I want to search for...
Permit #2016030291
Permit Details
Status: COED
| Parcel Id: 07-11-31-7060-00310-0150 |
| CONDITIONED SPACE: 2436 sqft |
| GARAGE: 588 sqft |
| OPENED PORCH (WITH ROOF) : 187 sqft |
| OPENED PORCH (WITH ROOF) : 131 sqft |
| Total Square Footage: 3342 sqft |
| Block: 00310 |
| Subdivision: 2200 - SECTION 60-SEMINOLE PARK |
| Job Phone: 904-268-7730 |
| Location Address: 57 SLOCUM PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/30/2016 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMPBELL JR |
| Owner: MARONDA HOMES INC OF FLORIDA |
|
Address 9700 PHILIPS HWY STE 102 JACKSONVILLE, FL 32256 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤117,236.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES INC. OF FLORIDA
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6800 SOUTHPOINT PKWAY SUITE 300 JACKSONVILLE, FL 32216 |
CBC058803 (Exp: 08/31/2018) | 904-268-7730 | 904-268-7740 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
DEBORAH MAXINE JACKSON
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
9474 OLD PLANK RD JACKSONVILLE , FL 32220 |
CCC1328530 (Exp: 08/31/2016) | 904-435-7663 | 904-404-8406 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 10/20/2016 | FINAL APPROVED | MBACON |
| BLD - BUILDING FINAL | 10/18/2016 | FINAL APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 10/17/2016 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Expansion tank or valve at water heater 2nd request | |||
| ROW FINAL | 10/17/2016 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. BROKEN/MISSING WATER VALVE COVER IN THE ROW ON THE SLOGANEER TR SIDE PROPERTY LINE WILL NEED REPAIRED BEFORE THE UTILITY FINAL. | |||
| ROW FINAL | 10/13/2016 | Disapproved -FEE REQUIRED | CTROHA |
| Note: SEED AND STRAW EXPOSED EARTH ON ADJACENT LOT LEFT SIDE PROPERTY LINE ASPHALT PATCH REQUIRED WHERE DRIVEWAY MEETS ROAD EDGE. REPAIR SOD IN SWALE ON LEFT SIDE OF DRIVEWAY | |||
| BLD - BUILDING FINAL | 10/13/2016 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Repair outlet in guest bedroom/Vacume breakers at hose bibs/Weather stripping at garage door into house/Label GFI outlets in garage/Expansion tank or valve at water heater/Display insulation certificate | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 10/04/2016 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. FINAL SURVEY ON SITE. | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 09/30/2016 | Disapproved -FEE REQUIRED | CTROHA |
| Note: THIS IS A REINSPECTION MISSING DOCUMENTS: FINAL SURVEY + SWALE PLAN | |||
| FINAL SURVEY (OFFICE USE ONLY) | 09/28/2016 | APPROVED | DREWIS |
| ELECTRIC - EARLY POWER | 09/08/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: spoke to dell fpl released early power 2:00 | |||
| U - SEWER TIE IN | 09/07/2016 | APPROVED | MBACON |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 08/31/2016 | Disapproved -FEE REQUIRED | CTROHA |
| Note: 22 7. Missing documentation: CAN NOT DO INSPECTION WITHOUT FINAL SURVEY ON SITE | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 08/30/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 08/26/2016 | APPROVED - AS NOTED | CTROHA |
| Note: MUST HAVE A MINIMUM OF 36" FLARES ***RECHECK BEFORE YOU POUR*** THEN YOU WILL BE READY TO POUR It is the BUILDER'S RESPONSIBILITY to recheck elevations and pipe size and to insure that an obstruction does not exist upstream and or downstream PRIOR to placement of concrete. | |||
| PROJECT STATUS (OFFICE USE) | 08/25/2016 | APPROVED | CTROHA |
| Note: JONNY COPSEY CALLED ME TO LOOK AT A SWALE PLAN THAT DIDN'T MATCH UP. AFTER INVESTIGATING THIS ISSUE WE FOUND THERE WAS AN ERROR WITH THE BENCH MARK. I HAD JOHN HOWARD CORRECT THIS AND ISSUE A NEW SWALE PLAN. I WENT OUT ON SITE WITH THE CONTRACTOR AND COPSEY'S CREW TO SHOOT SOME GRADES AND DOUBLE CHECK GRADES AGAINST CHUCK'S FIELD NOTES WE SET THE CULVERT PIPE TO THE CORRECT INVERT | |||
| U - SEWER TIE IN | 08/01/2016 | APPROVED | MBACON |
| LATH/BRICK/ WATER BARRIER | 07/25/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 07/15/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 07/12/2016 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 7/12/2016 1:35:59 PM NOT READY FOR INSPECTION.WORK INCOMPLETE | |||
| LATH/BRICK/ WATER BARRIER | 07/08/2016 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 7/8/2016 11:00:38 AM ENTRY JAMBS NOT TAPED OR LATHED | |||
