I want to search for...
Permit #2016030534
Permit Details
Status: COED
| Parcel Id: 48-11-31-1700-00000-0200 |
| CONDITIONED SPACE: 3549 sqft |
| GARAGE: 780 sqft |
| OPENED PORCH (WITH ROOF) : 787 sqft |
| OPENED PORCH (WITH ROOF) : 85 sqft |
| Total Square Footage: 5201 sqft |
| Block: 00000 |
| Subdivision: 2086 - ESTATES AT GRAND HAVEN PHASE I |
| Job Phone: 386-445-4747 |
| Location Address: 19 NATIVE OAK CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/31/2016 |
| NOC: RECORDED |
| Applicant name: WILLIAM VALENTINE GROFF |
| Owner: JENNINGS, KAREN K |
|
Address TRUSTEE GRATHAM, NH 03753 |
|
Address PO BOX 738 GRATHAM, NH 03753 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤371,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
OCEANSIDE HOMES & REMODELING LLL
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
4440 N OCEANSHORE BLVD SUITE 101 PALM COAST, FL 32137 |
CBC1256262 (Exp: 08/31/2020) | 386-445-4747 | 386-445-5955 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32136 |
CAC048127 (Exp: 08/31/2018) | 386-445-5023 | 386-446-4614 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
GEORGE F AYLSWORTH JR
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
2680 S US HIGHWAY 17 CRESCENT CITY, FL 32112 |
00714 (Exp: 08/31/2021) | 386-698-1033 | 386-698-1077 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 06/21/2017 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 06/20/2017 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: per contractor Only 1 sewer cleanout is required,please cut,cap and bury the 4inch cleanout ,the 6inch cleanout is perferred. | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 06/19/2017 | APPROVED | RGROSS |
| Note: APPROVED | |||
| ROW FINAL | 06/19/2017 | APPROVED | RGROSS |
| Note: APPROVED | |||
| BLD - BUILDING FINAL | 06/14/2017 | FINAL APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 06/13/2017 | CANCELLED BY APPLICANT | DROCKWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 05/16/2017 | APPROVED | FREODICA |
| ELECTRIC - EARLY POWER | 04/25/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:00 | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 04/04/2017 | APPROVED - AS NOTED | CTROHA |
| Note: THIS IS A REINSPECTION THE BASE IS IN PLACE AND COMPACTED NOTE: HEAVY RAIN AT TIME OF INSPECTION IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN COMPACTION AND MAKE AND CORRECTIONS BEFORE LAYING PAVERS | |||
| U - SEWER TIE IN | 02/20/2017 | APPROVED | JNICHOLS |
| GRAVITY SEWER TEST | 02/20/2017 | APPROVED | CMINI |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 02/17/2017 | PARTIALLY APPROVED | GLALIMA |
| Note: WILL HAVE TO CALL IN A PRE POUR WHEN PAVER BASE IS ON SITE. READY TO POUR CONCRETE | |||
| LATH/BRICK/ WATER BARRIER | 10/31/2016 | APPROVED | LMILLER |
| INSULATION | 09/28/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 09/27/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION REVISED ENERGY CALCS CALL FOR R-38 UNDER ATTIC (R-30 BATTS USED) DEPTH MARKERS (FOR BLOWN OR SPRAYED INSULATION) R303.1.1.2.1 | |||
| INSULATION | 09/26/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: GAS PRESSURE AND BONDING OK..... BAFFLES REQUIRED 26 IN ACCORDANCE WITH FBC ENERGY CONSERVATION R303.2.1 AND MANUFACTURER SPECS. (CHANGES IN CEILING HIGHT). ALSO MASTER SHOWER DROP NEEDS BATTS (NO ACCESS AFTER CEILING IS INSTALLED) | |||
