I want to search for...
Permit #2016041053
Permit Details
Status: COED
| Parcel Id: 05-11-31-5918-00000-0290 |
| CONDITIONED SPACE: 3257 sqft |
| GARAGE: 992 sqft |
| SCREEN PORCH (SOLID ROOF) : 731 sqft |
| OPENED PORCH (WITH ROOF) : 166 sqft |
| Total Square Footage: 5146 sqft |
| Block: 00000 |
| Subdivision: 2244 - VILLAGE AT PALM COAST PH 1 |
| Job Phone: (386)445-2012 |
| Location Address: 111 LONGVIEW WAY N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/20/2016 |
| NOC: RECORDED |
| Applicant name: JOHN DONALD GORDON |
| Owner: PRETTYMAN, RONALD M |
|
Address 111 LONGVIEW WAY PALM COAST, FL 32137 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤500,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. Box 354786 Palm Coast, FL 32137 |
CGC062646 (Exp: 08/31/2020) | (386)445-2012 | (386)446-7928 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 03/03/2017 | FINAL APPROVED | JNICHOLS |
| ROW - FINAL INSPECTION | 03/02/2017 | APPROVED | CTROHA |
| BLD - BUILDING FINAL | 03/02/2017 | FINAL APPROVED | CMINI |
| ROW - FINAL APRON (AFTER POUR) | 03/02/2017 | APPROVED | CTROHA |
| GAS FINAL | 03/02/2017 | APPROVED | CMINI |
| FINAL SURVEY (OFFICE USE ONLY) | 03/01/2017 | APPROVED | JHINDMAN |
| GAS ROUGH | 02/23/2017 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| GAS ROUGH | 02/21/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION. burial depth. FBC2415.10 gas pressure loss. FBC.G2417.3.3 | |||
| GAS ROUGH | 02/16/2017 | CANCELLED BY APPLICANT | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 01/11/2017 | APPROVED | GLALIMA |
| Note: PASSED READY FOR PAVERS | |||
| ROW- PRE-APRON (PRE-POUR) | 12/14/2016 | PARTIALLY APPROVED | RGROSS |
| Note: PARTIAL APPROVAL. APPROVED FOR THE CONCRETE POUR IN THE ROW ONLY. PAVER DRIVEWAY. WILL NEED A SECOND PRE POUR BEFORE PAVERS ARE PLACED. | |||
| GRAVITY SEWER TEST | 11/29/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 11/22/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: NO WATER IN PIPE AT PIPE NEAR EXIT OF STRUCTURE 10ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 | |||
| U - SEWER TIE IN | 11/22/2016 | APPROVED | JNICHOLS |
| ELECTRIC - EARLY POWER | 11/14/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:00 | |||
| INSULATION | 09/06/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 09/02/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: MISSING INSULATION IN WALL BETWEEN GARAGE AND DWELLING, ALSO MISSING BETWEEN AC UNIT CLOSET AND DWELLING | |||
| ALL ROUGH | 08/25/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 08/25/2016 | APPROVED | CMINI |
| ALL ROUGH | 08/24/2016 | CANCELLED BY APPLICANT | DROCKWELL |
| ALL ROUGH | 08/23/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| WALL SHEATHING | 08/22/2016 | APPROVED | CMINI |
| GAS ROUGH | 08/22/2016 | PARTIALLY APPROVED | CMINI |
| Note: interior pressure, support of gas line. need to call a 2nd gas rough for tank, pipe burial and pressure when ready. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/08/2016 | APPROVED | CMINI |
| TRACK BOLT | 08/08/2016 | APPROVED | CMINI |
| ELECTRIC-TUG | 07/22/2016 | APPROVED - AS NOTED | CMINI |
| Note: called fpl to release power, left message with phone number. no answer on numerous times called | |||
