I want to search for...

Permit #2015120259

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-2420
CONDITIONED SPACE: 2002 sqft
GARAGE: 469 sqft
OPENED PORCH (WITH ROOF) : 39 sqft
OPENED PORCH (WITH ROOF) : 254 sqft
Total Square Footage: 2764 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: (386)383-0376
Location Address: 149 ASPEN WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/06/2016
NOC: RECORDED
Applicant name: ANTHONY CRAIG GUCCIONE
Owner: TUBESING, GORDON EARL

Address

LIVING TRUST

SEQUIM, WA 98382

Address

31 FLIGHT ALLEY

SEQUIM, WA 98382

Lot: 242
Contracted Stated Job Value: ¤313,900.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLD COAST HOME BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 354707

PALM COAST, FL 32137

CGC1507791 (Exp: 08/31/2026) 386-313-6221

Sub Contractors

BENJAMIN EDWARD SMITH
Status Location Address State License Number Phone
CANCEL

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13004288 (Exp: 08/31/2016) 386-265-2687
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
JOHN BRADLEY WINFREY JR
Status Location Address State License Number Phone Fax
ACTIVE

1685 S. CLARA AVE

Deland, FL 32720

CFC054901 (Exp: 08/31/2026) 386-734-0154 386-734-2751
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 09/16/2016 FINAL APPROVED DSPENCER
BLD - BUILDING FINAL 09/15/2016 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 09/14/2016 Disapproved -FEE REQUIRED JCOLASANTI
Note: NEED TO HAVE ARC SHIELDS WHERE THERE IS MORE THAN 1/4" SPACE AT COMBUSTABLES CHECK ALL OUTLETS..NEC 314.20
FINAL APRON (AFTER POUR/DRIVEWAY) 09/13/2016 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION. SURVEY ON SITE. APPROVED FOR APRON FINAL.
ROW FINAL 09/13/2016 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION. SURVEY DOCS ON SITE. ONE ROW INSPECTION WAS DELETED BY INSPECTOR (ROBERT) BECAUSE THE ROW WAS ENTERED AS A FAIL AND REGENERATED ANOTHER ROW. HOWEVER, THE ROW WAS THEN PASSED AS-NOTED AFTER CLARIFICATION OF IRRIGATION RULES IN THIS SUB-DIVISION.
FINAL APRON (AFTER POUR/DRIVEWAY) 09/09/2016 Disapproved -FEE REQUIRED CTROHA
Note: MISSING DOCUMENTS: FINAL SURVEY
ROW FINAL 09/09/2016 Disapproved - NO FEE CTROHA
Note: THIS IS A REINSPECTION MISSING DOCUMENTS:
FINAL SURVEY (OFFICE USE ONLY) 09/08/2016 APPROVED DREWIS
ROW FINAL 08/31/2016 Disapproved -FEE REQUIRED CTROHA
Note: GENERAL CLEANUP: PICK UP ALL TRASH AND CONSTRUCTION DEBRIS ON ADJACENT LOTS SWEEP OFF GUTTER AND DRIVEWAY
PRE-APRON (PRE-POUR/DRIVEWAY) 08/31/2016 APPROVED - AS NOTED CTROHA
Note: THIS IS A REINSPECTION MIAMI GUTTER AND CURB ADJUSTMENT COMPLETE NEED APPROVED FINAL SURVEY AT FINAL INSPECTION NEED BRASS CAP FOR CLEAN OUT IN DRIVEWAY BEFORE UTILITY INSPECTION
FINAL SURVEY (OFFICE USE ONLY) 08/23/2016 APPROVED DREWIS
PRE-APRON (PRE-POUR/DRIVEWAY) 06/29/2016 PARTIALLY APPROVED CTROHA
Note: ISSUE WITH THE DRIVEWAY ENDING AT STORM DRAIN OK FOR PAVERS EXCEPT THIS AREA
ELECTRIC - EARLY POWER 06/14/2016 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 6/14/2016 2:12:39 PM SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:00
U - SEWER TIE IN 05/09/2016 APPROVED JNICHOLS
GRAVITY SEWER TEST 04/15/2016 APPROVED CMINI
LATH/BRICK/ WATER BARRIER 04/01/2016 APPROVED JCOLASANTI
INSULATION 04/01/2016 APPROVED JCOLASANTI
ALL ROUGH 03/09/2016 APPROVED CMINI
ELECTRIC-TUG 03/08/2016 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION Inspection Resulted at 3/8/2016 1:49:22 PM SPOKE TO SUSAN FPL RELEASED TUG 1:48
ELECTRIC-TUG 03/07/2016 Disapproved -FEE REQUIRED RMARTIN
Note: Inspection Resulted at 3/7/2016 11:03:05 AM GFCI NOT INSTALLED UNDER PANEL JUST WIRE IN WEATHERPROOF, NEED TO BE SAFED OFF AND UFERGROUND NOT CONNECTED PROPERLY(LOOSE) PULLED OUT NEED TO CORRECT
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/19/2016 APPROVED - AS NOTED JCOLASANTI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/19/2016 3:57:17 PM NEED TO LOOK AT FRONT ENTRY DOES NOT MATCH DETAIL, CORNER STRAP OVERBENT......NEED TO REVISE TRUSS ENGINEERING AT REAR DINNING AREA.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/15/2016 Disapproved -FEE REQUIRED JCOLASANTI
Note: Inspection Resulted at 2/15/2016 3:49:41 PM NEED TO COMPLETE FRAMING AT ROOF PER PLAN DETAILS, WILL COMPLETE INSPECTION WHEN THIS IS COMPLETE.
TIE BEAM / LINTEL 01/25/2016 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 01/22/2016 APPROVED DREWIS
MONOLITHIC SLAB 01/11/2016 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 01/08/2016 Disapproved -FEE REQUIRED JCOLASANTI
Note: Inspection Resulted at 1/8/2016 3:16:47 PM 4 #5 LOCATED AT RIGHT OF HOUSE PLANS CALL TO BE CONTINUOS.
PLUMBING 1ST ROUGH UNDERGROUND 01/07/2016 APPROVED JCOLASANTI

