I want to search for...
Permit #2015090134
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7010-00230-0030 |
| Block: 00230 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-566-6533 |
| Location Address: 25 FELWOOD LN |
| Type: DR - DRIVEWAY |
| Issue Date: 09/16/2015 |
| NOC: Unknown |
| Applicant name: MARCOS SANTOS |
| Owner: TAVARES, FILIPE JOSE & MARIA MARQUES TAVARES H&W |
|
Address 25 FELWOOD LANE PALM COAST, FL 32137 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤2,200.00 |
| Job Description: ADD CONCRETE CIRCULAR DRIVEWAY- 14 FT WIDE |
| Type: CN |
Contractor
MARCOS CONCRETE DESIGN, INC
| Status | Location Address | Phone |
| INACTIVE |
5948 BROKEN BOW LANE PORT ORANGE, FL 32127 |
386-566-6533 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 11/13/2015 | FINAL APPROVED | MBACON |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 11/10/2015 | APPROVED | RGROSS |
| STORMWATER FINAL | 11/10/2015 | APPROVED | RGROSS |
| ROW DAMAGE | 11/10/2015 | APPROVED | RGROSS |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 10/08/2015 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION Noted that the pipe was intalled to the 8 ft from road edge code so that the utility pipe next to it, when replaced, will match this one. | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 10/07/2015 | Disapproved -FEE REQUIRED | CTROHA |
| Note: THIS IS A REINSPECTION CULVERT PIPE MUST BE 8' FROM EDGE OF ROAD SEE SWALE SHEET FLARES MUST BE 36" MINIMUM CULVERT PIPE CANNOT BE HIGHER THAN SWALE SHEET ELEVATIONS AT TOP OF RIB CHECK YOUR PIPE ELEVATIONS | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 09/25/2015 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Must get an updated survey showing total area to be poured. Must reset pipe. Out of Tolerence. See Swale detail. |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 09/28/2015 | 09/30/2015 |
| SW1 | COMPLETE | 09/28/2015 | 09/28/2015 |
| ZON | COMPLETE | 09/28/2015 | 09/29/2015 |
| ENGIN1 | COMPLETE | 09/08/2015 | 09/14/2015 |
| SW1 | COMPLETE | 09/08/2015 | 09/08/2015 |
| UD1 | COMPLETE | 09/08/2015 | 09/10/2015 |
| Note: See comment in general notes Danny Spencer 386-386-2640 | |||
| ZON | COMPLETE | 09/08/2015 | 09/09/2015 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/12/2015 |
| REINSPECTION FEE | ¤40.00 | 11/12/2015 |
| REVISION | ¤40.00 | 11/12/2015 |
| SITE PLAN 20 | ¤20.00 | 09/16/2015 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/16/2015 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/16/2015 |
| STORM WATER PERMIT FEES | ¤40.00 | 09/16/2015 |
| ADMIN FEE | ¤20.00 | 09/16/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤204.00 |