I want to search for...
Permit #2016070161
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0470 |
| GARAGE: 765 sqft |
| OPENED PORCH (WITH ROOF) : 81 sqft |
| SCREEN PORCH (SOLID ROOF) : 1068 sqft |
| CONDITIONED SPACE: 2947 sqft |
| Total Square Footage: 4861 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-947-4481 |
| Location Address: 34 SCARLET OAK CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/02/2016 |
| NOC: RECORDED |
| Applicant name: ERIC CHRISTOPHER OLSEN |
| Owner: WISHNIETSKY, DAN H & BONNIE B |
|
Address 300 BENT OAK DRIVE WINSTON SALEM, NC 27107 |
| Lot: 0470 |
| Contracted Stated Job Value: ¤560,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
OLSEN CUSTOM HOMES AND CONSULTING INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
CGC1508852 (Exp: 08/31/2026) | 386-947-4481 | (386)947-4484 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32136 |
CAC048127 (Exp: 08/31/2018) | 386-445-5023 | 386-446-4614 |
JOHN BRADLEY WINFREY JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1685 S. CLARA AVE Deland, FL 32720 |
CFC054901 (Exp: 08/31/2026) | 386-734-0154 | 386-734-2751 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
MARK A RUGGIERO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
411 6TH STREET HOLLY HILL , FL 32117 |
01612 (Exp: 07/23/2023) | 386-252-5555 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS FINAL | 06/19/2017 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 06/16/2017 | APPROVED | CTROHA |
| Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION | |||
| ROW - FINAL INSPECTION | 06/16/2017 | APPROVED - AS NOTED | CTROHA |
| Note: DON SCHRAGER AND I MET ON SITE TO ADDRESS THE DAMAGED MIAMI CURB . AFTER ASSESSING THE DAMAGE WHERE ERIC STATED WAS THE ONLY PLACE EQUIPMENT HAD CROSSED THE ROW. WE FOUND ONE SECTION OF CURB IN THAT AREA THAT NEEDS TO BE REMOVED AND REPLACED. SEE( MARKING PAINT) NOT TO HOLD UP THE HOME OWNER FROM MOVING IN WE ARE PASSING AS NOTED ERIC AGREED TO DO THE WORK AFTER CLOSING. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/15/2017 | FINAL APPROVED | LFITZGERALD |
| Note: reuse cross conection inspected as well-ok | |||
| GAS ROUGH | 06/15/2017 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION GAS LINES NEED DEPTH MARKERS WILL LOOK AT GAS FINAL | |||
| GAS FINAL | 06/15/2017 | Disapproved - NO FEE | JGIBSON |
| Note: GAS FINAL NOT READY HOOD VENT ON COVERED GRILL AREA NOT INSTALLED | |||
| PROJECT STATUS (OFFICE USE) | 06/15/2017 | FINAL APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION THIS WAS TO SEE THE STATUS OF NEW CONSTRUCTION HOME . HOUSE HAS HAD BUILDING FINAL, BUT HAD SOME DUPLICATE INSPECTIONS HISTORY ON INSPECTIONS CONFIRM INSPECTIONS WERE APPROVED, AND SOME WERE NOT RESCHEDULED,THE ONES THAT WERE NOT APPROVED WILL BE CORRCTED AND CALLED BACK IN FOR REINPECTION | |||
| GRAVITY SEWER TEST | 06/15/2017 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION 9/26/16 SEWER WAS APPROVED BY LEE MILLER | |||
| BLD - BUILDING FINAL | 06/14/2017 | FINAL APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 06/09/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Garage floor wet paint-cannot check panel/Clean site | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/05/2017 | APPROVED | JHINDMAN |
| ROW- PRE-APRON (PRE-POUR) | 05/10/2017 | APPROVED | CTROHA |
| Note: READY FOR PAVERS It is the BUILDER'S RESPONSIBILITY: to form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/05/2017 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR CONCRETE APRON ONLY. PAVER DRIVEWAY | |||
| ELECTRIC - EARLY POWER | 05/05/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION SPOKE TO DELL FPL RELEASED EARLY POWER 2:00 | |||
| INSULATION | 02/01/2017 | APPROVED | LMILLER |
| GAS ROUGH | 01/27/2017 | Disapproved - NO FEE | LMILLER |
| Note: IN HOUSE GAS ROUGH PASSED (CALL ROUGH IN AGAIN WHEN TANK AND LINES HAVE BEEN PLACED, PRIOR TO GAS FINAL) | |||
| ALL ROUGH | 01/27/2017 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC-TUG | 01/26/2017 | APPROVED - AS NOTED | LMILLER |
| Note: TALKED TO DEL AT FPL | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/26/2017 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC - EARLY POWER | 01/25/2017 | Disapproved - NO FEE | RMARTIN |
| Note: WRONG INSPECTION CALLED IN, THIS NEEDS TO BE A TUG INSPECTION, NEED TO CALL IN CORRECT INSPECTION | |||
