I want to search for...
Permit #2016020747
Permit Details
Status: COED
| Parcel Id: 15-11-31-2970-00000-0930 |
| CONDITIONED SPACE: 2130 sqft |
| GARAGE: 661 sqft |
| OPENED PORCH (WITH ROOF) : 261 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| Total Square Footage: 3143 sqft |
| Block: 00000 |
| Subdivision: 2070 - Grand Haven North Phase 1 @ Grand Haven |
| Job Phone: 386-947-4481 |
| Location Address: 57 NORTH PARK CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/08/2016 |
| NOC: RECORDED |
| Applicant name: ERIC CHRISTOPHER OLSEN |
| Owner: MODEN, JOHN C & PATRICIA |
|
Address 36 COOPER LANE PALM COAST, FL 32137 |
| Lot: 0930 |
| Contracted Stated Job Value: ¤282,400.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
OLSEN CUSTOM HOMES AND CONSULTING INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
CGC1508852 (Exp: 08/31/2026) | 386-947-4481 | (386)947-4484 |
Sub Contractors
BENJAMIN EDWARD SMITH
| Status | Location Address | State License Number | Phone |
| CANCEL |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13004288 (Exp: 08/31/2016) | 386-265-2687 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32136 |
CAC048127 (Exp: 08/31/2018) | 386-445-5023 | 386-446-4614 |
JOHN BRADLEY WINFREY JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1685 S. CLARA AVE Deland, FL 32720 |
CFC054901 (Exp: 08/31/2026) | 386-734-0154 | 386-734-2751 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 09/15/2016 | FINAL APPROVED | JNICHOLS |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 09/12/2016 | Disapproved - NO FEE | JNICHOLS |
| Note: the sewer cleanout pipe needs to be cot down to the ground elevation and a flat threaded acess cap needs to be installed. | |||
| GAS ROUGH | 09/12/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 09/12/2016 | FINAL APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 09/09/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: OPENINGS BETWEEN GARAGE AND RESIDENCE SHALL BE EQUIPPED WITH A SELF-CLOSING DEVICE.. (STILL NOT CLOSING PROPERLY) FBC .302.5.1 | |||
| ROW FINAL | 09/07/2016 | APPROVED | CTROHA |
| Note: THIS IS A REINSPECTION PALLETS HAVE BEEN MOVED GUTTER HAS BEEN CLEANED | |||
| BLD - BUILDING FINAL | 09/07/2016 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 9/7/2016 2:54:01 PM OPENINGS BETWEEN GARAGE AND RESIDENCE SHALL BE EQUIPPED WITH A SELF-CLOSING DEVICE.. (NOT CLOSING PROPERLY) FBC .302.5.1.WEATHER STRIPPING NEEDS TO BE INSTALLED FOR FINAL AT DOORS R 612.12 FBC.. EXHAUST VENTS NOT CAPPED COMING OUT OF SOFFITS. | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 09/01/2016 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION READ R.O.W REPORT | |||
| ROW FINAL | 09/01/2016 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: NEED TO REMOVE THE PALLET OF PAVERS BLOCKING THE WALKWAY , AND THE ROOFING TILE / 16 EACH PALLETS BEFOR YOU CAN PASS THE R.O.W . SWEEP STREET GUTTER . PHOTOS IF NEEDED | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 08/29/2016 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION. NO FINAL SURVEY ON SITE. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/26/2016 | APPROVED | DREWIS |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 08/25/2016 | Disapproved -FEE REQUIRED | RGROSS |
| Note: WORK NOT COMPLETED. PAVERS IN APRON STILL NOT PLACED. LARGE COCRETE RMNANTS STILL IN ROW. PHOTO'S TAKEN. | |||
| GRAVITY SEWER TEST | 08/11/2016 | FINAL APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 08/10/2016 | CANCELLED BY APPLICANT | CMINI |
| U - SEWER TIE IN | 08/10/2016 | APPROVED | MBACON |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 07/29/2016 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. READY FOR PAVERS | |||
| ELECTRIC - EARLY POWER | 07/28/2016 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 07/22/2016 | Disapproved -FEE REQUIRED | RGROSS |
| Note: SUB-BASE MUST BE ON SITE AND DEPTH OF SUB-BASE MUST BE OBSERVABLE. | |||
| LATH/BRICK/ WATER BARRIER | 06/27/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| GAS ROUGH | 06/24/2016 | Disapproved - NO FEE | LMILLER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/24/2016 10:38:23 AM IN HOUSE GAS ROUGH PASSED (CALL ROUGH IN AGAIN WHEN TANK AND LINES HAVE BEEN PLACED, PRIOR TO GAS FINAL) | |||
| LATH/BRICK/ WATER BARRIER | 06/24/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/24/2016 10:38:23 AM PLACE REMAINING MISSING STUCCO STOPS AT ROOF/WALL INTERSECTS. ALSO PLACE SILT FENCE TO CONTROL RUN OFF | |||
| LATH/BRICK/ WATER BARRIER | 06/22/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 6/22/2016 1:32:16 PM INCOMPLETE PREP, LATH AND STUCCO STOP NEEDED AT WALL TO ROOF INTERSECTIONS. PLACE LATH AT REAR SLIDER | |||
| INSULATION | 06/15/2016 | APPROVED | LMILLER |