| ALL ROUGH | 09/19/2016 | APPROVED - AS NOTED | LMILLER |
| Note: WILL CHECK FOR GAS BONDING AND PRESSURE TEST ON INSULATION INSPECTION (TAG WITH PRESSURE APPLIED FOR INSPECTION) | |||
| ELECTRIC-TUG | 08/03/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED TUG 3:25 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/01/2016 | APPROVED | CMINI |
| ROOF SHEATHING | 07/22/2016 | APPROVED - AS NOTED | LMILLER |
| Note: OK TO COVER KNEE WALL AT FRONT ENTRY, ALL STTRAPS AND TIES IN THAT AREA WERE OBSERVED AT THIS INSPECTION | |||
| TIE BEAM / LINTEL | 06/16/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 06/15/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 6/15/2016 12:14:00 PM DOWN CELLS R609.1.4, ALL CELLS CONTAINING REINFORCEMENT SHALL BE GROUTED SOLID (CLEAN OUT SOIL AND DEBRIS FROM DOWNCELLS)..... OVERBEND DOWEL BAR FBC R606.13.3 EXCEPTION….. WITH A VERTICAL CELL NOT MORE THAN 1†OF HORIZONTAL DISPLACEMENT TO 6†OF VERTICAL BAR LENGTH (BACK PORCH MIDDLE COLLUMN, FRONT ENTRY COLLUMNS)..... | |||
| ELEV CERT-FOUNDATION APPROVAL | 06/15/2016 | APPROVED | DRAMIREZ |
| Note: Per Denise Bevan and my review all looks good to release. | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/14/2016 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 05/26/2016 | APPROVED - AS NOTED | LMILLER |
| Note: Inspection Resulted at 5/26/2016 10:30:58 AM OBTAIN REVISION TO SHOW PROPER DETAILS FOR FOOTINGS IN LOCATIONS WITH RAISED WALL BY ALL ROUGH. (CONTRACTOR STATES THAT HEY ARE BUILT CORRECTLY BUT PLANS HAVE A DEFFERENT DETAIL MARKED AT THESE LOCATIONS, CONTRACTOR MAY POUR AT HIS RISK HOWEVER, PLANS MUST MATCH CONDITIONS B Y ALL ROUGH). | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/24/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/28/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspection Resulted at 4/28/2016 12:27:39 PM INCOMPLETE INSPECTION, CONDITIONS AT SITE DO NOT MATCH APPROVED PLANS, (WALLS MOVED, PLUMBING MOVED, PLUMBING ADDED, ETC INSPECTION STOPPED NEED REVISION..) (10 FOOT OF HEAD PASSED, WATER PRESSURE TEST PASSED), OBTAIN APPROVED REVISION |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 05/16/2017 | 05/17/2017 |
| SW1 | COMPLETE | 05/15/2017 | 05/16/2017 |
| Note: Released By: FREODICA final s | |||
| BLD | COMPLETE | 06/22/2016 | 06/23/2016 |
| PLFM | COMPLETE | 06/14/2016 | 06/15/2016 |
| Note: Per Denise Bevan and my review elevation cert is good. | |||
| SW1 | COMPLETE | 06/13/2016 | 06/14/2016 |
| Note: Released By: DREWIS foundation s | |||
| BLD | COMPLETE | 06/06/2016 | 06/13/2016 |
| ZON | COMPLETE | 05/20/2016 | 05/20/2016 |
| SW1 | COMPLETE | 05/20/2016 | 05/20/2016 |
| MECH | COMPLETE | 05/20/2016 | 05/20/2016 |
| Note: Revision: changed energy calculations due to change in energy use from gas to electric water heater. | |||
| MECH | COMPLETE | 05/20/2016 | 05/20/2016 |
| Note: Released By: FREODICA Revision: changed energy calculations due to chnage from gas water heater to electric. | |||
| SW1 | COMPLETE | 05/19/2016 | 05/20/2016 |
| Note: Released By: DREWIS | |||
| ZON | COMPLETE | 05/19/2016 | 05/20/2016 |
| Note: Released By: TCHILDS | |||
| PLUM | COMPLETE | 05/19/2016 | 05/20/2016 |
| Note: Revision: changed water heater from gas to electric, enlarged shower at master bathroom & relocated sink. | |||
| ELEC | COMPLETE | 05/19/2016 | 05/19/2016 |
