I want to search for...
Permit #2015120259
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-2420 |
| CONDITIONED SPACE: 2002 sqft |
| GARAGE: 469 sqft |
| OPENED PORCH (WITH ROOF) : 39 sqft |
| OPENED PORCH (WITH ROOF) : 254 sqft |
| Total Square Footage: 2764 sqft |
| Block: 00000 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: (386)383-0376 |
| Location Address: 149 ASPEN WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/06/2016 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: TUBESING, GORDON EARL |
|
Address LIVING TRUST SEQUIM, WA 98382 |
|
Address 31 FLIGHT ALLEY SEQUIM, WA 98382 |
| Lot: 242 |
| Contracted Stated Job Value: ¤313,900.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
BENJAMIN EDWARD SMITH
| Status | Location Address | State License Number | Phone |
| CANCEL |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13004288 (Exp: 08/31/2016) | 386-265-2687 |
PAUL S AIELLO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 351926 PALM COAST, FL 32137 |
CAC1815808 (Exp: 08/31/2016) | (386)239-0053 | (386)323-1955 |
JOHN BRADLEY WINFREY JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1685 S. CLARA AVE Deland, FL 32720 |
CFC054901 (Exp: 08/31/2026) | 386-734-0154 | 386-734-2751 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 09/16/2016 | FINAL APPROVED | DSPENCER |
| BLD - BUILDING FINAL | 09/15/2016 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 09/14/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: NEED TO HAVE ARC SHIELDS WHERE THERE IS MORE THAN 1/4" SPACE AT COMBUSTABLES CHECK ALL OUTLETS..NEC 314.20 | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 09/13/2016 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. SURVEY ON SITE. APPROVED FOR APRON FINAL. | |||
| ROW FINAL | 09/13/2016 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. SURVEY DOCS ON SITE. ONE ROW INSPECTION WAS DELETED BY INSPECTOR (ROBERT) BECAUSE THE ROW WAS ENTERED AS A FAIL AND REGENERATED ANOTHER ROW. HOWEVER, THE ROW WAS THEN PASSED AS-NOTED AFTER CLARIFICATION OF IRRIGATION RULES IN THIS SUB-DIVISION. | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 09/09/2016 | Disapproved -FEE REQUIRED | CTROHA |
| Note: MISSING DOCUMENTS: FINAL SURVEY | |||
| ROW FINAL | 09/09/2016 | Disapproved - NO FEE | CTROHA |
| Note: THIS IS A REINSPECTION MISSING DOCUMENTS: | |||
| FINAL SURVEY (OFFICE USE ONLY) | 09/08/2016 | APPROVED | DREWIS |
| ROW FINAL | 08/31/2016 | Disapproved -FEE REQUIRED | CTROHA |
| Note: GENERAL CLEANUP: PICK UP ALL TRASH AND CONSTRUCTION DEBRIS ON ADJACENT LOTS SWEEP OFF GUTTER AND DRIVEWAY | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 08/31/2016 | APPROVED - AS NOTED | CTROHA |
| Note: THIS IS A REINSPECTION MIAMI GUTTER AND CURB ADJUSTMENT COMPLETE NEED APPROVED FINAL SURVEY AT FINAL INSPECTION NEED BRASS CAP FOR CLEAN OUT IN DRIVEWAY BEFORE UTILITY INSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/23/2016 | APPROVED | DREWIS |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 06/29/2016 | PARTIALLY APPROVED | CTROHA |
| Note: ISSUE WITH THE DRIVEWAY ENDING AT STORM DRAIN OK FOR PAVERS EXCEPT THIS AREA | |||
| ELECTRIC - EARLY POWER | 06/14/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: Inspection Resulted at 6/14/2016 2:12:39 PM SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:00 | |||
