I want to search for...

Permit #2016050473

Permit Details

Status: COED

Parcel Id: 07-11-31-7025-00400-0080
CONDITIONED SPACE: 2667 sqft
GARAGE: 626 sqft
OPENED PORCH (WITH ROOF) : 132 sqft
OPENED PORCH (WITH ROOF) : 44 sqft
Total Square Footage: 3469 sqft
Block: 00400
Subdivision: 2189 - SECTION 25-PINE GROVE
Job Phone: 904-268-7730
Location Address: 9 PYTHIAN PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/27/2016
NOC: RECORDED
Applicant name: KENNETH WAYNE CAMPBELL JR
Owner: MARONDA HOMES, INC

Address

9700 PHILIPS HIGHWAY

JACKSONVILLE, FL 32256

Address

SUITE 102

JACKSONVILLE, FL 32256

Lot: 0080
Contracted Stated Job Value: ¤140,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MARONDA HOMES INC. OF FLORIDA
Status Location Address State License Number Phone Fax
CANCEL

6800 SOUTHPOINT PKWAY SUITE 300

JACKSONVILLE, FL 32216

CBC058803 (Exp: 08/31/2018) 904-268-7730 904-268-7740

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
DEBORAH MAXINE JACKSON
Status Location Address State License Number Phone Fax
CANCEL

