Permit #2015090296
Permit Details
Status: COED
| Parcel Id: 05-11-31-5918-00000-0110 |
| CONDITIONED SPACE: 3709 sqft |
| GARAGE: 934 sqft |
| OPENED PORCH (WITH ROOF) : 630 sqft |
| OPENED PORCH (WITH ROOF) : 488 sqft |
| OPENED PORCH (WITH ROOF) : 200 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| Total Square Footage: 6061 sqft |
| Block: 00000 |
| Subdivision: 2244 - VILLAGE AT PALM COAST PH 1 |
| Job Phone: (386) 445-7001 |
| Location Address: 18 LONGVIEW WAY N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/02/2015 |
| NOC: RECORDED |
| Applicant name: RICHARD M. ANDERSON |
| Owner: ANDERSON THOMAS R |
|
Address 18 LONGVIEW WAY NORTH PALM COAST, FL 32137 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
PALM WEST HOME BUILDERS, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 Florida Park Drive North Palm Coast, FL 32137 |
CRC054633 (Exp: 08/31/2026) | (386) 445-7001 | (386)446-5941 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32136 |
CAC048127 (Exp: 08/31/2018) | 386-445-5023 | 386-446-4614 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
JOANNA S REELEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2 MARKET PLACE D PALM COAST, FL 32137 |
CCC1327485 (Exp: 08/31/2020) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 06/28/2017 | APPROVED | CTROHA |
| Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION | |||
| ROW FINAL | 06/28/2017 | APPROVED - AS NOTED | CTROHA |
| Note: SEED AND STRAW DOWN BOTH SIDES OF THE PROPERTY ALL BARE GROUND ON ADJACENT LOTS PICK UP ALL TRASH ON ADJACENT LOTS THIS WILL BE DONE BY 2:30 ON 6/29/2017 THIS IS AN EXCEPTION SO THAT THE CLOSING IS NOT HELD UP | |||
| U -UTILITY RESIDENTIAL FINAL | 06/28/2017 | FINAL APPROVED | JNICHOLS |
| BLD - BUILDING FINAL | 06/27/2017 | FINAL APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 06/23/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION. DISCONNECT BEHIND CONDENSING UNIT NEEDS TO HAVE A WORKING CLEARANCE OF 36" PER NEC 110.26 A1..OPENINGS AND PENETRATIONS THROUGH WALLS OR CEILINGS SEPARATING THE DWELLING UNIT FROM THE GARAGE SHALL NOT BE PERMITTED fbc. R302.5.. Required outlets and spacing of outlets. NEC 2008 210.52 in kitchen. need to close electric boses under stove. label breaker in meter panel.. remove debris from both sides of adjacent lots | |||
| BLD - BUILDING FINAL | 06/22/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: not ready | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/19/2017 | APPROVED | JHINDMAN |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/30/2017 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS AN INSPECTION FOR A REVISION IN DOWNSTAIRS LEFT BATHROOM CHANGING A SHOWER TO A TUB | |||
| U - SEWER TIE IN | 04/21/2017 | APPROVED | JNICHOLS |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 04/20/2017 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS INSPECTION WAS ALREADY APPROVED ON MARCH 13 BY LEE MILLER | |||
| U - SEWER TIE IN | 03/31/2017 | PARTIALLY APPROVED | JNICHOLS |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 03/31/2017 | APPROVED | CTROHA |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| GRAVITY SEWER TEST | 03/13/2017 | APPROVED | LMILLER |
| ELECTRIC - EARLY POWER | 01/18/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 2:20 | |||
| INSULATION | 08/18/2016 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 07/26/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 07/25/2016 | CANCELLED BY APPLICANT | CMINI |
| Note: THIS IS A REINSPECTION. Richie from Palm West called to cancel | |||