| ALL ROUGH | 01/25/2017 | Disapproved - NO FEE | LMILLER |
| Note: OUT OF SEQUENCE MUST PASS ROOF SHEATHING/BRACES.TIES,DOWNCELLS PRIOR | |||
| LATH/BRICK/ WATER BARRIER | 01/20/2017 | APPROVED - AS NOTED | CMINI |
| Note: roof sheathing/braces/ties and down cell inspection. code 2460 still has not passed. need to comply with notes and call in that inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/09/2017 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION TRUSSES DO NOT MATCH TRUSS PLANS OR DRAWINGS OR ENGINEERING. OBTAIN APPROVED REVISION | |||
| TIE DOWN | 01/06/2017 | CANCELLED BY INSPECTOR | LMILLER |
| Note: wrong inspection called must pass inspection (this inspection is not a required inspection.... 2460 ROOF SHEATHING/ BRACES/ TIES/ DOWN CELLS is a requiored inspection and must be passed prior to moving forward | |||
| TIE DOWN | 01/03/2017 | CANCELLED BY APPLICANT | AIRS WEB |
| WALL SHEATHING | 01/03/2017 | APPROVED | LMILLER |
| ROOF SHEATHING | 12/14/2016 | APPROVED | LMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/13/2016 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 12/13/2016 8:57:48 AM MISSING SHEETS ON ROOF, CONTRACTOR STILL NAILING SHEATHING. TIE DOWNS AND ANCHORS NOT COMPLETE. NOT READY FOR INSPECTION | |||
| ELECTRIC-TUG | 12/06/2016 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED TUG 3:10 | |||
| TIE BEAM / LINTEL | 10/26/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 10/25/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. CLEARANCE FROM MASONRY R606.13.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET 2. OVERBEND DOWEL BAR FBC R606.13.3 EXCEPTION 26.. WITH A VERTICAL CELL NOT MORE THAN 1 1D OF HORIZONTAL DISPLACEMENT TO 6 1D OF VERTICAL BAR LENGTH. 3. REMOVE SOIL AND DEBRIS FROM DOWN CELLS, DOWN CELLS R609.1.4, ALL CELLS CONTAINING REINFORCEMENT SHALL BE GROUTED SOLID | |||
| ELEV CERT-FOUNDATION APPROVAL | 10/24/2016 | APPROVED | DBEVAN |
| FOUND SURVEY APPROVED (OFFICE) | 10/19/2016 | APPROVED | JHINDMAN |
| GRAVITY SEWER TEST | 09/26/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 09/23/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 10ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1), | |||
| MONOLITHIC SLAB | 09/16/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 09/15/2016 | CANCELLED BY APPLICANT | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 09/08/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: NEED REVISION, PLAN CALLS FOR DETAIL ( L ), NO DETAIL ( L ) ON PLANS. | |||
| MONOLITHIC SLAB | 09/07/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/02/2016 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/01/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION STILL NO TEST ON DWV.... 10ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.4, | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/30/2016 | Disapproved -FEE REQUIRED | LMILLER |
| Note: NO TEST ON DWV.... 10ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.4, | |||
| U - SEWER TIE IN | 08/30/2016 | APPROVED | JNICHOLS |
| PROJECT STATUS (OFFICE USE) | 08/25/2016 | Disapproved - NO FEE | CMINI |
| Note: need to have port-o-potty facilities on job site, homeownr next door complaining workers are using woods at rear of propery. need to have before workers return to job site. |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 06/08/2017 | 06/09/2017 |
| Note: Comments satisfied. | |||
| ZON | COMPLETE | 06/08/2017 | 06/08/2017 |
| SW1 | COMPLETE | 06/08/2017 | 06/09/2017 |
| Note: Released By: JHINDMAN FINAL S | |||
| PLFM | HOLD | 06/05/2017 | 06/06/2017 |
| Note: 1. On the provided elevation certificate, verify the elevation for the AC pad. In field C2e), the elevation is 11.8’; however, the final survey notes “10.93” in NAVD 1988; “11.93” in NGVD. 2. Add a feet mark ( ‘ ) after the BFE. For example, 9.4’. 3. Provide a modified elevation certificate consistent with the final survey. | |||
| ZON | HOLD | 06/05/2017 | 06/06/2017 |
| Note: REPEAT COMMENT: Provide site plan/survey that depicts UG LP Tank location and setbacks to adjacent property lines. | |||
| SW1 | COMPLETE | 06/02/2017 | 06/05/2017 |
| Note: Released By: JHINDMAN final s | |||
| PLUM | COMPLETE | 03/03/2017 | 03/07/2017 |
| Note: Revision - added gas supply piping to grill. | |||
| ZON | HOLD | 03/03/2017 | 03/03/2017 |
| Note: Provide site plan/survey that depicts location of the porposed UG LP Tank and it's setbacks to property lines. | |||
