I want to search for...

Permit #2016030967

Permit Details

Status: FINAL

Parcel Id: 13-11-30-0000-01020-0020
Block: 01020
Subdivision: 2129 - SECTION 17-BELLE TERRE
Job Phone: (386)734-2864
Location Address: 2 BOULDER ROCK DR
Type: SN - SIGN - WALL SIGN
Issue Date: 04/14/2016
NOC: Unknown
Applicant name: RAYMOND SCOTT POLLITT
Owner: FIRST COAST ENERGY LLP

Address

7014 AC SKINNER PKWY SUITE 290

JACKSONVILLE, FL 32256

Lot: 0020
Contracted Stated Job Value: ¤1,000.00
Job Description: (2) 4X4 "SHELL" INSIGNIA ON EXISTING CANOPY
Type: CN

Contractor

ALUMINUM PLUS
Status Location Address State License Number Phone Fax
INACTIVE

748 E. INTERNATIONAL SPEEDWAY BLVD

DELAND, FL 32724

CBC056832 (Exp: 08/31/2026) (386)734-2864 (386)736-7096

Inspection History

Type Request Date Result Inspector
FINAL 06/07/2016 FINAL APPROVED CMINI

Review History

Department Status Date In Date Out
ZON COMPLETE 04/08/2016 04/13/2016
BLD COMPLETE 03/30/2016 03/30/2016
ZON HOLD 03/30/2016 04/01/2016
Note: 1. Signage on gas station canopy structures may only be placed on canopy elevations where the canopy faces the right of way per LDC 12.05.02.C.3. Please remove the proposed sign from the elevation facing the store and relocate it to the elevation facing Palm Coast Parkway. 2. To install signage on the gas station canopy, the sign area must be transferred from the wall sign on the building to the gas station canopy per the requirements of LDC Section 12.05.02.C.3. Please provide a chart with a breakdown of the existing wall sign area on the principle building and demonstrate that the proposed signage plus the existing signage does not exceed the total allowable wall signage. Please refer to Table 12-1 in LDC Section 12.05.02.C for maximum wall signage allowed.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN COMMERCIAL ¤60.00 04/14/2016
INSPECTION - COMMERCIAL ACCESS ¤50.00 04/14/2016
ELECTRIC FEE ¤60.60 04/14/2016
PLAN CHECK FEE ¤100.00 04/14/2016
SITE PLAN 20 ¤20.00 04/14/2016
SURCHARGE FS 533.721 ¤3.66 04/14/2016
SURCHARGE - FS 468.631 ¤3.66 04/14/2016
Fees Total Due: ¤0.00 Total Paid: ¤297.92