| ALL ROUGH | 06/07/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 05/17/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/17/2016 1:32:44 PM UNGROUNDED CONDUCTORS USED AS HOT SHALL BE PHASED OUT..210.5(C).... UNDERGROUND WIRE INSTALLATIONS... FBC 3803,10 WET LOCATIONS, UNDERGROUND CONDUCTORS MUST LISTED FOR USE IN WET LOCATIONS... NAIL PLATES M1308.2 PROTECTION FROM PHYSICAL DAMAGE… IF PIPE IS LESS THAN 1.5†FROM EDGE IT MUST BE PROTECTED WITH A MINIMUM OF 16 GAGE STEEL PLATE AND PLATE MUST EXTEND A MINIMUM OF 2†ABOVE THE SOLE PLATES AND BELOW THE TOP PLATES... NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. AND SHALL EXTEND NO LESS THAN 2 INCHES ABOVE SOLE PLATES AND BELOW TOP PLATES... NAIL PLATES ON ELECTRIC FBC E3802.1 THROUGHOUT.... 1 1/4 FROM EDGE, WHERE WIRING IS RUNS ALONG ADGE OF WOOD FBC E3802.1 WIRING SHALL NOT BE LESS THAN 1.25 INCHES AWAY FROM WOOD MEMBER OR SHALL BE PROTECTED BY A LISTED STEEL PLATE.... NEED TO OBTAIN A REVISION FOR MECHANICAL (NOT AS SHOWN IN APPROVED DOCUMENTS)... GROUNDING INSULATORS MUST BE GREEN, FBC E 3407 | |||
| WINDOW NAILING | 04/27/2016 | APPROVED | CMINI |
| ALL ROUGH | 04/22/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 4/22/2016 2:53:12 PM NOT READY, INCOMPLETE INSPECTION! (WINDOW NAILING,, PLUMBING, ELECTRICAL. (NOTHING READY) | |||
| LATH/BRICK/ WATER BARRIER | 04/07/2016 | Disapproved - NO FEE | CMINI |
| Note: only small gables at front top ready, partial. need to call in when rest is ready | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/29/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/21/2016 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/21/2016 3:11:57 PM NEED REVISIONS OR CORRECT IN FIELD, TRUSS CONNECTIONS PER PLAN, PLAN CALLING FOR MTS20S- MTS16 INSTALLED, 3-2X12 HEADER VERSES 2- 2X12 INSTALLED, CONTINUOUS LOAD PATH ON 2ND FL PORCH HEADER USING H2.5S ON 2X4 NOT ATTACHED TO HEADER,FLOOR TRUSSES NOT MATCHING PAPER WORK. NEED TO FINISH WALL SHEATHING, | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/18/2016 | CANCELLED BY APPLICANT | LMILLER |
| ELECTRIC-TUG | 02/22/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION ok per Robert Inspection Resulted at 2/22/2016 1:50:12 PM SPOKE TO SUSAN FPL RELEASED TUG 1:49 | |||
| ELECTRIC-TUG | 02/12/2016 | Disapproved - NO FEE | RMARTIN |
| Note: Inspection Resulted at 2/12/2016 1:20:57 PM NEED REVISION ON SITE FOR INSPECTION,SHOWING CHANGES OF SERVICE SIZE AND CONDUIT | |||
| TIE BEAM / LINTEL | 01/25/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 01/22/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 1/22/2016 11:30:47 AM VERTICAL REBAR NEEDS TO HAVE ½†FOR MAXIMUM COVER..FBC606.9.4 OVERBEND DOWEL BAR FBC R606.13.3 EXCEPTION….. WITH A VERTICAL CELL NOT MORE THAN 1†OF HORIZONTAL DISPLACEMENT TO 6†OF VERTICAL BAR LENGTH. (MARKED ON FOUNDATION PLAN) | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/21/2016 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 01/07/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 01/06/2016 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 1/6/2016 9:58:39 AM NOT READY, JOB NEEDS TO BE READY WHEN CALLED IN. F.B.C. 105.1 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/29/2015 | APPROVED | CMINI |
| STEM WALL FOUNDATION | 12/17/2015 | APPROVED | LMILLER |
| STEM WALL FOUNDATION | 12/07/2015 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 06/16/2017 | 06/19/2017 |
| Note: Released By: JHINDMAN final s | |||
| PLUM | COMPLETE | 05/09/2017 | 05/10/2017 |
| Note: Revision: chaged first floor suite-1 bathroom shower to tub. | |||
