I want to search for...
Permit #2016040948
Permit Details
Status: COED
| Parcel Id: 48-11-31-1700-00000-0170 |
| CONDITIONED SPACE: 3155 sqft |
| GARAGE: 560 sqft |
| SCREEN PORCH (SOLID ROOF) : 378 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 4153 sqft |
| Block: 00000 |
| Subdivision: 2086 - ESTATES AT GRAND HAVEN PHASE I |
| Job Phone: 386-947-4481 |
| Location Address: 105 WILLOW OAK WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/09/2016 |
| NOC: RECORDED |
| Applicant name: ERIC CHRISTOPHER OLSEN |
| Owner: ROLLE, ROBERT P & SUSAN E |
|
Address 171 BROOKHAVEN CT PALM COAST, FL 32164 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
OLSEN CUSTOM HOMES AND CONSULTING INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
CGC1508852 (Exp: 08/31/2026) | 386-947-4481 | (386)947-4484 |
Sub Contractors
BENJAMIN EDWARD SMITH
| Status | Location Address | State License Number | Phone |
| CANCEL |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13004288 (Exp: 08/31/2016) | 386-265-2687 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32136 |
CAC048127 (Exp: 08/31/2018) | 386-445-5023 | 386-446-4614 |
JOHN BRADLEY WINFREY JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1685 S. CLARA AVE Deland, FL 32720 |
CFC054901 (Exp: 08/31/2026) | 386-734-0154 | 386-734-2751 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 03/13/2017 | FINAL APPROVED | DSPENCER |
| Note: the utility department may still need to adjust the meters however i will not hold the final for that issue they can follow up on later. the 6" cleanout cap is not approved type must be flush slotted type. the one used iis now a 2" nut cap inverted upside down. After doing more research i found that the mfg has changed the style of the cap the old type is currently unavailable. i apoligize for the inconvience. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/10/2017 | Disapproved -FEE REQUIRED | DSPENCER |
| Note: THIS IS A REINSPECTION found no changes have been made to the original issues as noted below and the cleanout body on the 6" is not the correct size for the pipe and must be replaced with the correct size. some fill is needed to make the grade flush with the meter pit. utilities is looking into the meters to see if the relocation will be required. Failed inspection the reclaim meter is less than a foot from the drive and the potable less than 2 19. Notes added to inspection were. 1. the 4" sewer cleanout next the drive must be cut and capped below grade. 2. the 6" cleanout cap must be a flush slotted cap set at grade. not an inverted 2" nut cap 3. the reuse water meter and potable water meters cannot be closer than 4.5' to the drive way per city standards as noted on the building permit and the builder should have contacted and requested them both be moved by the utility department which is what needs to be done now. the decision for the meters is the Utility departments if any exceptions will be made. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/09/2017 | Disapproved -FEE REQUIRED | DSPENCER |
| Note: Utility department has been notified. Failed inspection the reclaim meter is less than a foot from the drive and the potable less than 2 19. 1. the 4" sewer cleanout next the drive must be cut and capped below grade. 2. the 6" cleanout cap must be a flush slotted cap set at grade. not an inverted 2" nut cap 3. the reuse water meter and potable water meters cannot be closer than 4.5' to the drive way per city standards as noted on the building permit and the builder should have contacted and requested them both be moved by the utility department which is what needs to be done now. the decision for the meters is the Utility departments if any exceptions will be made. | |||