| GAS ROUGH | 06/14/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 6/14/2016 1:37:11 PM APPROVED PLANS DO NOT SHOW FIRE PLACE, OBTAIN APPROVED REVISION TO INDICATE LOCATION OF FIRE PLACE AND ANY OTHER GAS APPLIANCES, ALSO SUBMIT PROPOSED SURVEY TO INCLUDE PROPOSED LACATION OF TANK. ALSO TAG GAS LINES WITH THE PRESSURE APPLIED FOR ROUGH INSPECTION | |||
| ALL ROUGH | 06/07/2016 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 6/7/2016 2:25:22 PM INSTALL BEDROOM WINDOW BEFORE NEXT INSPECTION/MOVE FURRING STRIP IN MASTER SHOWER 11/2 INCH AWAY FROM PIPE TO PROTECT PIPE/PROTECT LOW-VOLT WIRING AT ALL WINDOWS.CALL IN GAS ROUGH | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/16/2016 | APPROVED | LMILLER |
| ELECTRIC - EARLY POWER | 05/16/2016 | PARTIALLY APPROVED | RMARTIN |
| Note: this was a TUG inspection, called fpl to release power.. need to call early power in when ready, needed to partial because there was no TUG listed on permit | |||
| TIE BEAM / LINTEL | 05/05/2016 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 04/27/2016 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 04/15/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 04/14/2016 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 4/14/2016 11:58:02 AM PLANS CALLING FOR FRONT COLUMN FOOTERS TO BE 16" DEEP, ONLY ABOUT 10" NEED CORRECTION AT GARAGE | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/08/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/05/2016 | CANCELLED BY APPLICANT | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/04/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 4/4/2016 3:34:10 PM 10’ HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.4 RISER DIAGRAM MUST BE ON SITE AT TIME OF FIRST ROUGH |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 08/26/2016 | 08/26/2016 |
| Note: Released By: DREWIS FINAL S | |||
| BLD | COMPLETE | 06/23/2016 | 06/23/2016 |
| BLD | COMPLETE | 05/11/2016 | 05/12/2016 |
| PLFM | COMPLETE | 04/28/2016 | 04/29/2016 |
| Note: Please note that the project site is located entirely in an "X" zone. Elevation certificates are not required for projects located solely in an "X" zone. Please contact Denise Bevan, CFM to discuss further 386-986-2458. | |||
| SW1 | COMPLETE | 04/27/2016 | 04/27/2016 |
| Note: Released By: DREWIS foundation s | |||
| PLUM | COMPLETE | 04/06/2016 | 04/06/2016 |
| Note: Revision - Pre-plumb for future summer kitchen.. | |||
| UD1 | COMPLETE | 03/02/2016 | 03/03/2016 |
| Note: See Notes | |||
| MECH | COMPLETE | 03/02/2016 | 03/04/2016 |
| SW1 | COMPLETE | 03/02/2016 | 03/07/2016 |
| BLD | COMPLETE | 02/24/2016 | 02/29/2016 |
| ELEC | COMPLETE | 02/24/2016 | 02/29/2016 |
| ENGIN1 | COMPLETE | 02/24/2016 | 02/24/2016 |
| MECH | HOLD | 02/24/2016 | 02/25/2016 |
| Note: 1. Provide balanced return air from all bedrooms including sizes of transfer duct/grille per FBCR 5th ed. M1602.4. 2. Provide signature and license number of hvac contractor on hvac plan per FBC 5th ed. 107.2.1. F.N.Reodica-386-986-4734. | |||
| PLUM | COMPLETE | 02/24/2016 | 02/25/2016 |
| SW1 | HOLD | 02/24/2016 | 02/29/2016 |
| Note: Please provide additional survey measurements around site depicting positve storm water flow. DC. Rewis 986-4736 | |||
| UD1 | HOLD | 02/24/2016 | 02/25/2016 |
| Note: See Notes | |||
| ZON | COMPLETE | 02/24/2016 | 02/25/2016 |
| URB | COMPLETE | 02/24/2016 | 02/24/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/09/2016 |
| REINSPECTION FEE | ¤40.00 | 09/09/2016 |
| REVISION | ¤40.00 | 09/06/2016 |
| REVISION | ¤40.00 | 09/06/2016 |
| REVISION | ¤40.00 | 09/06/2016 |
| REINSPECTION FEE | ¤40.00 | 09/06/2016 |
| REINSPECTION FEE | ¤40.00 | 09/06/2016 |
| REINSPECTION FEE | ¤40.00 | 09/06/2016 |
| REINSPECTION FEE | ¤40.00 | 09/06/2016 |
| REINSPECTION FEE | ¤40.00 | 09/06/2016 |
| REINSPECTION FEE | ¤40.00 | 09/06/2016 |
| REINSPECTION FEE | ¤40.00 | 09/06/2016 |
| REINSPECTION FEE | ¤40.00 | 09/06/2016 |
| REINSPECTION FEE | ¤40.00 | 09/06/2016 |
| ADMIN FEE | ¤20.00 | 03/08/2016 |
| ELECTRIC FEE | ¤229.80 | 03/08/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 03/08/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 03/08/2016 |
| IMPACT FEE PARKS | ¤849.24 | 03/08/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/08/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 03/08/2016 |
| MECHANICAL FEE | ¤229.80 | 03/08/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/08/2016 |
| PLAN CHECK FEE | ¤113.20 | 03/08/2016 |
| PLUMBING FEE | ¤229.80 | 03/08/2016 |
| SITE PLAN 20 | ¤20.00 | 03/08/2016 |
| SURCHARGE FS 533.721 | ¤21.15 | 03/08/2016 |
| SURCHARGE - FS 468.631 | ¤21.15 | 03/08/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/08/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 03/08/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤566.00 | 03/08/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,752.01 |