| TIE BEAM / LINTEL | 07/14/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 07/13/2016 | CANCELLED BY APPLICANT | LMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 07/08/2016 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 06/28/2016 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/24/2016 | APPROVED | CMINI |
| STEM WALL FOUNDATION | 06/14/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| STEM WALL FOUNDATION | 06/13/2016 | CANCELLED BY APPLICANT | CMINI |
| FOOTER | 06/08/2016 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 02/28/2017 | 03/01/2017 |
| Note: Released By: JHINDMAN final s | |||
| ELEC | COMPLETE | 08/19/2016 | 08/22/2016 |
| MECH | COMPLETE | 08/09/2016 | 08/11/2016 |
| BLD | COMPLETE | 08/04/2016 | 08/08/2016 |
| SW1 | COMPLETE | 07/08/2016 | 07/08/2016 |
| Note: Released By: DREWIS foundtain survey | |||
| ZON | COMPLETE | 05/11/2016 | 05/12/2016 |
| PLUM | COMPLETE | 05/11/2016 | 05/12/2016 |
| MECH | COMPLETE | 05/11/2016 | 05/12/2016 |
| SW1 | COMPLETE | 05/11/2016 | 05/12/2016 |
| BLD | COMPLETE | 05/02/2016 | 05/04/2016 |
| ELEC | COMPLETE | 05/02/2016 | 05/04/2016 |
| ENGIN1 | COMPLETE | 05/02/2016 | 05/02/2016 |
| MECH | HOLD | 05/02/2016 | 05/05/2016 |
| Note: 1. Provide balanced return air from bedroom 4 per FBCR 5th ed. M1602.4. 2. Energy performance level (EPL) display card shall be signed by the builder per FBCEC 5th ed. R401.3. 3. The total cooling capacity of selected hvac units is less than the total calculated load and does not comply with FBCEC 5th ed. R403.1.1. F.N.Reodica - 386-986-4734. | |||
| PLUM | HOLD | 05/02/2016 | 05/04/2016 |
| Note: Provide material and delivery pressure from tank to regulator and delivery pressure after regulator to appliances to determine the pipe sizes per FBCFG 5th ed. 402. F.N.Reodica-386-986-4734. | |||
| SW1 | HOLD | 05/02/2016 | 05/04/2016 |
| Note: AC pad is encroaching the storm water easement. -DC. Rewis 986-4736 | |||
| UD1 | COMPLETE | 05/02/2016 | 05/06/2016 |
| Note: See Notes | |||
| ZON | HOLD | 05/02/2016 | 05/04/2016 |
| Note: 1. Left front corner of home appears to be encroaching side setback. 2. Per LDC 13.02.06.A.4 - Front entry doors are excluded from exterior color requirements EXCEPT for prohibited colors - any shade of purple, fuscia, magenta and orange that does not meet pastel requirements. | |||
| URB | COMPLETE | 05/02/2016 | 05/02/2016 |
| SW1 | COMPLETE | 05/04/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/01/2017 |
| REINSPECTION FEE | ¤40.00 | 03/01/2017 |
| REINSPECTION FEE | ¤40.00 | 03/01/2017 |
| REVISION | ¤40.00 | 03/01/2017 |
| REVISION | ¤40.00 | 03/01/2017 |
| SITE PLAN 20 | ¤20.00 | 05/20/2016 |
| SURCHARGE FS 533.721 | ¤35.33 | 05/20/2016 |
| SURCHARGE - FS 468.631 | ¤35.33 | 05/20/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/20/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 05/20/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,000.00 | 05/20/2016 |
| ADMIN FEE | ¤20.00 | 05/20/2016 |
| ELECTRIC FEE | ¤360.00 | 05/20/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.38) | 05/20/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤212.80 | 05/20/2016 |
| IMPACT FEE PARKS | ¤849.24 | 05/20/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/20/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 05/20/2016 |
| MECHANICAL FEE | ¤360.00 | 05/20/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 05/20/2016 |
| PLAN CHECK FEE | ¤200.00 | 05/20/2016 |
| PLUMBING FEE | ¤360.00 | 05/20/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,331.77 |