR ON RISER DIAGRAM, NEED REVISION BY FINAL, CALLED FPL SPOKE TO DELL RELEASED EARLY POWER 2:30
LATH/BRICK/ WATER BARRIER 02/16/2016 APPROVED DROCKWELL
INSULATION 01/25/2016 APPROVED LMILLER
ALL ROUGH 01/19/2016 APPROVED - AS NOTED LMILLER
Note: Inspection Resulted at 1/19/2016 3:32:16 PM OBTAIN APPROVED REVISION FOR ADDED ELECTRIC PRIOR TO FINAL
ELECTRIC-TUG 12/22/2015 APPROVED - AS NOTED LMILLER
Note: CALLED FPL TRALKED TO SUSAN AND RELEASED TUG
ELECTRIC - EARLY POWER 12/21/2015 CANCELLED BY APPLICANT LMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/07/2015 APPROVED DROCKWELL
TIE BEAM / LINTEL 11/10/2015 APPROVED LMILLER
FOUND SURVEY APPROVED (OFFICE) 11/09/2015 APPROVED DREWIS
ELEV CERT-FOUNDATION APPROVAL 11/06/2015 APPROVED CBENTLEY
MONOLITHIC SLAB 10/21/2015 APPROVED LMILLER
Note: THIS IS A REINSPECTION per contractor
MONOLITHIC SLAB 10/20/2015 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 10/20/2015 11:40:33 AM NEED A FULL SET OF APPROVED PLANS ON FUTURE INSPECTIONS, NEED 4 #5``S EACH WAAY WHERE CIRCLED ON REVISIONS
PLUMBING 1ST ROUGH UNDERGROUND 10/16/2015 APPROVED LMILLER
PLUMBING 1ST ROUGH UNDERGROUND 10/15/2015 Disapproved -FEE REQUIRED LMILLER
Note: Inspection Resulted at 10/15/2015 2:31:12 PM 10’ HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.4, AND OR FBC CHAPTER 25 SECTION P2503.5.1 BUILDING SEWER TESTING. TESTING WITH NOT LESS THAN 10-FOOT (3048MM) OF HEAD WATER AND BE ABLE TO MAINTAIN SUCH PRESSURE FOR 15 MINUTES.

Review History

Department Status Date In Date Out
PLFM COMPLETE 08/02/2016 08/03/2016
PLFM COMPLETE 07/26/2016 07/26/2016
SW1 COMPLETE 07/25/2016 07/25/2016
Note: Released By: DREWIS FINAL S
ELEC COMPLETE 05/10/2016 05/10/2016
ELEC COMPLETE 02/10/2016 02/10/2016
SW1 COMPLETE 11/06/2015 11/09/2015
Note: Released By: DREWIS Foundation survey
PLFM COMPLETE 11/04/2015 11/06/2015
BLD COMPLETE 10/16/2015 10/16/2015
ZON COMPLETE 09/08/2015 09/09/2015
MECH COMPLETE 09/03/2015 09/03/2015
ZON HOLD 09/03/2015 09/03/2015
Note: REPEAT COMMENT (2nd TIME) 1. Only concrete pads 50 square feet or less are allowed within the setback area. The proposed AC pad does not meet this criteria. The A/C pad on the site plan is 75.58 square feet. Provide revised site plan correcting this. T. Childs 986-2473
ELEC COMPLETE 08/31/2015 09/01/2015
MECH HOLD 08/31/2015 09/01/2015
Note: Previous comment shall be addressed. 1. Provide energy calculation and equipment sizing calculation based on FBCEC 5th ed. R 403.6.1/R405.4. 2. Provide hvac plan suitable for review, construction and inspection per FBC 5th ed. 107.2.1. F.N. Reodica-386-986-4734. Comments based on submitted documents dated 8-31-15. 1. Equipment sizing calculation as mentioned in item 1 above, is still missing. Also, submitted revised energy calculation shows attic insulation R-value different from plan/detail. Coordinate. 2. Item 2 above is still missing.
ZON HOLD 08/31/2015 09/01/2015
Note: REPEAT COMMENT: 1. Only concrete pads 50 square feet or less are allowed within the setback area. The proposed AC pad does not meet this criteria. T. Childs 986-2473
PLFM COMPLETE 08/31/2015 09/02/2015
BLD COMPLETE 08/25/2015 08/25/2015
ELEC HOLD 08/25/2015 08/25/2015
Note: Please provide panel location and/or disconnecting means that comply with NEC 2011 articles 422 part three and 440 part two.
ENGIN1 COMPLETE 08/25/2015 08/25/2015
Note: No swale plan required.
MECH HOLD 08/25/2015 08/25/2015
Note: 1. Provide energy calculation and equipment sizing calculation based on FBCEC 5th ed. R 403.6.1/R405.4. 2. Provide hvac plan suitable for review, construction and inspection per FBC 5th ed. 107.2.1. F.N. Reodica-386-986-4734.
PLUM COMPLETE 08/25/2015 08/25/2015
SW1 COMPLETE 08/25/2015 08/25/2015
UD1 COMPLETE 08/25/2015 08/26/2015
Note: See Notes
ZON HOLD 08/25/2015 08/26/2015
Note: 1. Only concrete pads 50 square feet or less are allowed within the setback area. The proposed AC pad does not meet this criteria. T. Childs 986-2473
PLFM HOLD 08/25/2015 08/27/2015
Note: 1. Revise elevation certificate section B8 to provide the higher risk zone only. Comments within Section D can describe which zone the house falls in X or AE or Both.
URB COMPLETE 08/25/2015 08/25/2015

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 07/27/2016
REVISION ¤40.00 07/27/2016
REVISION ¤40.00 07/27/2016
REVISION ¤40.00 07/27/2016
REINSPECTION FEE ¤40.00 07/27/2016
REINSPECTION FEE ¤40.00 07/27/2016
REINSPECTION FEE ¤40.00 07/27/2016
NEW RESIDENTIAL INSPECTIONS ¤798.00 09/10/2015
ADMIN FEE ¤20.00 09/10/2015
SITE PLAN 20 ¤20.00 09/10/2015
SURCHARGE FS 533.721 ¤28.14 09/10/2015
SURCHARGE - FS 468.631 ¤28.14 09/10/2015
STORM WATER PERMIT FEES ¤80.00 09/10/2015
3% TRANS IMPACT FEE CREDIT (¤91.51) 09/10/2015
ELECTRIC FEE ¤299.40 09/10/2015
3% FIRE IMPACT FEE CREDIT (¤6.38) 09/10/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤212.80 09/10/2015
IMPACT FEE PARKS ¤849.24 09/10/2015
IMPACT FEE SCHOOL ¤3,600.00 09/10/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 09/10/2015
MECHANICAL FEE ¤299.40 09/10/2015
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/10/2015
PLAN CHECK FEE ¤159.60 09/10/2015
PLUMBING FEE ¤299.40 09/10/2015
Fees Total Due: ¤0.00 Total Paid: ¤9,900.99