| BLD - BUILDING FINAL | 03/08/2017 | FINAL APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 03/07/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Revision for kitchen not yet available | |||
| BLD - BUILDING FINAL | 03/06/2017 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. REVISION FOR KITCHEN COUNTER AND COUNTER ELECTRIC REQUESTED BY FINAL AT FIRST ALL-ROUGH INSPECTION STILL NEEDED. 2. WORKING SPACE for electric equipment 26. E3405.2 36in. MINIMUM DEPTH AND 30in. MINIMUM WIDTH OR THE WIDTH OF THE EQUIPMENT (WICH EVER IS GREATER) (BOTH CONDENSORS) 3. HOLES IN CEILING MUST BE SEALED: R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) (AT CONDUIT AND DUCTS) | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 03/03/2017 | APPROVED | GLALIMA |
| ROW FINAL | 03/03/2017 | APPROVED - AS NOTED | GLALIMA |
| Note: IF THE RIGHT FRONT CORNER THAT IS LOW, BECOMES AN DRAINAGE ISSUE IT WILL BE UP TO THE BUILDER TO REPAIR. LEFT SIDE DRAINAGE WILL BE ADDRESSED AT POOL R.O.W / FINAL . | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/02/2017 | APPROVED | FREODICA |
| Note: THIS IS A REINSPECTION Field verified by G. Lalima | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 03/01/2017 | CANCELLED BY INSPECTOR | CTROHA |
| Note: THIS IS A REINSPECTION REVIEWING FINAL SURVEY | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 02/16/2017 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: NO APPROVED FINAL SURVEY , THE FINAL SURVEY MUST SHOW ALL SET BACKS AND EASEMENTS ON PROPERTY AS WELL AS ELEVATIONS EVERY 20' FEET . PROPERTY PINS NEED TO BE LOCATED AND IN PLACE . I HAVE MY LAST SITE MEET WITH HOME TOMORROW AT 10:00 TO GO OVER WHAT GRANHAVEN HAS ALL READY TOLD HIM. SOPKE WITH POOL BUILDER AND HE WILL DO FINAL GRADE. CAN NOT FINAL DRIVEWAY UNTIL THE FINAL SURVEY IS APPROVED AND ON SITE | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/16/2017 | Disapproved - NO FEE | FREODICA |
| Note: 1. Drainage flow shall match with prposed plan. 2. Provide grading elevations at 20 foot intervals along the property line and at 10 foot offset to adjacent properties.. 3. Drainage flow to the ditch at left side of the house.is not allowed. | |||
| ELECTRIC - EARLY POWER | 12/14/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:05 | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 12/12/2016 | APPROVED | CTROHA |
| Note: READY TO POUR | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 12/09/2016 | Disapproved -FEE REQUIRED | CTROHA |
| Note: THIS IS A REINSPECTION FLARES DO NOT MEET REQUIREMENTS SEE DETAIL SHEET | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 12/08/2016 | CANCELLED BY APPLICANT | GLALIMA |
| Note: BUILDER CALLED AND CANCELLED 9:03A:M | |||
| INSULATION | 10/28/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 10/25/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: MUST HAVE ENERGY CALCS ON SITE FOR THIS INSPECTION | |||
| ALL ROUGH | 10/21/2016 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION. bath duct off of fan, reconnect.. low voltage nail plates not complete. window in bathroom not screwed in. | |||
| LATH/BRICK/ WATER BARRIER | 10/21/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| TRACK BOLT | 10/17/2016 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 10/17/2016 | Disapproved -FEE REQUIRED | CMINI |
| Note: not ready, front door area and wood exposed at mitered window | |||