| BLD | COMPLETE | 05/19/2016 | 05/19/2016 |
| PLUM | COMPLETE | 03/29/2016 | 03/29/2016 |
| ELEC | COMPLETE | 03/29/2016 | 03/29/2016 |
| MECH | COMPLETE | 03/23/2016 | 03/24/2016 |
| BLD | COMPLETE | 03/23/2016 | 03/28/2016 |
| PLUM | HOLD | 03/23/2016 | 03/24/2016 |
| Note: The pipe size 3/4 inch CSST serving water heater with 200,000 BTUH at 65 ft does not comply with FBCFG 5th edition,Table 402.4(32). F.N.Reodica -386-986-4734. | |||
| ELEC | HOLD | 03/23/2016 | 03/24/2016 |
| Note: GFCIs need to be added to long kitchen counter top per NEC 2011 210.52 C. -DC. Rewis 986-4736 | |||
| BLD | HOLD | 03/17/2016 | 03/17/2016 |
| Note: 1. Provide the roof truss layout from the truss engineer. 5th ed. FBC 107.3.5.J. Hindman 986-3784. | |||
| ELEC | HOLD | 03/17/2016 | 03/17/2016 |
| Note: Please provide a sign and sealed copy of electrical floor plan or electrical contractor signature accompanied by license number on submitted copy. Please add a GFCI to master bathroom vanity, NEC 2011 210.52 D. -DC. Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 03/17/2016 | 03/17/2016 |
| Note: Road is designed with curb and gutter. No swale plan is required. | |||
| MECH | HOLD | 03/17/2016 | 03/18/2016 |
| Note: Conditioned floor area (4245 SF) on energy calculations does not match with those area shown on floor plan (3549 SF). Coordinate for clarity per FBC 5th ed. 107.2.1. F.N.Reodica -386-986-4734. | |||
| PLUM | HOLD | 03/17/2016 | 03/17/2016 |
| Note: 1. Provide the gas consumption in BTU/hr of gas water heater to verify the required pipe size on gas riser diagram per FBCFG 5th ed. 402. F.N.Reodica - 386-986-4734. 2. Provide the size and location of gas tank and specify if it is aboveground or underground per FBC 5th ed. 107.2.1/NFPA 58 ch 6. F.N.Reodica -386-986 -4734. | |||
| SW1 | COMPLETE | 03/17/2016 | 03/17/2016 |
| UD1 | COMPLETE | 03/17/2016 | 03/17/2016 |
| Note: See Notes | |||
| ZON | COMPLETE | 03/17/2016 | 03/18/2016 |
| PLFM | COMPLETE | 03/17/2016 | 03/17/2016 |
| URB | COMPLETE | 03/17/2016 | 03/18/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/20/2017 |
| REINSPECTION FEE | ¤40.00 | 06/12/2017 |
| REINSPECTION FEE | ¤40.00 | 06/12/2017 |
| REINSPECTION FEE | ¤40.00 | 06/12/2017 |
| REINSPECTION FEE | ¤40.00 | 06/12/2017 |
| REVISION | ¤40.00 | 06/12/2017 |
| REVISION | ¤40.00 | 06/12/2017 |
| REVISION | ¤40.00 | 06/12/2017 |
| REVISION | ¤40.00 | 06/12/2017 |
| SITE PLAN 20 | ¤20.00 | 03/31/2016 |
| SURCHARGE FS 533.721 | ¤32.53 | 03/31/2016 |
| SURCHARGE - FS 468.631 | ¤32.53 | 03/31/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/31/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤85.71) | 03/31/2016 |
| ADMIN FEE | ¤20.00 | 03/31/2016 |
| ELECTRIC FEE | ¤336.60 | 03/31/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤5.84) | 03/31/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤194.56 | 03/31/2016 |
| IMPACT FEE PARKS | ¤776.46 | 03/31/2016 |
| IMPACT FEE SCHOOL | ¤3,291.48 | 03/31/2016 |
| IMPACT FEE TRANSPORTATION | ¤2,856.89 | 03/31/2016 |
| MECHANICAL FEE | ¤336.60 | 03/31/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤23.29) | 03/31/2016 |
| PLAN CHECK FEE | ¤184.40 | 03/31/2016 |
| PLUMBING FEE | ¤336.60 | 03/31/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤922.00 | 03/31/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,665.81 |