| PLFM | COMPLETE | 10/19/2016 | 10/24/2016 |
| SW1 | COMPLETE | 10/19/2016 | 10/19/2016 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 09/14/2016 | 09/14/2016 |
| PLFM | COMPLETE | 07/27/2016 | 07/27/2016 |
| BLD | COMPLETE | 07/27/2016 | 08/01/2016 |
| PLFM | HOLD | 07/21/2016 | 07/22/2016 |
| Note: 1. The form being utilized does not include the entire extent of Section of D that accommodates address information and block for policy information. Please download the effective elevation certificate that includes these areas. No marks can depicted on the form beyond the section boundaries. 2. Include Section E and G as part of resubmittal. Section G (page 4) is necessary for processing permit reviews and accommodating possible future community comments. | |||
| ELEC | COMPLETE | 07/21/2016 | 07/22/2016 |
| MECH | COMPLETE | 07/21/2016 | 07/22/2016 |
| BLD | HOLD | 07/21/2016 | 07/22/2016 |
| Note: Previous comment item 2 shall be addressed. 2. Clarify the Florida product approval of garage door as the submitted number D-411053 can not be found per FBC 5th ed. 107.2.1. F.Reodica-386-986-4734. | |||
| BLD | HOLD | 07/07/2016 | 07/14/2016 |
| Note: 1. Provide manufacturer's specifications and installation instructions of gas fireplace per FBCR 5th ed. R1004. 2. Clarify the Florida product approval of garage door as the submitted number D-411053 can not be found per FBC 5th ed. 107.2.1. F.Reodica-386-986-4734. | |||
| ELEC | HOLD | 07/07/2016 | 07/08/2016 |
| Note: GFCI in master bath, NEC 2011 210.52 D. -DC. Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 07/07/2016 | 07/07/2016 |
| Note: Scarlet Oak Circle is designed with curb and gutter; therefore, a swale plan is not required. | |||
| MECH | HOLD | 07/07/2016 | 07/08/2016 |
| Note: Provide balanced return air from study room per FBCR 5th ed. M1602.4. F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 07/07/2016 | 07/08/2016 |
| SW1 | COMPLETE | 07/07/2016 | 07/08/2016 |
| UD1 | COMPLETE | 07/07/2016 | 07/11/2016 |
| ZON | COMPLETE | 07/07/2016 | 07/08/2016 |
| PLFM | HOLD | 07/07/2016 | 07/07/2016 |
| Note: 1. According to the provided site plan, a 250-gallon propane tank is proposed to be installed underground. The tank shall be installed 1-foot above base flood elevation [10.02.06, LDC] and anchored to ensure that the tank will not be displaced due to buoyancy forces and result in flood hazards. If the applicant proposes to keep the tank buried, provide calculations and detail of how the tank will be anchored to minimize threat of buoyancy hazards. 2. Indicate on the site plan where the tank will be located. Informational: The provided elevation certificate has been deemed sufficient at this time. Please note that an additional elevation certificate will be required at two (2) future stages: 1) Building Under Construction (at foundation) and 2) Finished Construction (final) | |||
| URB | COMPLETE | 07/07/2016 | 07/07/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/14/2017 |
| REINSPECTION FEE | ¤40.00 | 06/14/2017 |
| REINSPECTION FEE | ¤40.00 | 06/14/2017 |
| REINSPECTION FEE | ¤40.00 | 06/14/2017 |
| REINSPECTION FEE | ¤40.00 | 06/14/2017 |
| REINSPECTION FEE | ¤40.00 | 06/14/2017 |
| REINSPECTION FEE | ¤40.00 | 06/14/2017 |
| REINSPECTION FEE | ¤40.00 | 06/14/2017 |
| REINSPECTION FEE | ¤40.00 | 06/14/2017 |
| REINSPECTION FEE | ¤40.00 | 06/14/2017 |
| REVISION | ¤40.00 | 06/14/2017 |
| REVISION | ¤40.00 | 06/14/2017 |
| SITE PLAN 20 | ¤20.00 | 08/02/2016 |
| SURCHARGE FS 533.721 | ¤38.58 | 08/02/2016 |
| SURCHARGE - FS 468.631 | ¤38.58 | 08/02/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/02/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 08/02/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,120.00 | 08/02/2016 |
| ADMIN FEE | ¤20.00 | 08/02/2016 |
| ELECTRIC FEE | ¤396.00 | 08/02/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 08/02/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 08/02/2016 |
| IMPACT FEE PARKS | ¤849.24 | 08/02/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/02/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 08/02/2016 |
| MECHANICAL FEE | ¤396.00 | 08/02/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/02/2016 |
| PLAN CHECK FEE | ¤224.00 | 08/02/2016 |
| PLUMBING FEE | ¤396.00 | 08/02/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,871.71 |