| ALL ROUGH | 10/05/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. NAIL PLATES ON LOW VOLTAGE THROUGHOUT AND AT KITCHEN COUNTER SINK HALF WALL NAIL PLATES ON ELECTRIC FBC E3802.1 2. MISSING ELECTRIC BOXES AND WIRING OUT OF WALL DUE TO MISSING DOOR BUCKS AND MISSING SLIDER FRAMING. 3. MISSING FRAMING (BOX OUT ABOVE ELECTRIC PANEL) 4. MULLION SHIMS, SHIM WINDOW MULLIONS IN ACCORDANCE WITH FBC 612.7.2.1 AND MANUFACTURER INSTALLATION SPECS (NO MORE THAN .25 inch GAP AND SHIMMED). OR PROVIDE SPECS FOR INSTALATION METHOD USED. 5. NAIL PLATES FOR PLUMBING AT TOP PLATES IN GARAGE AND WAGTER SUPPLY IN MASTER SHOWER AND BATH TUB NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. 6.10ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1), 7. CALL IN SEPARATE INSPECTION FOR FIXED GLASS AND SLIDER FRAMING (TRACK INSPECTION) *. NEED REVISION BY FINAL FOR KITCHEN COUNTER (PLAN SHOWS MULTY LEVEL COUNTER, ELECTRIC IS INSTALLED FOR FLAT TOP) CORRECT ELECTRIC TO MATCH PLANS OR OBTAIN APPROVED REVISION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/29/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/08/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION INCOMPLETE INSPECTION, NOT READY, ROOF SHEATHING PASSED, DOWN CELLS PASSED, NEED TO CHECK ALL BRACES, TIES, AND BEARING. (NOT COMPLETE, STILL WORKING). | |||
| ELECTRIC-TUG | 09/08/2016 | APPROVED - AS NOTED | LMILLER |
| Note: TALKED TO SUSAN AT FPL | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/07/2016 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 9/7/2016 1:54:03 PM NO PLANS ENGINEERING ON JOB, | |||
| TIE BEAM / LINTEL | 08/18/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 08/17/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: CLEARANCE FROM MASONRY R606.13.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET OVERBEND DOWEL BAR FBC R606.13.3 EXCEPTION 26.. WITH A VERTICAL CELL NOT MORE THAN 1 1D OF HORIZONTAL DISPLACEMENT TO 6 1D OF VERTICAL BAR LENGTH. (SEVERAL AREAS, CIRCLED ON FOUNDATION SHEET. OB- INDICATES OVER BEND, C- INDICATES CLEARANCE) | |||
| ELEV CERT-FOUNDATION APPROVAL | 08/16/2016 | APPROVED | DBEVAN |
| GRAVITY SEWER TEST | 08/11/2016 | FINAL APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 08/11/2016 | APPROVED | JNICHOLS |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 08/10/2016 | CANCELLED BY APPLICANT | MBACON |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 08/10/2016 | CANCELLED BY APPLICANT | CMINI |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 08/04/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: UNCOVER WORK TO BE INSPECTED..FBC...P2503.2 10ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.4, | |||
| U - SEWER TIE IN | 08/04/2016 | Disapproved - NO FEE | JNICHOLS |
| Note: the sewer tap was buried. it needs to be exposed so that we can see the connection. | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/02/2016 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 07/18/2016 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/12/2016 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 03/09/2017 | 03/09/2017 |
| ELEC | COMPLETE | 03/08/2017 | 03/08/2017 |
| SW1 | COMPLETE | 02/27/2017 | 03/02/2017 |
| Note: Released By: FREODICA final survey Field verified by Gary Lalima. | |||
| PLFM | COMPLETE | 02/15/2017 | 02/15/2017 |
| Note: No comments at this stage. | |||
| SW1 | HOLD | 02/14/2017 | 02/16/2017 |
| Note: Held By: FREODICA final s 1. Drainage flow shall match with prposed plan. 2. Provide grading elevations at 20 foot intervals along the property line and at 10 foot offset to adjacent properties.. 3. Drainage flow to the ditch at left side of the house.is not allowed. | |||
| PLFM | COMPLETE | 08/16/2016 | 08/16/2016 |
