I want to search for...
Permit #2016020854
Permit Details
Status: COED
| Parcel Id: 07-11-31-7012-00110-0380 |
| CONDITIONED SPACE: 2437 sqft |
| GARAGE: 575 sqft |
| OPENED PORCH (WITH ROOF) : 180 sqft |
| OPENED PORCH (WITH ROOF) : 130 sqft |
| Total Square Footage: 3322 sqft |
| Block: 00110 |
| Subdivision: 2187 - SECTION 12-BELLE TERRE |
| Job Phone: 904-268-7730 |
| Location Address: 64 BALTIMORE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/08/2016 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMPBELL JR |
| Owner: MARONDA HOMES INC |
|
Address 9700 PHILLIPS HWY STE 102 JACKSONVILLE, FL 32256 |
| Lot: 0380 |
| Contracted Stated Job Value: ¤119,565.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES INC. OF FLORIDA
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6800 SOUTHPOINT PKWAY SUITE 300 JACKSONVILLE, FL 32216 |
CBC058803 (Exp: 08/31/2018) | 904-268-7730 | 904-268-7740 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
DEBORAH MAXINE JACKSON
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
9474 OLD PLANK RD JACKSONVILLE , FL 32220 |
CCC1328530 (Exp: 08/31/2016) | 904-435-7663 | 904-404-8406 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 11/17/2016 | FINAL APPROVED | JNICHOLS |
| ROW FINAL | 11/16/2016 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. CORRECTIONS MADE. APPROVED | |||
| BLD - BUILDING FINAL | 11/15/2016 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 11/14/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: weather stripping at top of garage door....exterior porch light not working | |||
| ROW FINAL | 11/10/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 11/03/2016 | APPROVED | GLALIMA |
| ROW FINAL | 11/03/2016 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: NEED TO BRING IN SOME FILL AND ADD IT TO THE DAMAGED SWALE ACROSS THE STREET AND TO THE VACANT LOT TO THE LEFT AND SOD ALL WITH BAHIA SOD , CAN NOT SEED AND STRAW SAWLE. CLEAN / SWEEP THE EDGE OF ROAD SO WE CAN ASSESS ROAD DAMAGE | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/02/2016 | APPROVED | FREODICA |
| ELECTRIC - EARLY POWER | 10/18/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:30 | |||
| ELECTRIC - EARLY POWER | 10/17/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: loose conductor at meter can | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 10/04/2016 | APPROVED | CTROHA |
| Note: MEETS ALL REQUIREMENTS AT TIME OF INSPECTION READY TO POUR It is the BUILDER'S RESPONSIBILITY to recheck elevations and pipe size and to insure that an obstruction does not exist upstream and or downstream PRIOR to placement of concrete. | |||
| LATH/BRICK/ WATER BARRIER | 09/12/2016 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 08/29/2016 | APPROVED | JNICHOLS |
| INSULATION | 08/23/2016 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 08/22/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: nail plates not nailed that were requested at all rough inspction | |||
| ALL ROUGH | 08/18/2016 | APPROVED - AS NOTED | JCOLASANTI |
| Note: THIS IS A REINSPECTION remove conductor from touching can light in kitchen....nail plate MBtub water line....nail plate water line laundry room | |||
| ALL ROUGH | 08/15/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need approved plans on site | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/19/2016 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need roof metel by this inspection | |||
| TIE BEAM / LINTEL | 07/05/2016 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 07/01/2016 | APPROVED | DREWIS |
| TIE DOWN | 06/28/2016 | CANCELLED BY APPLICANT | JCOLASANTI |
| LATH/BRICK/ WATER BARRIER | 06/28/2016 | CANCELLED BY APPLICANT | JCOLASANTI |
| MONOLITHIC SLAB | 06/16/2016 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 06/15/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 6/15/2016 3:23:37 PM NOT READY, WORK MUST BE COMPLETE AT TIME OF INSPECTION. FBC105.7 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/03/2016 | APPROVED | JCOLASANTI |
| GRAVITY SEWER TEST | 06/03/2016 | APPROVED | JCOLASANTI |
| STEM WALL FOUNDATION | 05/25/2016 | APPROVED | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 11/01/2016 | 11/02/2016 |
| Note: Released By: FREODICA final s | |||
| SW1 | COMPLETE | 06/30/2016 | 07/01/2016 |
| Note: Released By: DREWIS foundation s | |||
| ZON | COMPLETE | 03/24/2016 | 03/29/2016 |
| ELEC | COMPLETE | 03/24/2016 | 03/24/2016 |
| BLD | COMPLETE | 02/29/2016 | 03/02/2016 |
| ELEC | HOLD | 02/29/2016 | 03/01/2016 |
| Note: Please provide signed and sealed drawings. -DC. Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 02/29/2016 | 03/07/2016 |
| MECH | COMPLETE | 02/29/2016 | 03/01/2016 |
| PLUM | COMPLETE | 02/29/2016 | 03/01/2016 |
| SW1 | COMPLETE | 02/29/2016 | 03/01/2016 |
| UD1 | COMPLETE | 02/29/2016 | 03/03/2016 |
| Note: See Notes | |||
| URB | COMPLETE | 02/29/2016 | 02/29/2016 |
| ZON | HOLD | 02/29/2016 | 03/01/2016 |
| Note: Stucco banding must wrap front corners of home for a minimum of 2'. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/23/2016 |
| REINSPECTION FEE | ¤40.00 | 11/23/2016 |
| REINSPECTION FEE | ¤40.00 | 11/23/2016 |
| REINSPECTION FEE | ¤40.00 | 11/23/2016 |
| REINSPECTION FEE | ¤40.00 | 11/23/2016 |
| REINSPECTION FEE | ¤40.00 | 11/23/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤612.00 | 04/08/2016 |
| SITE PLAN 20 | ¤20.00 | 04/08/2016 |
| SURCHARGE FS 533.721 | ¤22.62 | 04/08/2016 |
| SURCHARGE - FS 468.631 | ¤22.62 | 04/08/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/08/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 04/08/2016 |
| ADMIN FEE | ¤20.00 | 04/08/2016 |
| ELECTRIC FEE | ¤243.60 | 04/08/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 04/08/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 04/08/2016 |
| IMPACT FEE PARKS | ¤849.24 | 04/08/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/08/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 04/08/2016 |
| MECHANICAL FEE | ¤243.60 | 04/08/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/08/2016 |
| PLAN CHECK FEE | ¤122.40 | 04/08/2016 |
| PLUMBING FEE | ¤243.60 | 04/08/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,531.55 |