I want to search for...

Permit #2016050300

Permit Details

Status: FINAL

Parcel Id: 07-11-31-5112-00000-0100
Block: 00000
Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK
Job Phone: 386-238-1570
Location Address: 6 COMMERCE BLVD
Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION
Issue Date: 06/01/2016
NOC: RECORDED
Applicant name: GARY LYNN ROBERTS
Owner: DESIGNS FOR HEALTH INC

Address

980 SOUTH STREET

SUFFELD, CT 06078

Lot: 0100
Contracted Stated Job Value: ¤125,000.00
Job Description: INTERIOR ALTERATIONS
Type: CN

Contractor

COMMERCIAL CONSTRUCTION INC.
Status Location Address State License Number Phone Fax
ACTIVE

7 SUNSHINE BLVD

ORMOND BEACH, FL 32174

CGC059441 (Exp: 08/31/2026) 386-238-1570 386-238-1571

Sub Contractors

MIKE F WHALEY
Status Location Address State License Number Phone Fax
ACTIVE

804 Root Street

Daytona Beach, FL 32114

EC0001334 (Exp: 08/31/2026) (386) 252-2287 (386)257-1920
STEVEN KEITH JONES
Status Mailing Address State License Number Phone Fax
ACTIVE

345 MADISON AVE

DAYTONA BEACH, FL 32114

CMC057027 (Exp: 08/31/2026) (386)253-7774 (386)255-9431
ISAAC WALTER JOHNSTON
Status Location Address State License Number Phone
ACTIVE

887 BRENTWOOD DRIVE

Daytona Beach, FL 32117

CFC023634 (Exp: 08/31/2026) (386) 252-7047

Inspection History

Type Request Date Result Inspector
FIRE FINAL 10/03/2016 FINAL APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
U - UTILITY COMMERCIAL FINAL 09/30/2016 FINAL APPROVED DSPENCER
ELECTRIC FINAL 09/30/2016 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
BUILDING FINAL 09/30/2016 APPROVED JHINDMAN
FIRE FINAL 09/30/2016 Disapproved - NO FEE JHINDMAN
Note: provide fire extinguisher on east side of renovation
ELECTRIC FINAL 09/29/2016 Disapproved -FEE REQUIRED RMARTIN
Note: NEED APPROVED ARC RINGS ON WALLS MAINLY BATHROOMS NEC...314.20
PLUMBING FINAL 09/29/2016 APPROVED CMINI
HVAC FINAL 09/29/2016 APPROVED CMINI
PLUMBING 2ND ROUGH 08/18/2016 APPROVED CMINI
ELECTRIC 2ND ROUGH 08/18/2016 APPROVED RMARTIN
ABOVE CEILING 08/15/2016 APPROVED CMINI
Note: THIS IS A REINSPECTION
ABOVE CEILING 07/26/2016 PARTIALLY APPROVED CMINI
Note: partial non above insulation before insulation was installed, need next one when ceiling grid is put in
HVAC ROUGH 07/13/2016 APPROVED CMINI
PLUMBING PRESSURE TEST 07/06/2016 APPROVED CMINI
PLUMBING 2ND ROUGH 07/06/2016 APPROVED CMINI
FRAMING 07/06/2016 APPROVED CMINI
MONOLITHIC SLAB 06/27/2016 APPROVED JCOLASANTI
ELECTRIC 2ND ROUGH 06/27/2016 APPROVED - AS NOTED RMARTIN
Note: Inspection Resulted at 6/27/2016 11:08:42 AM NEED APPROVED REVISION BY ON OUTLET CHANGES
PLUMBING 1ST ROUGH 06/17/2016 APPROVED CMINI

Review History

Department Status Date In Date Out
PLUM COMPLETE 08/05/2016 08/10/2016
Note: Revision - Rev.3 dated 8-1-16. changed riser diagram.
MECH COMPLETE 08/05/2016 08/10/2016
Note: Revision - rev.4 dated 8-3-16. changed duct layout for AHU-24.
PLUM HOLD 07/27/2016 07/28/2016
Note: Provide vent for 2-compartment sink shown on sanitary riser diagram-1 per FBCP 5th ed. 910.1 and add hot water supply to sink and lavatories on domestic water riser diagram-1 per FBCP 5th ed. 607.1. FnReodica-386-986-4734.
BLD COMPLETE 07/26/2016 07/27/2016
BLD COMPLETE 06/30/2016 06/30/2016
Note: Released By: JHINDMAN
ELEC COMPLETE 06/28/2016 06/30/2016
Note: Released By: DREWIS
PLUM COMPLETE 06/28/2016 06/30/2016
Note: Released By: FREODICA Revision: Sheet P1: changed sanitary tie-in connection..
MECH COMPLETE 05/26/2016 06/01/2016
BLD COMPLETE 05/10/2016 05/12/2016
ELEC COMPLETE 05/10/2016 05/12/2016
FI1 COMPLETE 05/10/2016 05/12/2016
MECH HOLD 05/10/2016 05/12/2016
Note: 1. Provide outdoor air duct layout for each AHU including duct sizes per FBC 5th ed. 107.3.5/FBCM 5th ed. 403.2. 2. Provide outdoor air calculations per FBCM 5th ed. 403.2 as the amount in CFM(s) indicated on item 9 of Notes appears to be less than minimum requirement. Also, provide outdoor air for AHU 20. F.Reodica-386-986-4734.
PLUM COMPLETE 05/10/2016 05/12/2016
UD1 COMPLETE 05/10/2016 05/12/2016
ZON COMPLETE 05/10/2016 05/10/2016
SW1 COMPLETE 05/10/2016 05/10/2016

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 09/29/2016
REVISION ¤40.00 09/29/2016
REVISION ¤40.00 09/29/2016
REVISION ¤40.00 09/29/2016
REVISION ¤40.00 09/29/2016
REVISION ¤40.00 09/29/2016
SITE PLAN 20 ¤20.00 06/01/2016
SURCHARGE FS 533.721 ¤9.58 06/01/2016
SURCHARGE - FS 468.631 ¤9.58 06/01/2016
ADMIN COMMERCIAL ¤60.00 06/01/2016
INSPECTION - COMMERCIAL ADD ¤875.00 06/01/2016
ELECTRIC FEE ¤135.00 06/01/2016
FIRE PLANS REVIEW ¤25.00 06/01/2016
MECHANICAL FEE ¤135.00 06/01/2016
PLAN CHECK FEE ¤143.75 06/01/2016
PLUMBING FEE ¤135.00 06/01/2016
Fees Total Due: ¤0.00 Total Paid: ¤1,787.91