| PLFM | HOLD | 08/15/2016 | 08/15/2016 |
| Note: Section A9(a) requires a sq. ft. calculation. A garage elevation is indicated in Section C2(d). Please note that A9(a) reflected a “560” sq. ft. calculation on the previously submitted elevation certificate. Please also note that measurement used for “N/A” entries for Section C2(a) – C2(f) can be deselected for each type. | |||
| PLFM | HOLD | 08/02/2016 | 08/03/2016 |
| Note: Held By: DBEVAN The first elevation certificate (Construction Drawings) indicated a 1A construction for Section A7. On the elevation certificate (Building Under Construction) being reviewed, Section A7 notes a 1B (stem wall) construction. Confirm the correct Building Diagram Number. | |||
| BLD | COMPLETE | 05/23/2016 | 05/24/2016 |
| URB | COMPLETE | 05/06/2016 | 05/06/2016 |
| ELEC | COMPLETE | 05/06/2016 | 05/06/2016 |
| PLFM | COMPLETE | 05/06/2016 | 05/06/2016 |
| MECH | COMPLETE | 05/06/2016 | 05/09/2016 |
| PLFM | HOLD | 04/28/2016 | 05/02/2016 |
| Note: For Section B9, the elevation shall be indicated to the tenths. For example, “ 9.0’ ” would be found acceptable. | |||
| BLD | COMPLETE | 04/28/2016 | 05/02/2016 |
| ELEC | HOLD | 04/28/2016 | 04/29/2016 |
| Note: Provide: Code to be referenced. Location of panel to determine if disconnects are needed per NEC 2011 422 & 440.14. -DC. Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 04/28/2016 | 04/28/2016 |
| MECH | HOLD | 04/28/2016 | 05/02/2016 |
| Note: 1. Provide balanced return air from craft room per FBCR 5th ed. M1602.4. 2. Insulation R-value of adjacent exterior wood frame wall (item 9b) of energy calculation shall be updated to R-13 to comply with FBCEC 5th ed. T-R402.1.1. F.N.Reodica-386-986-4734. | |||
| PLUM | COMPLETE | 04/28/2016 | 05/02/2016 |
| SW1 | COMPLETE | 04/28/2016 | 04/29/2016 |
| UD1 | COMPLETE | 04/28/2016 | 05/02/2016 |
| ZON | COMPLETE | 04/28/2016 | 04/28/2016 |
| URB | HOLD | 04/28/2016 | 04/28/2016 |
| Note: Lots over 1/2 acre require submittal of an Irrigation Plan | |||
| SW1 | COMPLETE | 08/02/2016 | |
| Note: Released By: DREWIS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/13/2017 |
| REINSPECTION FEE | ¤40.00 | 03/10/2017 |
| REINSPECTION FEE | ¤40.00 | 03/09/2017 |
| REINSPECTION FEE | ¤40.00 | 03/08/2017 |
| REINSPECTION FEE | ¤40.00 | 03/08/2017 |
| REINSPECTION FEE | ¤40.00 | 03/08/2017 |
| REINSPECTION FEE | ¤40.00 | 03/08/2017 |
| REINSPECTION FEE | ¤40.00 | 03/08/2017 |
| REINSPECTION FEE | ¤40.00 | 03/08/2017 |
| REINSPECTION FEE | ¤40.00 | 03/08/2017 |
| REINSPECTION FEE | ¤40.00 | 03/08/2017 |
| REINSPECTION FEE | ¤40.00 | 03/08/2017 |
| REINSPECTION FEE | ¤40.00 | 03/08/2017 |
| REINSPECTION FEE | ¤40.00 | 03/08/2017 |
| ADMIN FEE | ¤20.00 | 05/09/2016 |
| ELECTRIC FEE | ¤300.00 | 05/09/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 05/09/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 05/09/2016 |
| IMPACT FEE PARKS | ¤849.24 | 05/09/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/09/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 05/09/2016 |
| MECHANICAL FEE | ¤300.00 | 05/09/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 05/09/2016 |
| PLAN CHECK FEE | ¤160.00 | 05/09/2016 |
| PLUMBING FEE | ¤300.00 | 05/09/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤800.00 | 05/09/2016 |
| SITE PLAN 20 | ¤20.00 | 05/09/2016 |
| SURCHARGE FS 533.721 | ¤28.94 | 05/09/2016 |
| SURCHARGE - FS 468.631 | ¤28.94 | 05/09/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/09/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 05/09/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,258.99 |