I want to search for...
Permit #2016060797
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7023-00620-0110 |
| CONDITIONED SPACE: 1280 sqft |
| CONDITIONED SPACE: 1280 sqft |
| GARAGE: 279 sqft |
| GARAGE: 279 sqft |
| OPENED PORCH (WITH ROOF) : 133 sqft |
| OPENED PORCH (WITH ROOF) : 133 sqft |
| OPENED PORCH (WITH ROOF) : 10 sqft |
| OPENED PORCH (WITH ROOF) : 10 sqft |
| Total Square Footage: 3404 sqft |
| Block: 00620 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 386-931-2568 |
| Location Address: 16 WHETSTONE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| NOC: NO DOCUMENTATION |
| Applicant name: PETER JOSEPH LYDEN |
| Owner: AAE HOLDINGS LLC |
|
Address 84 RIVER TRAIL DRIVE PALM COAST, FL 32137 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
DEL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1009 BUNNELL, FL 32110 |
CBC1253392 (Exp: 08/31/2024) | 386-931-2568 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
MARK DANIEL EIDMAN JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LANE UNIT 2C PALM COAST, FL 32137 |
CAC1817213 (Exp: 08/31/2026) | 386-446-8894 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
RICHARD NATHAN JOHNSON
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
4244 JACKSON ST PORT ORANGE, FL 32127 |
SUITE 2-D PORT ORANGE, FL 32127 |
CCC057176 (Exp: 08/31/2018) | (386)760-0764 | (386)760-3080 |
Inspection History
| Type | Request Date | Result | Inspector |
| FOUND SURVEY APPROVED (OFFICE) | |||
| FINAL SURVEY (OFFICE USE ONLY) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | |||
| GRAVITY SEWER TEST | |||
| ELECTRIC - EARLY POWER | |||
| MONOLITHIC SLAB | |||
| LATH/BRICK/ WATER BARRIER | |||
| TIE BEAM / LINTEL | |||
| ALL ROUGH | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | |||
| INSULATION | |||
| BLD - BUILDING FINAL | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| U - SEWER TIE IN | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 08/24/2016 | 08/25/2016 |
| ELEC | COMPLETE | 08/24/2016 | 08/24/2016 |
| BLD | COMPLETE | 08/19/2016 | 08/22/2016 |
| ELEC | HOLD | 08/19/2016 | 08/22/2016 |
| Note: Per 6/22 comment: Receptacles need to be added behind door swings of both front bedrooms, NEC 2011 210.52. -DC. Rewis 986-4736 | |||
| PLUM | COMPLETE | 08/19/2016 | 08/19/2016 |
| MECH | HOLD | 08/19/2016 | 08/19/2016 |
| Note: Energy performance level (EPL ) display card for unit B shall be signed by the builder per FBCEC 5th ed.R401.3. F.Reodica - 386-986-4734. | |||
| UD1 | COMPLETE | 08/19/2016 | 08/22/2016 |
| BLD | HOLD | 06/22/2016 | 06/22/2016 |
| Note: 1. Relocate ridge vents that are above the rated wall 5th ed. FBC R302.3. 2.Provide a 20 minute door between the house and the garage 5th ed. FBC R302.5.1. 3. Provide the correct type of construction per 5th ed. FBC 602.1. J. Hindman 986-3784. | |||
| ELEC | HOLD | 06/22/2016 | 06/22/2016 |
| Note: Please provide: Load calculations, NEC 2011 220. Receptacles behind door swing of both front bedroom, NEC 2011 210.52. Disconnects for AHUs in both residences, NEC 2011 440.14. -DC. Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 06/22/2016 | 06/24/2016 |
| MECH | HOLD | 06/22/2016 | 06/22/2016 |
| Note: Provide separate energy calculations for each unit unless done in worst case and hvac plan shall have signature and license number of hvac contractor per FBC 5th ed. 107.2.1. F.Reodica-386-986-4734. | |||
| PLUM | HOLD | 06/22/2016 | 06/22/2016 |
| Note: Provide sanitary riser diagram per FBC 5th ed. 107.2.1. F.Reodica-386-986-4734. | |||
| SW1 | COMPLETE | 06/22/2016 | 06/22/2016 |
| UD1 | HOLD | 06/22/2016 | 06/23/2016 |
| Note: PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| ZON | COMPLETE | 06/22/2016 | 06/22/2016 |
| URB | COMPLETE | 06/22/2016 | 06/22/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | |
| ELECTRIC FEE | ¤250.80 | |
| 3% FIRE IMPACT FEE CREDIT | (¤12.77) | |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤425.60 | |
| IMPACT FEE PARKS | ¤1,698.48 | |
| IMPACT FEE SCHOOL | ¤7,200.00 | |
| IMPACT FEE TRANSPORTATION | ¤6,249.34 | |
| MECHANICAL FEE | ¤250.80 | |
| 3% PARKS IMPACT FEE CREDIT | (¤50.95) | |
| PLAN CHECK FEE | ¤127.20 | |
| PLUMBING FEE | ¤250.80 | |
| NEW RESIDENTIAL INSPECTIONS | ¤636.00 | |
| SITE PLAN 20 | ¤20.00 | |
| SURCHARGE FS 533.721 | ¤23.33 | |
| SURCHARGE - FS 468.631 | ¤23.33 | |
| STORM WATER PERMIT FEES | ¤80.00 | |
| 3% TRANS IMPACT FEE CREDIT | (¤187.48) | |
| Fees | Total Due: ¤17,004.48 | Total Paid: ¤0.00 |