Permit #2015100282
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-1810 |
| CONDITIONED SPACE: 2586 sqft |
| GARAGE: 445 sqft |
| OPENED PORCH (WITH ROOF) : 391 sqft |
| OPENED PORCH (WITH ROOF) : 76 sqft |
| Total Square Footage: 3498 sqft |
| Block: 00000 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: (386) 446-5850 |
| Location Address: 419 BOURGANVILLE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/16/2015 |
| NOC: RECORDED |
| Applicant name: CHARLES DALLAS RINEK |
| Owner: HAUSE, DAVID & MELINDA |
|
Address 31 EASTWOOD DRIVE PALM COAST, FL 32164 |
| Lot: 1810 |
| Contracted Stated Job Value: ¤302,501.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CHARLES RINEK CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 352502 Palm Coast, FL 32137 |
CGC046080 (Exp: 08/31/2026) | (386) 446-5850 | (386)445-9992 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
BRANDON LEONARD LOSIK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4680 LAKE INDUSTRIAL BLVD CLEARMONT, FL 34714 |
CCC1330061 (Exp: 08/31/2024) | 352-459-7599 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 07/18/2016 | FINAL APPROVED | MBACON |
| BLD - BUILDING FINAL | 07/15/2016 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| GAS ROUGH | 07/15/2016 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 07/15/2016 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 07/14/2016 | Disapproved - NO FEE | JCOLASANTI |
| Note: need to pass rough before gas final can be resulted | |||
| GAS ROUGH | 07/14/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: per contractorTEST PRESSURE NEEDED ON PIPE END OF PIPE FBC.G2417.3.3 | |||
| BLD - BUILDING FINAL | 07/14/2016 | CANCELLED BY APPLICANT | JCOLASANTI |
| ROW FINAL | 07/14/2016 | APPROVED | CTROHA |
| FINAL SURVEY (OFFICE USE ONLY) | 07/13/2016 | APPROVED | DREWIS |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 07/12/2016 | APPROVED - AS NOTED | RGROSS |
| Note: MIAMI GUTTER WHERE PARTIAL REPAIR WAS MADE WILL NEED PULLED AND REPLACED BEFORE FINAL ROW | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 06/24/2016 | APPROVED - AS NOTED | RGROSS |
| Note: PAVER DRIVEDWAY. FINAL APRON MUST HAVE 36 INCH FLARES. 5 FT OF DAMAGED MIAMI GUTTER MUST BE REMOVED AND REPLACED BEFORE FINAL ROW. UTILITY METER BOX NEEDS TO BE MOVED A MINIMUM OF 3 FEET FROM PAVER DRIVEWAY BEFORE FINAL UTILITY INSPECTION. READY FOR PAVERS. | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 06/20/2016 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR APRON POUR ONLY. PAVER DRIVEWAY. ON SITE WITH SUPER. | |||
| ELECTRIC - EARLY POWER | 06/08/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/8/2016 2:48:59 PM SPOKE TO DELL FPL RELEASED EARLY POWER 3:00 | |||
| GRAVITY SEWER TEST | 06/03/2016 | APPROVED | JCOLASANTI |
| U - SEWER TIE IN | 06/03/2016 | APPROVED | MBACON |
| LATH/BRICK/ WATER BARRIER | 03/14/2016 | APPROVED | JCOLASANTI |
| INSULATION | 02/29/2016 | APPROVED | JCOLASANTI |
| ALL ROUGH | 02/23/2016 | APPROVED | JCOLASANTI |
| Note: PER CONTRACTOR | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/04/2016 | APPROVED | JCOLASANTI |
| ELECTRIC - EARLY POWER | 12/21/2015 | CANCELLED BY APPLICANT | RMARTIN |
| ELECTRIC-TUG | 12/21/2015 | APPROVED - AS NOTED | RMARTIN |
| Note: CALLED FPL SPOKE TO DELL RELEASED TUG 2:15 | |||
| TIE BEAM / LINTEL | 12/07/2015 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 11/18/2015 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 11/10/2015 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/06/2015 | APPROVED | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/13/2016 | 07/13/2016 |
| Note: Released By: DREWIS | |||
| SW1 | HOLD | 07/11/2016 | 07/12/2016 |
| Note: Held By: DREWIS There is not even flow on north side of residence and does not match proposed survey flow. -DC. Rewis 986-4736 | |||
| ZON | COMPLETE | 02/18/2016 | 02/22/2016 |
| PLUM | COMPLETE | 02/18/2016 | 02/22/2016 |
| Note: Revision - added A/G gas tank, 30 # and piping to fireplace and grill. | |||
| PLUM | HOLD | 02/12/2016 | 02/16/2016 |
| Note: Provide signature and license number of gas contractor on gas riser diagram per FBC 5th edition 107.2.1. Also, gas riser does not match with gas layout on site plan. Coordinate and submit correction. F.N.Reodica-386-986-4734. | |||
| ZON | HOLD | 02/12/2016 | 02/16/2016 |
| Note: Site plan must depict type (A/G or U/G) size (gal), location and setbacks of proposed LP Tank. | |||
| BLD | COMPLETE | 11/19/2015 | 11/23/2015 |
| SW1 | COMPLETE | 11/18/2015 | 11/18/2015 |
| Note: Released By: DREWIS FOUNDATION S | |||
| ELEC | COMPLETE | 10/15/2015 | 10/16/2015 |
| BLD | COMPLETE | 10/09/2015 | 10/12/2015 |
| ELEC | HOLD | 10/09/2015 | 10/12/2015 |
| Note: Please show current NEC reference. Please provide receptacles in study per NEC 2011 Article 210.52 A and in bedrooms 2 & 3 per NEC 2011 Article 210.52 A(2). -DC. Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 10/09/2015 | 10/13/2015 |
| MECH | COMPLETE | 10/09/2015 | 10/12/2015 |
| PLUM | COMPLETE | 10/09/2015 | 10/12/2015 |
| SW1 | COMPLETE | 10/09/2015 | 10/12/2015 |
| UD1 | COMPLETE | 10/09/2015 | 10/12/2015 |
| Note: see notes | |||
| ZON | COMPLETE | 10/09/2015 | 10/13/2015 |
| URB | COMPLETE | 10/09/2015 | 10/12/2015 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/18/2016 |
| REVISION | ¤40.00 | 07/13/2016 |
| REVISION | ¤40.00 | 07/13/2016 |
| CONTRACTOR CHANGE | ¤40.00 | 07/13/2016 |
| ELECTRIC FEE | ¤254.40 | 10/16/2015 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 10/16/2015 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 10/16/2015 |
| IMPACT FEE PARKS | ¤849.24 | 10/16/2015 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/16/2015 |
| IMPACT FEE TRANSPORTATION | ¤3,050.24 | 10/16/2015 |
| MECHANICAL FEE | ¤254.40 | 10/16/2015 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/16/2015 |
| PLAN CHECK FEE | ¤129.60 | 10/16/2015 |
| PLUMBING FEE | ¤254.40 | 10/16/2015 |
| SITE PLAN 20 | ¤20.00 | 10/16/2015 |
| SURCHARGE FS 533.721 | ¤23.41 | 10/16/2015 |
| SURCHARGE - FS 468.631 | ¤23.41 | 10/16/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/16/2015 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.51) | 10/16/2015 |
| NEW RESIDENTIAL INSPECTIONS | ¤648.00 | 10/16/2015 |
| ADMIN FEE | ¤20.00 | 10/16/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,456.53 |