I want to search for...
Permit #2015080646
Permit Details
Status: COED
| Parcel Id: 15-11-31-2830-00000-0590 |
| CONDITIONED SPACE: 2831 sqft |
| GARAGE: 447 sqft |
| SCREEN PORCH (SOLID ROOF) : 657 sqft |
| OPENED PORCH (WITH ROOF) : 99 sqft |
| Total Square Footage: 4034 sqft |
| Block: 00000 |
| Subdivision: 1071 - FRONT STREET @ GRAND HAVEN PHASE 1 |
| Job Phone: (386) 446-5850 |
| Location Address: 51 FRONT ST |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/10/2015 |
| NOC: RECORDED |
| Applicant name: CHARLES DALLAS RINEK |
| Owner: FLANAGAN, JOHN F & JUDY G |
|
Address 76 COVINGTON LANE PALM COAST, FL 32137 |
| Lot: 0590 |
| Contracted Stated Job Value: ¤398,425.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CHARLES RINEK CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 352502 Palm Coast, FL 32137 |
CGC046080 (Exp: 08/31/2026) | (386) 446-5850 | (386)445-9992 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
PAUL S AIELLO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 351926 PALM COAST, FL 32137 |
CAC1815808 (Exp: 08/31/2016) | (386)239-0053 | (386)323-1955 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
BRANDON LEONARD LOSIK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4680 LAKE INDUSTRIAL BLVD CLEARMONT, FL 34714 |
CCC1330061 (Exp: 08/31/2024) | 352-459-7599 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 08/01/2016 | FINAL APPROVED | MBACON |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 07/29/2016 | Disapproved - NO FEE | MBACON |
| Note: Sewer cleanout at property line is not visible. Please make sure it is a flushmount cap at grade level | |||
| BLD - BUILDING FINAL | 07/28/2016 | FINAL APPROVED | LMILLER |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 07/27/2016 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. APPROVED | |||
| ROW FINAL | 07/27/2016 | APPROVED | RGROSS |
| Note: APPROVED | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/25/2016 | APPROVED | DREWIS |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 07/12/2016 | Disapproved -FEE REQUIRED | CTROHA |
| Note: CUT OUT SIDE WALK BACK 5' AND REPLACE (PATCH NOT ACCEPTABLE) SEE PHOTO | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 06/20/2016 | APPROVED - AS NOTED | GLALIMA |
| Note: SO YOU KNOW YOU ASK BEFOR YOU PATCH STREET GUTTERS. THANK YOU GARY LALIMA | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 06/14/2016 | PARTIALLY APPROVED | GLALIMA |
| Note: CONCRETE AND SIDEWALKS ONLY . CALL WHEN YOU GET PAVER BASE | |||
| U - SEWER TIE IN | 05/26/2016 | APPROVED | JNICHOLS |
| GRAVITY SEWER TEST | 05/25/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| GRAVITY SEWER TEST | 05/25/2016 | APPROVED | LMILLER |
| ELECTRIC - EARLY POWER | 05/02/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/2/2016 2:31:21 PM ELECTRIC REVISION DID NOT SHOW ADDED ELECTRIC SUB PANEL IN GARAGE OR ON RISER DIAGRAM, NEED REVISION BY FINAL, CALLED FPL SPOKE TO DELL RELEASED EARLY POWER 2:30 | |||
| LATH/BRICK/ WATER BARRIER | 02/16/2016 | APPROVED | DROCKWELL |
| INSULATION | 01/25/2016 | APPROVED | LMILLER |
| ALL ROUGH | 01/19/2016 | APPROVED - AS NOTED | LMILLER |
| Note: Inspection Resulted at 1/19/2016 3:32:16 PM OBTAIN APPROVED REVISION FOR ADDED ELECTRIC PRIOR TO FINAL | |||
| ELECTRIC-TUG | 12/22/2015 | APPROVED - AS NOTED | LMILLER |
| Note: CALLED FPL TRALKED TO SUSAN AND RELEASED TUG | |||
| ELECTRIC - EARLY POWER | 12/21/2015 | CANCELLED BY APPLICANT | LMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/07/2015 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 11/10/2015 | APPROVED | LMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 11/09/2015 | APPROVED | DREWIS |
| ELEV CERT-FOUNDATION APPROVAL | 11/06/2015 | APPROVED | CBENTLEY |
| MONOLITHIC SLAB | 10/21/2015 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION per contractor | |||
| MONOLITHIC SLAB | 10/20/2015 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 10/20/2015 11:40:33 AM NEED A FULL SET OF APPROVED PLANS ON FUTURE INSPECTIONS, NEED 4 #5``S EACH WAAY WHERE CIRCLED ON REVISIONS | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/16/2015 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/15/2015 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 10/15/2015 2:31:12 PM 10’ HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.4, AND OR FBC CHAPTER 25 SECTION P2503.5.1 BUILDING SEWER TESTING. TESTING WITH NOT LESS THAN 10-FOOT (3048MM) OF HEAD WATER AND BE ABLE TO MAINTAIN SUCH PRESSURE FOR 15 MINUTES. |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 08/02/2016 | 08/03/2016 |