Review History

Department Status Date In Date Out
SW1 COMPLETE 09/07/2016 09/08/2016
Note: Released By: DREWIS FINAL S
SW1 COMPLETE 08/22/2016 08/23/2016
Note: Released By: DREWIS final s
BLD COMPLETE 03/02/2016 03/04/2016
SW1 COMPLETE 01/20/2016 01/22/2016
Note: Released By: DREWIS foundation suvery
ZON COMPLETE 01/04/2016 01/05/2016
MECH COMPLETE 12/22/2015 12/28/2015
BLD COMPLETE 12/22/2015 12/23/2015
ZON HOLD 12/22/2015 12/23/2015
Note: REPEAT COMMENT: Provide the correct flood panel number for the Boundary Survey and site plan.
BLD HOLD 12/10/2015 12/11/2015
Note: 1. Provide updated code references on code criteria per FBC 5th edition (2014). 2. Provide information of underlayment to be used on Roofing Worksheet per FBC 5th ed. 107.2.1. F.N. Reodica - 386-986-4734.
ELEC COMPLETE 12/10/2015 12/10/2015
ENGIN1 COMPLETE 12/10/2015 12/10/2015
MECH HOLD 12/10/2015 12/11/2015
Note: 1. Energy Performance Level (EPL) Display Card shall be signed by the builder per FBCEC 5th ed. R405.4.3. 2. Location of air handling unit on hvac plan does not match with floor plan. Coordinate for clarity per FBC 5th ed. 107.2.1. F.N.Reodica-386-986-4734.
PLUM COMPLETE 12/10/2015 12/11/2015
SW1 COMPLETE 12/10/2015 12/10/2015
UD1 COMPLETE 12/10/2015 12/14/2015
Note: See Notes
ZON HOLD 12/10/2015 12/11/2015
Note: Provide the correct flood panel number for the Boundary Survey and site plan.
URB COMPLETE 12/10/2015 12/11/2015