| U - SEWER TIE IN | 05/09/2016 | APPROVED | JNICHOLS |
| GRAVITY SEWER TEST | 04/15/2016 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 04/01/2016 | APPROVED | JCOLASANTI |
| INSULATION | 04/01/2016 | APPROVED | JCOLASANTI |
| ALL ROUGH | 03/09/2016 | APPROVED | CMINI |
| ELECTRIC-TUG | 03/08/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/8/2016 1:49:22 PM SPOKE TO SUSAN FPL RELEASED TUG 1:48 | |||
| ELECTRIC-TUG | 03/07/2016 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: Inspection Resulted at 3/7/2016 11:03:05 AM GFCI NOT INSTALLED UNDER PANEL JUST WIRE IN WEATHERPROOF, NEED TO BE SAFED OFF AND UFERGROUND NOT CONNECTED PROPERLY(LOOSE) PULLED OUT NEED TO CORRECT | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/19/2016 | APPROVED - AS NOTED | JCOLASANTI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 2/19/2016 3:57:17 PM NEED TO LOOK AT FRONT ENTRY DOES NOT MATCH DETAIL, CORNER STRAP OVERBENT......NEED TO REVISE TRUSS ENGINEERING AT REAR DINNING AREA. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/15/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 2/15/2016 3:49:41 PM NEED TO COMPLETE FRAMING AT ROOF PER PLAN DETAILS, WILL COMPLETE INSPECTION WHEN THIS IS COMPLETE. | |||
| TIE BEAM / LINTEL | 01/25/2016 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 01/22/2016 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 01/11/2016 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 01/08/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 1/8/2016 3:16:47 PM 4 #5 LOCATED AT RIGHT OF HOUSE PLANS CALL TO BE CONTINUOS. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/07/2016 | APPROVED | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/07/2016 | 09/08/2016 |
| Note: Released By: DREWIS FINAL S | |||
| SW1 | COMPLETE | 08/22/2016 | 08/23/2016 |
| Note: Released By: DREWIS final s | |||
| BLD | COMPLETE | 03/02/2016 | 03/04/2016 |
| SW1 | COMPLETE | 01/20/2016 | 01/22/2016 |
| Note: Released By: DREWIS foundation suvery | |||
| ZON | COMPLETE | 01/04/2016 | 01/05/2016 |
| MECH | COMPLETE | 12/22/2015 | 12/28/2015 |
| BLD | COMPLETE | 12/22/2015 | 12/23/2015 |
| ZON | HOLD | 12/22/2015 | 12/23/2015 |
| Note: REPEAT COMMENT: Provide the correct flood panel number for the Boundary Survey and site plan. | |||
| BLD | HOLD | 12/10/2015 | 12/11/2015 |
| Note: 1. Provide updated code references on code criteria per FBC 5th edition (2014). 2. Provide information of underlayment to be used on Roofing Worksheet per FBC 5th ed. 107.2.1. F.N. Reodica - 386-986-4734. | |||
| ELEC | COMPLETE | 12/10/2015 | 12/10/2015 |
| ENGIN1 | COMPLETE | 12/10/2015 | 12/10/2015 |
| MECH | HOLD | 12/10/2015 | 12/11/2015 |
| Note: 1. Energy Performance Level (EPL) Display Card shall be signed by the builder per FBCEC 5th ed. R405.4.3. 2. Location of air handling unit on hvac plan does not match with floor plan. Coordinate for clarity per FBC 5th ed. 107.2.1. F.N.Reodica-386-986-4734. | |||
| PLUM | COMPLETE | 12/10/2015 | 12/11/2015 |
| SW1 | COMPLETE | 12/10/2015 | 12/10/2015 |
| UD1 | COMPLETE | 12/10/2015 | 12/14/2015 |
| Note: See Notes | |||
| ZON | HOLD | 12/10/2015 | 12/11/2015 |
