I want to search for...
Permit #2016010443
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-000000-0550 |
| CONDITIONED SPACE: 2998 sqft |
| GARAGE: 847 sqft |
| OPENED PORCH (WITH ROOF) : 772 sqft |
| OPENED PORCH (WITH ROOF) : 37 sqft |
| Total Square Footage: 4654 sqft |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-236-4140 |
| Location Address: 52 SCARLET OAK CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/23/2016 |
| NOC: RECORDED |
| Applicant name: MOJTABA KHORASANI BABAZADEH |
| Owner: INTERVEST CONSULTING SERVICES INC |
|
Address 2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
| Lot: 55 |
| Contracted Stated Job Value: ¤398,198.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSULTING SERVICES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
CBC1258104 (Exp: 08/31/2020) | 386-236-4140 | 386-763-7840 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
PAUL S AIELLO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 351926 PALM COAST, FL 32137 |
CAC1815808 (Exp: 08/31/2016) | (386)239-0053 | (386)323-1955 |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 07/29/2016 | APPROVED - AS NOTED | RGROSS |
| Note: This inspection was done, but not entered when inspected. Any questions. Call Robert. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/29/2016 | FINAL APPROVED | JNICHOLS |
| Note: PER CONTRACTOR | |||
| ROW FINAL | 07/28/2016 | FINAL APPROVED | CTROHA |
| Note: THIS IS A REINSPECTION COMPLETE | |||
| ROW FINAL | 07/27/2016 | Disapproved -FEE REQUIRED | RGROSS |
| Note: STABILIZE ALL BARE EARTH AREAS BEHIND THE REAR PROPERTY LINE WITH SEED AND STRAW. WILL (SUPER FOR CONTRACTOR) SAID THAT, PER GARY, MIAMI GUTTER DAMAGE WAS THERE PRIOR TO CONSTRUCTION. BUILDER NOT RESPONSIBLE FOR THE REPAIRS. | |||
| BLD - BUILDING FINAL | 07/25/2016 | FINAL APPROVED | LMILLER |
| FINAL SURVEY (OFFICE USE ONLY) | 07/15/2016 | APPROVED | DREWIS |
| ROW- PRE-APRON (PRE-POUR) | 06/29/2016 | APPROVED | CTROHA |
| Note: READY FOR PAVERS | |||
| ELECTRIC - EARLY POWER | 06/23/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: Inspection Resulted at 6/23/2016 12:47:13 PM SPOKE TO FPL RELEASED EARLY POWER 1:10 | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 06/16/2016 | APPROVED | GLALIMA |
| Note: READY TO POUR | |||
| INSULATION | 05/16/2016 | APPROVED - AS NOTED | LMILLER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/16/2016 11:41:25 AM REVISION IS NOT APPROVED, NEED APPROVED REVISION BY FINAL. HANG WALL BOARDS AT CONTRACTOR RISK ONLY | |||
| INSULATION | 05/13/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 5/13/2016 2:43:25 PM BLOCK WALL R-RATING DOERS NOT MEET THE REQUIREMENTS OF THE ENERGY CALCS | |||
| LATH/BRICK/ WATER BARRIER | 05/11/2016 | APPROVED | LMILLER |
| ALL ROUGH | 05/11/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 05/10/2016 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/10/2016 1:43:11 PM METAL BOXES NOT GROUNDED, CHECK ALL..NEC 314.4 BOXES NOT MADE UP IN GARAGE AND CARRIGE LIGHTS.. FRAMING MISSING AROUND PANELS.. BATH EXHAUST FAN NOT WIRED IN MASTER, CONNECTOR BUSHING MISSING IN 2ND BATH EXHAUAST FAN . NEC 334.17 | |||
| ALL ROUGH | 05/09/2016 | CANCELLED BY APPLICANT | LMILLER |
| WALL SHEATHING | 05/04/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| WALL SHEATHING | 05/02/2016 | CANCELLED BY APPLICANT | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| WALL SHEATHING | 04/27/2016 | CANCELLED BY APPLICANT | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/27/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/25/2016 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 4/25/2016 11:40:36 AM RE-STRAP C-5 TRUSS IN MASTER AT BLOCK WALL/STRAP 2X6 HEADER AT BEARING WALL INTERIOR HALLWAY UNDER C1 TRUSS- | |||