9474 OLD PLANK RD

JACKSONVILLE , FL 32220

CCC1328530 (Exp: 08/31/2016) 904-435-7663 904-404-8406
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 12/15/2016 FINAL APPROVED JNICHOLS
BLD - BUILDING FINAL 12/14/2016 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 12/12/2016 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION need max 45amp breaker for AHU. IN PANEL......NEED PASSIVE RETURN AT DEN.....MAX 18" FROM ROOF FOR SERVICE CONDUCTOR LOOP.
BLD - BUILDING FINAL 12/09/2016 CANCELLED BY APPLICANT AIRS WEB
Note: THIS IS A REINSPECTION
ROW - FINAL INSPECTION 12/09/2016 APPROVED CTROHA
ROW - FINAL APRON (AFTER POUR) 12/07/2016 APPROVED RGROSS
Note: APPROVED
BLD - BUILDING FINAL 12/07/2016 CANCELLED BY APPLICANT JCOLASANTI
FINAL SURVEY (OFFICE USE ONLY) 12/05/2016 APPROVED RLEE
ELECTRIC - EARLY POWER 11/21/2016 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:45
ELECTRIC - EARLY POWER 11/18/2016 Disapproved -FEE REQUIRED RMARTIN
Note: THIS IS A REINSPECTION FLOOR OUTLET AND VANITY LIGHT IS NOT SAFED OFF, NEED TO HAVE WIRE NUTS, BOX AND COVER TO BE SAFED OFF FOR EARLY POWER INSPECTION
ELECTRIC - EARLY POWER 11/17/2016 CANCELLED BY APPLICANT AIRS WEB
Note: THIS IS A REINSPECTION
TUB SET 11/16/2016 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ELECTRIC - EARLY POWER 11/16/2016 Disapproved -FEE REQUIRED JCOLASANTI
Note: need cover light fixture in pantry and switch cover in master closet
TUB SET 11/14/2016 Disapproved -FEE REQUIRED LMILLER
Note: DOOR IS LOCKED, NEED ACCESS FOR INSPECTION
ROW- PRE-APRON (PRE-POUR) 11/08/2016 APPROVED CTROHA
Note: MEETS ALL REQUIREMENTS AT TIME OF INSPECTION READY TO POUR It is the BUILDER'S RESPONSIBILITY to recheck elevations and pipe size and to insure that an obstruction does not exist upstream and or downstream PRIOR to placement of concrete. MOVE BUILDERS BOX FROM PP IT IS DIRECTLY OVER THE B.M.
U - SEWER TIE IN 10/21/2016 APPROVED MBACON
INSULATION 10/04/2016 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
INSULATION 10/03/2016 Disapproved -FEE REQUIRED LMILLER
Note: FIREBLOCKING R302.11 1-6 FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) (TOP OF PANEL CHASE, AND AIR HANDLER COMPARTMENT)
ALL ROUGH 09/29/2016 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ALL ROUGH 09/28/2016 Disapproved - NO FEE LMILLER
Note: THIS IS A REINSPECTION 1. STILL NEEDPRESSURE TEST FOR SUPPLLY LINES P2503.7 WATER SUPPLY-SYSTEM TESTING NOT LESS THAN THE WORKING PRESSURE OF THE SYSTEM OR 50 psi 26 2. STILL NEED NEED TO SEAL EXHAUST BATH DUCT AT ROOF WITH MASTIC..FBC.. M1601.4.1.7. (can see through) need to call in an additional tub set inspection when gafrden tub is set.
ALL ROUGH 09/27/2016 CANCELLED BY APPLICANT AIRS WEB
Note: THIS IS A REINSPECTION
ALL ROUGH 09/26/2016 Disapproved -FEE REQUIRED JCOLASANTI
Note: TEST ON DWV AND WATER PIPPING TEST PIPE SHALL BE FILLED WITH WATER TO A POINT NOT LESS THAN 10 19AND HELD UNDER TEST FOR A PERIOD OF 15 MIN. FPC .312 fbc 2503.5.1.....need water in bath tub.....need to seal guest bath tub trench,.....METAL BOXES SHALL BE GROUNDED NEC.314.4... NEED TO SEAL EXHAUST BATH DUCT AT ROOF WITH MASTIC..FBC.. M1601.4.1.7. (can see through) need tub set inspection. need to strap wire 12" from box front bedroom by waterheater NEC 356.30
ALL ROUGH 09/23/2016 CANCELLED BY APPLICANT AIRS WEB
LATH/BRICK/ WATER BARRIER 09/22/2016 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 09/15/2016 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 09/14/2016 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION still working on flashing at time of inspection
ROOF VALLEY & METAL 09/13/2016 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION per contractor FLASHING, BASE AND COUNTER FLASHING, R905.2.8.1 (1 13 2), 4in X 4in L-FLASHING AT WALL ROOF INTERSECTIONS MUST BE SET IN APPROVED FLASHING CEMENT AND SET FLUSH TO THE BASE OF THE WALL AND OVER THE UNDERLAYMENT. BOTH HORIZONTAL AND VERTICLE METAL FLANGES SHALL BE FASTENED 6in OC WITH APPROVED FASTENERS.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/08/2016 APPROVED - AS NOTED LMILLER
Note: THIS IS A REINSPECTION CASLL IN SEPARATE ROOF VALLEY METAL INSPECTION
ROOF VALLEY & METAL 09/06/2016 Disapproved - NO FEE LMILLER
Note: NO METAL ON ROOF
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/06/2016 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION MISSING 2X4 BLOCKS FOR DETAIL 31 (CIRCLED ON PLANS)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/02/2016 Disapproved -FEE REQUIRED LMILLER
Note: DETAIL 5 CALLED OUT HOWEVER IT WAS NOT FOLLOWED COMPLETELY (CIRCLED ON LANS) MISSING DETAIL 31 IN TWO PLACES (CIRCLED ON PLANS) MISSING DETAIL 28 (CIRCLED ON PLANS) CALL IN SEPARATE INSPECTION FOR ROOF VALLEY METAL.
LATH/BRICK/ WATER BARRIER 08/16/2016 Disapproved - NO FEE JCOLASANTI
Note: not ready for lathe inspection, need to call at proper stage of construction
TIE BEAM / LINTEL 08/16/2016 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 08/15/2016 Disapproved -FEE REQUIRED DROCKWELL
Note: Missing dowels many locations
MONOLITHIC SLAB 08/08/2016 APPROVED LMILLER
MONOLITHIC SLAB 08/04/2016 CANCELLED BY APPLICANT AIRS WEB
PLUMBING 1ST ROUGH UNDERGROUND 08/02/2016 APPROVED LMILLER
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 07/22/2016 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION (UNCOVERED AREA IS NOT THE AREA OF CONCERN), DWV MINIMUM SLOPE NOT MET HORIZONTAL DRAINAGE PIPING SLOPE P3005.3. NOT LESS THAN 1/8TH (SEE RISER DIAGRAM FOR AREA OF CONCERN) (CIRCLED,, AND OVERLAYED IN RED)
PLUMBING 1ST ROUGH UNDERGROUND 07/19/2016 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION UNCOVERED AREA, DWV MINIMUM SLOPE NOT MET HORIZONTAL DRAINAGE PIPING SLOPE P3005.3. NOT LESS THAN 1/8TH
FOUND SURVEY APPROVED (OFFICE) 07/19/2016 APPROVED DREWIS
GRAVITY SEWER TEST 07/19/2016 APPROVED LMILLER
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 07/18/2016 CANCELLED BY APPLICANT DROCKWELL
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 07/18/2016 CANCELLED BY APPLICANT DROCKWELL
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 07/15/2016 CANCELLED BY APPLICANT JMONTARULI
Note: THIS IS A REINSPECTION Contractor called to cancel
GRAVITY SEWER TEST 07/15/2016 CANCELLED BY APPLICANT JMONTARULI
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 07/14/2016 Disapproved - NO FEE LMILLER
Note: THIS IS A REINSPECTION UNCOVER WORK TO BE INSPECTED..FBC...P2503.2
PLUMBING 1ST ROUGH UNDERGROUND 07/14/2016 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION UNCOVER WORK TO BE INSPECTED..FBC...P2503.2
PLUMBING 1ST ROUGH UNDERGROUND 07/12/2016 Disapproved -FEE REQUIRED LMILLER
Note: DWV MINIMUM SLOPE NOT MET HORIZONTAL DRAINAGE PIPING SLOPE P3005.3. NOT LESS THAN 1/8TH (BACKFALL PIPE MARKED WITH GREEN PAINT)
GRAVITY SEWER TEST 07/12/2016 Disapproved - NO FEE LMILLER
Note: DWV MINIMUM SLOPE NOT MET HORIZONTAL DRAINAGE PIPING SLOPE P3005.3. NOT LESS THAN 1/8TH (BACKFALL PIPE MARKED WITH GREEN PAINT)
FOOTER 06/28/2016 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
FOOTER 06/24/2016 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION Inspection Resulted at 6/24/2016 10:38:21 AM MISSING DOWELS, NOT PLACED AT REQUIRED LOCATIONS.
FOOTER 06/22/2016 Disapproved -FEE REQUIRED DROCKWELL

