Permit #2015100282

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1810
CONDITIONED SPACE: 2586 sqft
GARAGE: 445 sqft
OPENED PORCH (WITH ROOF) : 391 sqft
OPENED PORCH (WITH ROOF) : 76 sqft
Total Square Footage: 3498 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: (386) 446-5850
Location Address: 419 BOURGANVILLE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/16/2015
NOC: RECORDED
Applicant name: CHARLES DALLAS RINEK
Owner: HAUSE, DAVID & MELINDA

Address

31 EASTWOOD DRIVE

PALM COAST, FL 32164

Lot: 1810
Contracted Stated Job Value: ¤302,501.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

CHARLES RINEK CONSTRUCTION, INC.
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 352502

Palm Coast, FL 32137

CGC046080 (Exp: 08/31/2026) (386) 446-5850 (386)445-9992

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
BRANDON LEONARD LOSIK
Status Location Address State License Number Phone
INACTIVE

4680 LAKE INDUSTRIAL BLVD

CLEARMONT, FL 34714

CCC1330061 (Exp: 08/31/2024) 352-459-7599
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 07/18/2016 FINAL APPROVED MBACON
BLD - BUILDING FINAL 07/15/2016 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
GAS ROUGH 07/15/2016 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
GAS FINAL 07/15/2016 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
GAS FINAL 07/14/2016 Disapproved - NO FEE JCOLASANTI
Note: need to pass rough before gas final can be resulted
GAS ROUGH 07/14/2016 Disapproved -FEE REQUIRED JCOLASANTI
Note: per contractorTEST PRESSURE NEEDED ON PIPE END OF PIPE FBC.G2417.3.3
BLD - BUILDING FINAL 07/14/2016 CANCELLED BY APPLICANT JCOLASANTI
ROW FINAL 07/14/2016 APPROVED CTROHA
FINAL SURVEY (OFFICE USE ONLY) 07/13/2016 APPROVED DREWIS
FINAL APRON (AFTER POUR/DRIVEWAY) 07/12/2016 APPROVED - AS NOTED RGROSS
Note: MIAMI GUTTER WHERE PARTIAL REPAIR WAS MADE WILL NEED PULLED AND REPLACED BEFORE FINAL ROW
PRE-APRON (PRE-POUR/DRIVEWAY) 06/24/2016 APPROVED - AS NOTED RGROSS
Note: PAVER DRIVEDWAY. FINAL APRON MUST HAVE 36 INCH FLARES. 5 FT OF DAMAGED MIAMI GUTTER MUST BE REMOVED AND REPLACED BEFORE FINAL ROW. UTILITY METER BOX NEEDS TO BE MOVED A MINIMUM OF 3 FEET FROM PAVER DRIVEWAY BEFORE FINAL UTILITY INSPECTION. READY FOR PAVERS.
PRE-APRON (PRE-POUR/DRIVEWAY) 06/20/2016 PARTIALLY APPROVED RGROSS
Note: APPROVED FOR APRON POUR ONLY. PAVER DRIVEWAY. ON SITE WITH SUPER.
ELECTRIC - EARLY POWER 06/08/2016 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 6/8/2016 2:48:59 PM SPOKE TO DELL FPL RELEASED EARLY POWER 3:00
GRAVITY SEWER TEST 06/03/2016 APPROVED JCOLASANTI
U - SEWER TIE IN 06/03/2016 APPROVED MBACON
LATH/BRICK/ WATER BARRIER 03/14/2016 APPROVED JCOLASANTI
INSULATION 02/29/2016 APPROVED JCOLASANTI
ALL ROUGH 02/23/2016 APPROVED JCOLASANTI
Note: PER CONTRACTOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/04/2016 APPROVED JCOLASANTI
ELECTRIC - EARLY POWER 12/21/2015 CANCELLED BY APPLICANT RMARTIN
ELECTRIC-TUG 12/21/2015 APPROVED - AS NOTED RMARTIN
Note: CALLED FPL SPOKE TO DELL RELEASED TUG 2:15
TIE BEAM / LINTEL 12/07/2015 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 11/18/2015 APPROVED DREWIS
MONOLITHIC SLAB 11/10/2015 APPROVED JCOLASANTI
PLUMBING 1ST ROUGH UNDERGROUND 11/06/2015 APPROVED JCOLASANTI

Review History

Department Status Date In Date Out
SW1 COMPLETE 07/13/2016 07/13/2016
Note: Released By: DREWIS
SW1 HOLD 07/11/2016 07/12/2016
Note: Held By: DREWIS There is not even flow on north side of residence and does not match proposed survey flow. -DC. Rewis 986-4736
ZON COMPLETE 02/18/2016 02/22/2016
PLUM COMPLETE 02/18/2016 02/22/2016
Note: Revision - added A/G gas tank, 30 # and piping to fireplace and grill.
PLUM HOLD 02/12/2016 02/16/2016
Note: Provide signature and license number of gas contractor on gas riser diagram per FBC 5th edition 107.2.1. Also, gas riser does not match with gas layout on site plan. Coordinate and submit correction. F.N.Reodica-386-986-4734.
ZON HOLD 02/12/2016 02/16/2016
Note: Site plan must depict type (A/G or U/G) size (gal), location and setbacks of proposed LP Tank.
BLD COMPLETE 11/19/2015 11/23/2015
SW1 COMPLETE 11/18/2015 11/18/2015
Note: Released By: DREWIS FOUNDATION S
ELEC COMPLETE 10/15/2015 10/16/2015
BLD COMPLETE 10/09/2015 10/12/2015
ELEC HOLD 10/09/2015 10/12/2015
Note: Please show current NEC reference. Please provide receptacles in study per NEC 2011 Article 210.52 A and in bedrooms 2 & 3 per NEC 2011 Article 210.52 A(2). -DC. Rewis 986-4736
ENGIN1 COMPLETE 10/09/2015 10/13/2015
MECH COMPLETE 10/09/2015 10/12/2015
PLUM COMPLETE 10/09/2015 10/12/2015
SW1 COMPLETE 10/09/2015 10/12/2015
UD1 COMPLETE 10/09/2015 10/12/2015
Note: see notes
ZON COMPLETE 10/09/2015 10/13/2015
URB COMPLETE 10/09/2015 10/12/2015

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/18/2016
REVISION ¤40.00 07/13/2016
REVISION ¤40.00 07/13/2016
CONTRACTOR CHANGE ¤40.00 07/13/2016
ELECTRIC FEE ¤254.40 10/16/2015
3% FIRE IMPACT FEE CREDIT (¤6.38) 10/16/2015
IMPACT FEE FIRE NONRESIDENTIAL ¤212.80 10/16/2015
IMPACT FEE PARKS ¤849.24 10/16/2015
IMPACT FEE SCHOOL ¤3,600.00 10/16/2015
IMPACT FEE TRANSPORTATION ¤3,050.24 10/16/2015
MECHANICAL FEE ¤254.40 10/16/2015
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/16/2015
PLAN CHECK FEE ¤129.60 10/16/2015
PLUMBING FEE ¤254.40 10/16/2015
SITE PLAN 20 ¤20.00 10/16/2015
SURCHARGE FS 533.721 ¤23.41 10/16/2015
SURCHARGE - FS 468.631 ¤23.41 10/16/2015
STORM WATER PERMIT FEES ¤80.00 10/16/2015
3% TRANS IMPACT FEE CREDIT (¤91.51) 10/16/2015
NEW RESIDENTIAL INSPECTIONS ¤648.00 10/16/2015
ADMIN FEE ¤20.00 10/16/2015
Fees Total Due: ¤0.00 Total Paid: ¤9,456.53