I want to search for...
Permit #2016050300
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-5112-00000-0100 |
| Block: 00000 |
| Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK |
| Job Phone: 386-238-1570 |
| Location Address: 6 COMMERCE BLVD |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 06/01/2016 |
| NOC: RECORDED |
| Applicant name: GARY LYNN ROBERTS |
| Owner: DESIGNS FOR HEALTH INC |
|
Address 980 SOUTH STREET SUFFELD, CT 06078 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤125,000.00 |
| Job Description: INTERIOR ALTERATIONS |
| Type: CN |
Contractor
COMMERCIAL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
7 SUNSHINE BLVD ORMOND BEACH, FL 32174 |
CGC059441 (Exp: 08/31/2026) | 386-238-1570 | 386-238-1571 |
Sub Contractors
MIKE F WHALEY
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
804 Root Street Daytona Beach, FL 32114 |
EC0001334 (Exp: 08/31/2026) | (386) 252-2287 | (386)257-1920 |
STEVEN KEITH JONES
| Status | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
345 MADISON AVE DAYTONA BEACH, FL 32114 |
CMC057027 (Exp: 08/31/2026) | (386)253-7774 | (386)255-9431 |
ISAAC WALTER JOHNSTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
887 BRENTWOOD DRIVE Daytona Beach, FL 32117 |
CFC023634 (Exp: 08/31/2026) | (386) 252-7047 |
Inspection History
| Type | Request Date | Result | Inspector |
| FIRE FINAL | 10/03/2016 | FINAL APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| U - UTILITY COMMERCIAL FINAL | 09/30/2016 | FINAL APPROVED | DSPENCER |
| ELECTRIC FINAL | 09/30/2016 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| BUILDING FINAL | 09/30/2016 | APPROVED | JHINDMAN |
| FIRE FINAL | 09/30/2016 | Disapproved - NO FEE | JHINDMAN |
| Note: provide fire extinguisher on east side of renovation | |||
| ELECTRIC FINAL | 09/29/2016 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: NEED APPROVED ARC RINGS ON WALLS MAINLY BATHROOMS NEC...314.20 | |||
| PLUMBING FINAL | 09/29/2016 | APPROVED | CMINI |
| HVAC FINAL | 09/29/2016 | APPROVED | CMINI |
| PLUMBING 2ND ROUGH | 08/18/2016 | APPROVED | CMINI |
| ELECTRIC 2ND ROUGH | 08/18/2016 | APPROVED | RMARTIN |
| ABOVE CEILING | 08/15/2016 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ABOVE CEILING | 07/26/2016 | PARTIALLY APPROVED | CMINI |
| Note: partial non above insulation before insulation was installed, need next one when ceiling grid is put in | |||
| HVAC ROUGH | 07/13/2016 | APPROVED | CMINI |
| PLUMBING PRESSURE TEST | 07/06/2016 | APPROVED | CMINI |
| PLUMBING 2ND ROUGH | 07/06/2016 | APPROVED | CMINI |
| FRAMING | 07/06/2016 | APPROVED | CMINI |
| MONOLITHIC SLAB | 06/27/2016 | APPROVED | JCOLASANTI |
| ELECTRIC 2ND ROUGH | 06/27/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: Inspection Resulted at 6/27/2016 11:08:42 AM NEED APPROVED REVISION BY ON OUTLET CHANGES | |||
| PLUMBING 1ST ROUGH | 06/17/2016 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| PLUM | COMPLETE | 08/05/2016 | 08/10/2016 |
| Note: Revision - Rev.3 dated 8-1-16. changed riser diagram. | |||
| MECH | COMPLETE | 08/05/2016 | 08/10/2016 |
| Note: Revision - rev.4 dated 8-3-16. changed duct layout for AHU-24. | |||
| PLUM | HOLD | 07/27/2016 | 07/28/2016 |
| Note: Provide vent for 2-compartment sink shown on sanitary riser diagram-1 per FBCP 5th ed. 910.1 and add hot water supply to sink and lavatories on domestic water riser diagram-1 per FBCP 5th ed. 607.1. FnReodica-386-986-4734. | |||
| BLD | COMPLETE | 07/26/2016 | 07/27/2016 |
| BLD | COMPLETE | 06/30/2016 | 06/30/2016 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 06/28/2016 | 06/30/2016 |
| Note: Released By: DREWIS | |||
| PLUM | COMPLETE | 06/28/2016 | 06/30/2016 |
| Note: Released By: FREODICA Revision: Sheet P1: changed sanitary tie-in connection.. | |||
| MECH | COMPLETE | 05/26/2016 | 06/01/2016 |
| BLD | COMPLETE | 05/10/2016 | 05/12/2016 |
| ELEC | COMPLETE | 05/10/2016 | 05/12/2016 |
| FI1 | COMPLETE | 05/10/2016 | 05/12/2016 |
| MECH | HOLD | 05/10/2016 | 05/12/2016 |
| Note: 1. Provide outdoor air duct layout for each AHU including duct sizes per FBC 5th ed. 107.3.5/FBCM 5th ed. 403.2. 2. Provide outdoor air calculations per FBCM 5th ed. 403.2 as the amount in CFM(s) indicated on item 9 of Notes appears to be less than minimum requirement. Also, provide outdoor air for AHU 20. F.Reodica-386-986-4734. | |||
| PLUM | COMPLETE | 05/10/2016 | 05/12/2016 |
| UD1 | COMPLETE | 05/10/2016 | 05/12/2016 |
| ZON | COMPLETE | 05/10/2016 | 05/10/2016 |
| SW1 | COMPLETE | 05/10/2016 | 05/10/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/29/2016 |
| REVISION | ¤40.00 | 09/29/2016 |
| REVISION | ¤40.00 | 09/29/2016 |
| REVISION | ¤40.00 | 09/29/2016 |
| REVISION | ¤40.00 | 09/29/2016 |
| REVISION | ¤40.00 | 09/29/2016 |
| SITE PLAN 20 | ¤20.00 | 06/01/2016 |
| SURCHARGE FS 533.721 | ¤9.58 | 06/01/2016 |
| SURCHARGE - FS 468.631 | ¤9.58 | 06/01/2016 |
| ADMIN COMMERCIAL | ¤60.00 | 06/01/2016 |
| INSPECTION - COMMERCIAL ADD | ¤875.00 | 06/01/2016 |
| ELECTRIC FEE | ¤135.00 | 06/01/2016 |
| FIRE PLANS REVIEW | ¤25.00 | 06/01/2016 |
| MECHANICAL FEE | ¤135.00 | 06/01/2016 |
| PLAN CHECK FEE | ¤143.75 | 06/01/2016 |
| PLUMBING FEE | ¤135.00 | 06/01/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,787.91 |