Review History

Department Status Date In Date Out
SW1 COMPLETE 12/05/2016 12/05/2016
Note: Released By: RLEE final survey
ENGIN1 COMPLETE 09/01/2016 09/01/2016
Note: The revision to the site plan does not require a revision to the swale plan. Use the swale plan previously issued on 05/20/2016.
SW1 COMPLETE 09/01/2016 09/02/2016
SW1 COMPLETE 07/18/2016 07/19/2016
Note: Released By: DREWIS FINAL S
ZON COMPLETE 05/24/2016 05/25/2016
BLD COMPLETE 05/16/2016 05/16/2016
ELEC COMPLETE 05/16/2016 05/17/2016
ENGIN1 COMPLETE 05/16/2016 05/20/2016
MECH COMPLETE 05/16/2016 05/16/2016
PLUM COMPLETE 05/16/2016 05/16/2016
SW1 COMPLETE 05/16/2016 05/17/2016
UD1 COMPLETE 05/16/2016 05/18/2016
ZON HOLD 05/16/2016 05/17/2016
Note: Provide setback from right side of driveway to closest point of side property line to demonstrate that it does not encroach the 7.5' easement.
URB COMPLETE 05/16/2016 05/16/2016
Note: To receive credit, existing trees must be in good structural condition and health and the root zone shall be protected during the construction phase of the project.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/15/2016
REVISION ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
REINSPECTION FEE ¤40.00 12/07/2016
SITE PLAN 20 ¤20.00 05/27/2016
SURCHARGE FS 533.721 ¤24.33 05/27/2016
SURCHARGE - FS 468.631 ¤24.33 05/27/2016
STORM WATER PERMIT FEES ¤80.00 05/27/2016
3% TRANS IMPACT FEE CREDIT (¤93.74) 05/27/2016
NEW RESIDENTIAL INSPECTIONS ¤656.00 05/27/2016
ADMIN FEE ¤20.00 05/27/2016
ELECTRIC FEE ¤256.80 05/27/2016
3% FIRE IMPACT FEE CREDIT (¤6.38) 05/27/2016
IMPACT FEE FIRE NONRESIDENTIAL ¤212.80 05/27/2016
IMPACT FEE PARKS ¤849.24 05/27/2016
IMPACT FEE SCHOOL ¤3,600.00 05/27/2016
IMPACT FEE TRANSPORTATION ¤3,124.67 05/27/2016
MECHANICAL FEE ¤256.80 05/27/2016
3% PARKS IMPACT FEE CREDIT (¤25.48) 05/27/2016
PLAN CHECK FEE ¤131.20 05/27/2016
PLUMBING FEE ¤256.80 05/27/2016
Fees Total Due: ¤0.00 Total Paid: ¤10,147.37