| ALL ROUGH | 07/07/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 07/05/2016 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 7/5/2016 1:59:06 PM NO PRESSURE TEST ON SUPPLY SIDE/NO HEAD TEST ON SANITARY LINES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/10/2016 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/31/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| TIE BEAM / LINTEL | 05/18/2016 | APPROVED | DROCKWELL |
| MONOLITHIC SLAB | 05/12/2016 | APPROVED | DROCKWELL |
| GRAVITY SEWER TEST | 05/10/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/10/2016 | APPROVED | DREWIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/10/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/09/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/9/2016 12:10:07 PM 10FT HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.4 | |||
| GRAVITY SEWER TEST | 05/09/2016 | Disapproved - NO FEE | LMILLER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 5/9/2016 12:10:07 PM 10FT HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.4 AND MUST PASS FIERST ROUGH PLUMBING PRIOR | |||
| GRAVITY SEWER TEST | 05/06/2016 | Disapproved - NO FEE | LMILLER |
| Note: Inspection Resulted at 5/6/2016 12:37:49 PM 10’ HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.4 ALSO PLUMBING FIRST ROUGH MUST OASS PRIOR TO THIS INSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/06/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 5/6/2016 12:37:50 PM SLEEVES… PIPES PASSING THROUGH FOUNDATION WALLS P2603.4 SLEEVES… (SLEEVES MUST BE 2 PIPE SIZES GREATER THAN THE PIPE PASSING THROUGH THE WALL. 10’ HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.4 UNCOVER WORK TO BE INSPECTED..FBC...P2503.2 (NEED TO BE ABLE TO SEE FITTINGS AND CONNECTIONS | |||
| STEM WALL FOUNDATION | 04/26/2016 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/27/2016 | 09/28/2016 |
| Note: Released By: DREWIS FINAL S | |||
| SW1 | COMPLETE | 05/10/2016 | 05/10/2016 |
| Note: Released By: DREWIS foundation survey | |||
| ZON | COMPLETE | 03/23/2016 | 03/24/2016 |
| ZON | HOLD | 03/21/2016 | 03/21/2016 |
| Note: REPEAT COMMENT: 2. Stucco banding is required around all doors and windows facing the public right of way. | |||
| BLD | COMPLETE | 03/10/2016 | 03/11/2016 |
| ELEC | COMPLETE | 03/10/2016 | 03/10/2016 |
| ENGIN1 | COMPLETE | 03/10/2016 | 03/16/2016 |
| MECH | COMPLETE | 03/10/2016 | 03/11/2016 |
| PLUM | COMPLETE | 03/10/2016 | 03/11/2016 |
| SW1 | COMPLETE | 03/10/2016 | 03/10/2016 |
| UD1 | COMPLETE | 03/10/2016 | 03/14/2016 |
| Note: See Notes | |||
| ZON | HOLD | 03/10/2016 | 03/10/2016 |
| Note: 1. Foundation plantings are required along side of home facing the public right of way. 2. Banding is required around all doors and windows facing the public right of way. | |||
| URB | COMPLETE | 03/10/2016 | 03/10/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/21/2016 |
| REINSPECTION FEE | ¤40.00 | 10/21/2016 |
| REINSPECTION FEE | ¤40.00 | 10/21/2016 |
| REINSPECTION FEE | ¤40.00 | 10/21/2016 |
| REINSPECTION FEE | ¤40.00 | 10/21/2016 |
| REINSPECTION FEE | ¤40.00 | 10/21/2016 |
| REINSPECTION FEE | ¤40.00 | 10/21/2016 |
| REINSPECTION FEE | ¤40.00 | 10/21/2016 |
| REINSPECTION FEE | ¤40.00 | 10/21/2016 |
| REINSPECTION FEE | ¤40.00 | 10/21/2016 |
| REINSPECTION FEE | ¤40.00 | 10/21/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤614.00 | 03/30/2016 |
| SITE PLAN 20 | ¤20.00 | 03/30/2016 |
| SURCHARGE FS 533.721 | ¤22.68 | 03/30/2016 |
| SURCHARGE - FS 468.631 | ¤22.68 | 03/30/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/30/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 03/30/2016 |
| ADMIN FEE | ¤20.00 | 03/30/2016 |
| ELECTRIC FEE | ¤244.20 | 03/30/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 03/30/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 03/30/2016 |
| IMPACT FEE PARKS | ¤849.24 | 03/30/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/30/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 03/30/2016 |
| MECHANICAL FEE | ¤244.20 | 03/30/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/30/2016 |
| PLAN CHECK FEE | ¤122.80 | 03/30/2016 |
| PLUMBING FEE | ¤244.20 | 03/30/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,735.87 |