I want to search for...
Permit #2016030753
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7004-00050-0230 |
| Block: 00050 |
| Subdivision: 2203 - SECTION 4-COUNTRY CLUB COVE |
| Job Phone: 386-437-3122 |
| Location Address: 20 CLEARVIEW CT N |
| Type: PA - PATIO/SLAB (STRUCTURAL) |
| Issue Date: 04/01/2016 |
| NOC: Unknown |
| Applicant name: TERRY MARTIN MCNITT JR |
| Owner: HATTEN, ASHLEY & JANA D |
|
Address 20 N CLEARVIEW CT PALM COAST, FL 32137 |
| Lot: 0230 |
| Contracted Stated Job Value: ¤2,300.00 |
| Job Description: PAVER PATIO & WALKWAY |
| Type: CN |
Contractor
VERDEGO LLC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 789 BUNNELL, FL 32110 |
CGC1506752 (Exp: 08/31/2026) | 386-437-3122 | 386-437-6883 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL - BUILDING MISC | 04/21/2016 | FINAL APPROVED | LMILLER |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 03/29/2016 | 03/31/2016 |
| ZON | HOLD | 03/23/2016 | 03/24/2016 |
| Note: 1. Paver patio cannot encroach into the 7.5' side setback. 2. REQUIRED PLANTINGS: Foundation shrubbery plantings are required along the side and/or rear of the patio and/or deck that faces a fresh or saltwater canal, lake, golf course, or public right-of-way. (LDC, Subsection 11.03.02.C.2.b) Foundation shrubs shall be in a 3-gallon container. Required foundation shrubs must be evergreen and freeze tolerant. Foundation shrubs are to be placed every 3-4 feet on center. (LDC, Subsection 11.03.05.C Table 11-3) REQUIRED PLANTINGS ALONG THE FRONT OF A RESIDENCE: Residential lots shall provide foundation plantings along the front of the house to achieve sixty percent (60%) opacity within two (2) years. (LDC, Subsection 11.03.02.C.2.a) | |||
| BLD | COMPLETE | 03/23/2016 | 03/23/2016 |
| SW1 | COMPLETE | 03/23/2016 | 03/23/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 04/01/2016 |
| INSPECTION 40 | ¤40.00 | 04/01/2016 |
| SITE PLAN 20 | ¤20.00 | 04/01/2016 |
| SURCHARGE FS 533.721 | ¤2.00 | 04/01/2016 |
| SURCHARGE - FS 468.631 | ¤2.00 | 04/01/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤84.00 |