| Note: Provide the correct flood panel number for the Boundary Survey and site plan. | |||
| URB | COMPLETE | 12/10/2015 | 12/11/2015 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 09/15/2016 |
| REVISION | ¤40.00 | 09/15/2016 |
| REINSPECTION FEE | ¤40.00 | 09/15/2016 |
| REINSPECTION FEE | ¤40.00 | 09/15/2016 |
| REINSPECTION FEE | ¤40.00 | 09/15/2016 |
| REINSPECTION FEE | ¤40.00 | 09/15/2016 |
| REINSPECTION FEE | ¤40.00 | 09/15/2016 |
| REINSPECTION FEE | ¤40.00 | 09/15/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤628.00 | 01/06/2016 |
| NEW RESIDENTIAL INSPECTIONS | (¤628.00) | 01/06/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤628.00 | 01/06/2016 |
| SCHOOL BOARD IMPACT FEE RES | (¤3,600.00) | 01/06/2016 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 01/06/2016 |
| SCHOOL BOARD IMPACT FEE RES | (¤3,600.00) | 01/06/2016 |
| SITE PLAN 20 | (¤20.00) | 01/06/2016 |
| SITE PLAN 20 | ¤20.00 | 01/06/2016 |
| SITE PLAN 20 | ¤20.00 | 01/06/2016 |
| SURCHARGE FS 533.721 | ¤22.78 | 01/06/2016 |
| SURCHARGE FS 533.721 | (¤22.78) | 01/06/2016 |
| SURCHARGE FS 533.721 | ¤22.78 | 01/06/2016 |
| SURCHARGE - FS 468.631 | (¤22.78) | 01/06/2016 |
| SURCHARGE - FS 468.631 | ¤22.78 | 01/06/2016 |
| SURCHARGE - FS 468.631 | ¤22.78 | 01/06/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/06/2016 |
| STORM WATER PERMIT FEES | (¤80.00) | 01/06/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/06/2016 |
| TRANSPORTATION IMPACT FEE | ¤3,124.67 | 01/06/2016 |
| TRANSPORTATION IMPACT FEE | (¤3,124.67) | 01/06/2016 |
| TRANSPORTATION IMPACT FEE | (¤3,124.67) | 01/06/2016 |
| ADMIN FEE | (¤20.00) | 01/06/2016 |
| ADMIN FEE | ¤20.00 | 01/06/2016 |
| ADMIN FEE | ¤20.00 | 01/06/2016 |
| ELECTRIC FEE | ¤248.40 | 01/06/2016 |
| ELECTRIC FEE | (¤248.40) | 01/06/2016 |
| ELECTRIC FEE | ¤248.40 | 01/06/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | (¤212.80) | 01/06/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 01/06/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 01/06/2016 |
| IMPACT FEE PARKS | ¤849.24 | 01/06/2016 |
| IMPACT FEE PARKS | (¤849.24) | 01/06/2016 |
| IMPACT FEE PARKS | ¤849.24 | 01/06/2016 |
| IMPACT FEE SCHOOL | (¤3,600.00) | 01/06/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/06/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/06/2016 |
| FIRE RESIDENTIAL IMPACT FEE | ¤212.80 | 01/06/2016 |
| FIRE RESIDENTIAL IMPACT FEE | (¤212.80) | 01/06/2016 |
| FIRE RESIDENTIAL IMPACT FEE | (¤212.80) | 01/06/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 01/06/2016 |
| IMPACT FEE TRANSPORTATION | (¤3,124.67) | 01/06/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 01/06/2016 |
| MECHANICAL FEE | ¤248.40 | 01/06/2016 |
| MECHANICAL FEE | (¤248.40) | 01/06/2016 |
| MECHANICAL FEE | ¤248.40 | 01/06/2016 |
| PARKS IMPACT FEE | ¤849.24 | 01/06/2016 |
| PARKS IMPACT FEE | (¤849.24) | 01/06/2016 |
| PARKS IMPACT FEE | (¤849.24) | 01/06/2016 |
| PLAN CHECK FEE | ¤125.60 | 01/06/2016 |
| PLAN CHECK FEE | (¤125.60) | 01/06/2016 |
| PLAN CHECK FEE | ¤125.60 | 01/06/2016 |
| PLUMBING FEE | (¤248.40) | 01/06/2016 |
| PLUMBING FEE | ¤248.40 | 01/06/2016 |
| PLUMBING FEE | ¤248.40 | 01/06/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,984.36 |