| WALL SHEATHING | 04/25/2016 | CANCELLED BY APPLICANT | DROCKWELL |
| Note: Inspection Resulted at 4/25/2016 11:40:35 AM ALL STRAPPING FOR EXTERIOR WALLS COMPLETE.WALL SHEATHING MAY RESUME | |||
| ELECTRIC-TUG | 04/13/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: Inspection Resulted at 4/13/2016 11:46:52 AM SPOKE TO DELL FPL RELEASED TUG 11:45 | |||
| TIE BEAM / LINTEL | 04/05/2016 | APPROVED | LMILLER |
| ELEV CERT-FOUNDATION APPROVAL | 04/04/2016 | APPROVED | DBEVAN |
| Note: Elevation Certificate dated 3/18/2016 for BUC is approved. | |||
| ELEV CERT-FOUNDATION APPROVAL | 03/28/2016 | Disapproved - NO FEE | CBENTLEY |
| FOUND SURVEY APPROVED (OFFICE) | 03/24/2016 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 03/15/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 03/14/2016 | CANCELLED BY APPLICANT | LMILLER |
| U - SEWER TIE IN | 03/09/2016 | APPROVED | MBACON |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/08/2016 | APPROVED | CMINI |
| GRAVITY SEWER TEST | 03/08/2016 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| DSD | COMPLETE | 07/19/2016 | 07/22/2016 |
| SW1 | COMPLETE | 07/15/2016 | 07/15/2016 |
| Note: Released By: DREWIS final s | |||
| MECH | COMPLETE | 05/18/2016 | 05/19/2016 |
| Note: Revision - changed energy calcs. on conc.block insulation from R 7.1 to R 4.1 & wood frame adj. insulation from R 13 to R-11. | |||
| PLFM | COMPLETE | 03/30/2016 | 04/04/2016 |
| PLFM | HOLD | 03/28/2016 | 03/28/2016 |
| Note: On the elevation certificate Section B9 needs to be in tenths. | |||
| SW1 | COMPLETE | 03/24/2016 | 03/24/2016 |
| Note: Released By: DREWIS foundation s | |||
| MECH | COMPLETE | 02/26/2016 | 02/26/2016 |
| Note: Revision - Changed energy calc. | |||
| ELEC | COMPLETE | 02/15/2016 | 02/17/2016 |
| ELEC | HOLD | 02/05/2016 | 02/05/2016 |
| Note: Please add receptacle to wall space in front room that borders the kitchen, NEC 2011 210.52. -DC. Rewis 986-4736 | |||
| BLD | COMPLETE | 01/21/2016 | 01/21/2016 |
| ELEC | HOLD | 01/21/2016 | 01/22/2016 |
| Note: Receptacles needed in wall spaces in front room and back bedroom leading to bathroom. NEC 2011 210.52. -DC. Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 01/21/2016 | 01/21/2016 |
| MECH | COMPLETE | 01/21/2016 | 01/21/2016 |
| PLUM | COMPLETE | 01/21/2016 | 01/21/2016 |
| SW1 | COMPLETE | 01/21/2016 | 01/22/2016 |
| UD1 | COMPLETE | 01/21/2016 | 01/22/2016 |
| Note: See Notes | |||
| ZON | COMPLETE | 01/21/2016 | 01/22/2016 |
| PLFM | COMPLETE | 01/21/2016 | 01/22/2016 |
| URB | COMPLETE | 01/21/2016 | 01/21/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/28/2016 |
| REINSPECTION FEE | ¤40.00 | 07/15/2016 |
| REINSPECTION FEE | ¤40.00 | 07/15/2016 |
| REINSPECTION FEE | ¤40.00 | 07/15/2016 |
| REVISION | ¤40.00 | 07/15/2016 |
| REVISION | ¤40.00 | 07/15/2016 |
| SITE PLAN 20 | ¤20.00 | 02/23/2016 |
| SURCHARGE FS 533.721 | ¤28.69 | 02/23/2016 |
| SURCHARGE - FS 468.631 | ¤28.69 | 02/23/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/23/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 02/23/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤802.00 | 02/23/2016 |
| ADMIN FEE | ¤20.00 | 02/23/2016 |
| ELECTRIC FEE | ¤300.60 | 02/23/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 02/23/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 02/23/2016 |
| IMPACT FEE PARKS | ¤849.24 | 02/23/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/23/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 02/23/2016 |
| MECHANICAL FEE | ¤300.60 | 02/23/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/23/2016 |
| PLAN CHECK FEE | ¤160.40 | 02/23/2016 |
| PLUMBING FEE | ¤300.60 | 02/23/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,942.69 |