| MECH | COMPLETE | 05/25/2016 | 05/27/2016 |
| Note: revision- changed duct layout at the second floor. | |||
| BLD | COMPLETE | 05/11/2016 | 05/12/2016 |
| ELEC | COMPLETE | 05/11/2016 | 05/12/2016 |
| BLD | COMPLETE | 03/23/2016 | 03/28/2016 |
| ELEC | COMPLETE | 02/16/2016 | 02/18/2016 |
| SW1 | COMPLETE | 01/20/2016 | 01/21/2016 |
| Note: Released By: JHINDMAN foundation s | |||
| BLD | COMPLETE | 12/09/2015 | 12/15/2015 |
| ELEC | COMPLETE | 09/23/2015 | 09/24/2015 |
| ZON | COMPLETE | 09/23/2015 | 09/24/2015 |
| PLUM | COMPLETE | 09/23/2015 | 09/24/2015 |
| BLD | COMPLETE | 09/23/2015 | 09/24/2015 |
| BLD | HOLD | 09/14/2015 | 09/15/2015 |
| Note: 1. Provide the roof truss layout from the truss engineer. 5th ed. FBC 107.2.1. | |||
| ELEC | HOLD | 09/14/2015 | 09/14/2015 |
| Note: Please update to current National Electric Code. -DC. Rewis 9864736 | |||
| ENGIN1 | COMPLETE | 09/14/2015 | 09/16/2015 |
| MECH | COMPLETE | 09/14/2015 | 09/15/2015 |
| PLUM | HOLD | 09/14/2015 | 09/15/2015 |
| Note: 1. Provide second floor plumbing riser. 5th ed FBC 107.2.1. | |||
| SW1 | COMPLETE | 09/14/2015 | 09/14/2015 |
| UD1 | COMPLETE | 09/14/2015 | 09/18/2015 |
| Note: see notes | |||
| ZON | HOLD | 09/14/2015 | 09/15/2015 |
| Note: 1. The survey is incorrect. Tract 11 is not platted and is not part of Lot 11. Tract 11 must be removed from this residential permit application. 2. Site plan must be submitted on 8 1/2 x 11 or 8 1/2 x 14 paper and must include the following; width of Intracoastal Waterway Westerly Right of Way, dimensions of proposed structure and setbacks to closest point from structure to property line - include concrete door pads and A/C equipment with their dimensions; driveway material must be depicted - if paver driveway is to be installed, a Right of Way Utilization Agreement must be received and must be signed by all persons on deed to property. 3. Provide landscape plan on 8 1/2 x 11 or 8 1/2 x 14 paper. Remove Tract 11 from landscape plan. No landscape or tree removal is allowed as per #1 above. | |||
| URB | COMPLETE | 09/14/2015 | 09/16/2015 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/27/2017 |
| REINSPECTION FEE | ¤40.00 | 06/27/2017 |
| REINSPECTION FEE | ¤40.00 | 06/16/2017 |
| REINSPECTION FEE | ¤40.00 | 06/16/2017 |
| REINSPECTION FEE | ¤40.00 | 06/16/2017 |
| REINSPECTION FEE | ¤40.00 | 06/16/2017 |
| REINSPECTION FEE | ¤40.00 | 06/16/2017 |
| REVISION | ¤40.00 | 06/16/2017 |
| REVISION | ¤40.00 | 06/16/2017 |
| REVISION | ¤40.00 | 06/16/2017 |
| REVISION | ¤40.00 | 06/16/2017 |
| REVISION | ¤40.00 | 06/16/2017 |
| SITE PLAN 20 | ¤20.00 | 11/02/2015 |
| SURCHARGE FS 533.721 | ¤35.00 | 11/02/2015 |
| SURCHARGE - FS 468.631 | ¤35.00 | 11/02/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/02/2015 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.51) | 11/02/2015 |
| ADMIN FEE | ¤20.00 | 11/02/2015 |
| ELECTRIC FEE | ¤364.80 | 11/02/2015 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 11/02/2015 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 11/02/2015 |
| IMPACT FEE PARKS | ¤849.24 | 11/02/2015 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/02/2015 |
| IMPACT FEE TRANSPORTATION | ¤3,050.24 | 11/02/2015 |
| MECHANICAL FEE | ¤364.80 | 11/02/2015 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 11/02/2015 |
| PLAN CHECK FEE | ¤203.20 | 11/02/2015 |
| PLUMBING FEE | ¤364.80 | 11/02/2015 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,016.00 | 11/02/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,572.51 |