I want to search for...
Permit #2016040730
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7034-00900-0090 |
| SCREEN PORCH (SOLID ROOF) : 448 sqft |
| Total Square Footage: 448 sqft |
| Block: 00900 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-503-0906 |
| Location Address: 27 ETHAN ALLEN DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 05/10/2016 |
| NOC: RECORDED |
| Applicant name: ANTHONY FALLONE |
| Owner: RAMSEY, CAROL & AUBREY BERNARD |
|
Address 27 ETHAN ALLEN DRIVE PALM COAST, FL 32164 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤22,000.00 |
| Job Description: 32' X 14' SUN ROOM ADDITION W/ALUMINUM INSULATED ROOF |
| Type: CN |
Contractor
FONTANA CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P.O. BOX 351222 PALM COAST, FL 32137 |
CBC1250596 (Exp: 08/31/2022) | 386-503-0906 | (386)986-1305 |
Sub Contractors
RICHARD R EDWARDS
| Status | Location Address | State License Number | Phone |
| CANCEL |
P. O. Box 1637 Bunnell, FL 32110 |
ER0011603 (Exp: 08/31/2022) | (386) 437-1537 |
FRANK E SEVERINO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1360 N NOVA RD DAYTONA BEACH, FL 32117 |
CBC060543 (Exp: 08/31/2026) | 386-253-1943 | 386-238-0139 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 01/11/2017 | FINAL APPROVED | DSPENCER |
| BLD - BUILDING FINAL | 08/16/2016 | FINAL APPROVED | DROCKWELL |
| Note: 2x2x1/8 angle roof hold-down not installes per plan.See section detail | |||
| BLD - BUILDING FINAL | 08/09/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: INCOMPLETE INSPECTION (ALL PAPERWORK IS SOAKED FROM WEATHER), NEED NEW PAPERWORK SO INSPECTION CAN BEE COMPLETED. ALSO APPROVED FINAL SURVEY MUST BE ONSITE AT TIME OF FINAL. EXTERIOR DOOR LIGHTS 26. EACH EXTERIOR DOOR SHALL HAVE A LIGHT AND SWITCH R 3903.3 (LIGHT BOX IS OPEN TO THE ELIMENTS AND LIGHT HAS NOT BEEN INSTALLED). GFCI 19S NEEDED, 210.8-A, ALL 120 VOLT SINGLE PHASE 15 AND 20 AMP RECEPTICLES INSTALLED IN LOCATIONS SPECIFIED IN 1 TROUGH 8 SHALL HAVE GFCI PROTECTION. (WITHIN 5ft OF POOL/HOT-TUB) METAL WINDOWS NEEDS TO BE BONDED .WITHIN 5 19 OF POOL OR SPAS INSIDE WALL.. NEC. 680.26 (7) | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/08/2016 | APPROVED | FREODICA |
| Note: Final survey also shows on foundation survey. | |||
| ALL ROUGH | 07/01/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 07/01/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 06/24/2016 | APPROVED | LMILLER |
| INSULATION | 06/22/2016 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 6/22/2016 11:06:53 AM ALL ROUGH MUST FIRST BE APPROVED.REVISE PLAN TO SHOW DELETED 240 OUTLET AND CHANGED TO 110 FOR A/C | |||
| FRAMING | 06/20/2016 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 06/20/2016 | Disapproved - NO FEE | DROCKWELL |
| Note: Inspection Resulted at 6/20/2016 11:23:54 AM PROVIDE WIRING FOR A/C UNIT AS PER PLAN | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/16/2016 | APPROVED | JHINDMAN |
| FRAMING | 06/14/2016 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 6/14/2016 9:34:46 AM PLANS CALL FOR A 2X2 CONTINUOS ANGLE ANCHORING ROOF TO FRAMING AROUND ENTIRE PERIMETER | |||
| LATH/BRICK/ WATER BARRIER | 05/27/2016 | CANCELLED BY INSPECTOR | DROCKWELL |
| Note: Inspection Resulted at 5/27/2016 10:07:59 AM NO INSPECTION AT THIS ADDRESS TODAY | |||
| MONOLITHIC SLAB | 05/24/2016 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 06/30/2016 | 07/05/2016 |
| BLD | COMPLETE | 06/30/2016 | 06/30/2016 |
| BLD | HOLD | 06/23/2016 | 06/23/2016 |
| Note: 1. Provide a signed and sealed drawing by the engineer of record for the structural change. You cannot use the AAF as this structure was designed by him. 5th ed. FBC 107.1 and state statute 471.003. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 06/23/2016 | 06/24/2016 |
| MECH | COMPLETE | 06/23/2016 | 06/23/2016 |
| Note: Revision: N/A | |||
| SW1 | COMPLETE | 06/16/2016 | 06/16/2016 |
| Note: Released By: JHINDMAN foundation s | |||
| MECH | COMPLETE | 05/06/2016 | 05/09/2016 |
| ELEC | COMPLETE | 04/28/2016 | 04/29/2016 |
| BLD | COMPLETE | 04/28/2016 | 05/02/2016 |
| MECH | HOLD | 04/28/2016 | 05/03/2016 |
| Note: Previous comment shall be addressed. Provide energy calculations, hvac contractor and manufacturer specification of hvac units to be installed per FBCEC 5th ed. R402/R405/FS 489. | |||
| MECH | HOLD | 04/21/2016 | 04/26/2016 |
| Note: Provide energy calculations, hvac contractor and manufacturer specification of hvac units to be installed per FBCEC 5th ed. R402/R405/FS 489. | |||
| BLD | HOLD | 04/20/2016 | 04/25/2016 |
| Note: 1. Provide the sunroom category type per the 5th edition of the Florida Building Code Residential 301.2.1.1.2.2 This is not the Risk Category that is shown on the plans. J. Hindman 986-3784.. | |||
| SW1 | COMPLETE | 04/20/2016 | 04/21/2016 |
| ZON | COMPLETE | 04/20/2016 | 04/21/2016 |
| ELEC | HOLD | 04/20/2016 | 04/21/2016 |
| Note: Please provide additional receptacles per NEC 2011 210.52. -DC. Rewis 986-4736 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/10/2017 |
| REINSPECTION FEE | ¤40.00 | 08/15/2016 |
| REINSPECTION FEE | ¤40.00 | 08/08/2016 |
| REINSPECTION FEE | ¤40.00 | 08/08/2016 |
| REVISION | ¤40.00 | 08/08/2016 |
| REVISION | ¤40.00 | 08/08/2016 |
| SITE PLAN 20 | ¤20.00 | 05/10/2016 |
| SURCHARGE FS 533.721 | ¤2.94 | 05/10/2016 |
| SURCHARGE - FS 468.631 | ¤2.94 | 05/10/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/10/2016 |
| ADMIN FEE | ¤20.00 | 05/10/2016 |
| ELECTRIC FEE | ¤73.20 | 05/10/2016 |
| PLAN CHECK FEE | ¤40.00 | 05/10/2016 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 05/10/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤519.08 |