| PLFM | COMPLETE | 07/26/2016 | 07/26/2016 |
| SW1 | COMPLETE | 07/25/2016 | 07/25/2016 |
| Note: Released By: DREWIS FINAL S | |||
| ELEC | COMPLETE | 05/10/2016 | 05/10/2016 |
| ELEC | COMPLETE | 02/10/2016 | 02/10/2016 |
| SW1 | COMPLETE | 11/06/2015 | 11/09/2015 |
| Note: Released By: DREWIS Foundation survey | |||
| PLFM | COMPLETE | 11/04/2015 | 11/06/2015 |
| BLD | COMPLETE | 10/16/2015 | 10/16/2015 |
| ZON | COMPLETE | 09/08/2015 | 09/09/2015 |
| MECH | COMPLETE | 09/03/2015 | 09/03/2015 |
| ZON | HOLD | 09/03/2015 | 09/03/2015 |
| Note: REPEAT COMMENT (2nd TIME) 1. Only concrete pads 50 square feet or less are allowed within the setback area. The proposed AC pad does not meet this criteria. The A/C pad on the site plan is 75.58 square feet. Provide revised site plan correcting this. T. Childs 986-2473 | |||
| ELEC | COMPLETE | 08/31/2015 | 09/01/2015 |
| MECH | HOLD | 08/31/2015 | 09/01/2015 |
| Note: Previous comment shall be addressed. 1. Provide energy calculation and equipment sizing calculation based on FBCEC 5th ed. R 403.6.1/R405.4. 2. Provide hvac plan suitable for review, construction and inspection per FBC 5th ed. 107.2.1. F.N. Reodica-386-986-4734. Comments based on submitted documents dated 8-31-15. 1. Equipment sizing calculation as mentioned in item 1 above, is still missing. Also, submitted revised energy calculation shows attic insulation R-value different from plan/detail. Coordinate. 2. Item 2 above is still missing. | |||
| ZON | HOLD | 08/31/2015 | 09/01/2015 |
| Note: REPEAT COMMENT: 1. Only concrete pads 50 square feet or less are allowed within the setback area. The proposed AC pad does not meet this criteria. T. Childs 986-2473 | |||
| PLFM | COMPLETE | 08/31/2015 | 09/02/2015 |
| BLD | COMPLETE | 08/25/2015 | 08/25/2015 |
| ELEC | HOLD | 08/25/2015 | 08/25/2015 |
| Note: Please provide panel location and/or disconnecting means that comply with NEC 2011 articles 422 part three and 440 part two. | |||
| ENGIN1 | COMPLETE | 08/25/2015 | 08/25/2015 |
| Note: No swale plan required. | |||
| MECH | HOLD | 08/25/2015 | 08/25/2015 |
| Note: 1. Provide energy calculation and equipment sizing calculation based on FBCEC 5th ed. R 403.6.1/R405.4. 2. Provide hvac plan suitable for review, construction and inspection per FBC 5th ed. 107.2.1. F.N. Reodica-386-986-4734. | |||
| PLUM | COMPLETE | 08/25/2015 | 08/25/2015 |
| SW1 | COMPLETE | 08/25/2015 | 08/25/2015 |
| UD1 | COMPLETE | 08/25/2015 | 08/26/2015 |
| Note: See Notes | |||
| ZON | HOLD | 08/25/2015 | 08/26/2015 |
| Note: 1. Only concrete pads 50 square feet or less are allowed within the setback area. The proposed AC pad does not meet this criteria. T. Childs 986-2473 | |||
| PLFM | HOLD | 08/25/2015 | 08/27/2015 |
| Note: 1. Revise elevation certificate section B8 to provide the higher risk zone only. Comments within Section D can describe which zone the house falls in X or AE or Both. | |||
| URB | COMPLETE | 08/25/2015 | 08/25/2015 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 07/27/2016 |
| REVISION | ¤40.00 | 07/27/2016 |
| REVISION | ¤40.00 | 07/27/2016 |
| REVISION | ¤40.00 | 07/27/2016 |
| REINSPECTION FEE | ¤40.00 | 07/27/2016 |
| REINSPECTION FEE | ¤40.00 | 07/27/2016 |
| REINSPECTION FEE | ¤40.00 | 07/27/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤798.00 | 09/10/2015 |
| ADMIN FEE | ¤20.00 | 09/10/2015 |
| SITE PLAN 20 | ¤20.00 | 09/10/2015 |
| SURCHARGE FS 533.721 | ¤28.14 | 09/10/2015 |
| SURCHARGE - FS 468.631 | ¤28.14 | 09/10/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/10/2015 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.51) | 09/10/2015 |
| ELECTRIC FEE | ¤299.40 | 09/10/2015 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 09/10/2015 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 09/10/2015 |
| IMPACT FEE PARKS | ¤849.24 | 09/10/2015 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/10/2015 |
| IMPACT FEE TRANSPORTATION | ¤3,050.24 | 09/10/2015 |
| MECHANICAL FEE | ¤299.40 | 09/10/2015 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/10/2015 |
| PLAN CHECK FEE | ¤159.60 | 09/10/2015 |
| PLUMBING FEE | ¤299.40 | 09/10/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,900.99 |