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 09/15/2016
REVISION ¤40.00 09/15/2016
REINSPECTION FEE ¤40.00 09/15/2016
REINSPECTION FEE ¤40.00 09/15/2016
REINSPECTION FEE ¤40.00 09/15/2016
REINSPECTION FEE ¤40.00 09/15/2016
REINSPECTION FEE ¤40.00 09/15/2016
REINSPECTION FEE ¤40.00 09/15/2016
NEW RESIDENTIAL INSPECTIONS ¤628.00 01/06/2016
NEW RESIDENTIAL INSPECTIONS (¤628.00) 01/06/2016
NEW RESIDENTIAL INSPECTIONS ¤628.00 01/06/2016
SCHOOL BOARD IMPACT FEE RES (¤3,600.00) 01/06/2016
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 01/06/2016
SCHOOL BOARD IMPACT FEE RES (¤3,600.00) 01/06/2016
SITE PLAN 20 (¤20.00) 01/06/2016
SITE PLAN 20 ¤20.00 01/06/2016
SITE PLAN 20 ¤20.00 01/06/2016
SURCHARGE FS 533.721 ¤22.78 01/06/2016
SURCHARGE FS 533.721 (¤22.78) 01/06/2016
SURCHARGE FS 533.721 ¤22.78 01/06/2016
SURCHARGE - FS 468.631 (¤22.78) 01/06/2016
SURCHARGE - FS 468.631 ¤22.78 01/06/2016
SURCHARGE - FS 468.631 ¤22.78 01/06/2016
STORM WATER PERMIT FEES ¤80.00 01/06/2016
STORM WATER PERMIT FEES (¤80.00) 01/06/2016
STORM WATER PERMIT FEES ¤80.00 01/06/2016
TRANSPORTATION IMPACT FEE ¤3,124.67 01/06/2016
TRANSPORTATION IMPACT FEE (¤3,124.67) 01/06/2016
TRANSPORTATION IMPACT FEE (¤3,124.67) 01/06/2016
ADMIN FEE (¤20.00) 01/06/2016
ADMIN FEE ¤20.00 01/06/2016
ADMIN FEE ¤20.00 01/06/2016
ELECTRIC FEE ¤248.40 01/06/2016
ELECTRIC FEE (¤248.40) 01/06/2016
ELECTRIC FEE ¤248.40 01/06/2016
IMPACT FEE FIRE NONRESIDENTIAL (¤212.80) 01/06/2016
IMPACT FEE FIRE NONRESIDENTIAL ¤212.80 01/06/2016
IMPACT FEE FIRE NONRESIDENTIAL ¤212.80 01/06/2016
IMPACT FEE PARKS ¤849.24 01/06/2016
IMPACT FEE PARKS (¤849.24) 01/06/2016
IMPACT FEE PARKS ¤849.24 01/06/2016
IMPACT FEE SCHOOL (¤3,600.00) 01/06/2016
IMPACT FEE SCHOOL ¤3,600.00 01/06/2016
IMPACT FEE SCHOOL ¤3,600.00 01/06/2016
FIRE RESIDENTIAL IMPACT FEE ¤212.80 01/06/2016
FIRE RESIDENTIAL IMPACT FEE (¤212.80) 01/06/2016
FIRE RESIDENTIAL IMPACT FEE (¤212.80) 01/06/2016
IMPACT FEE TRANSPORTATION ¤3,124.67 01/06/2016
IMPACT FEE TRANSPORTATION (¤3,124.67) 01/06/2016
IMPACT FEE TRANSPORTATION ¤3,124.67 01/06/2016
MECHANICAL FEE ¤248.40 01/06/2016
MECHANICAL FEE (¤248.40) 01/06/2016
MECHANICAL FEE ¤248.40 01/06/2016
PARKS IMPACT FEE ¤849.24 01/06/2016
PARKS IMPACT FEE (¤849.24) 01/06/2016
PARKS IMPACT FEE (¤849.24) 01/06/2016
PLAN CHECK FEE ¤125.60 01/06/2016
PLAN CHECK FEE (¤125.60) 01/06/2016
PLAN CHECK FEE ¤125.60 01/06/2016
PLUMBING FEE (¤248.40) 01/06/2016
PLUMBING FEE ¤248.40 01/06/2016
PLUMBING FEE ¤248.40 01/06/2016
Fees Total Due: ¤0.00 Total Paid: ¤1,984.36