Permit #2016070533

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7007-00280-0190
Block: 00280
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: 386-931-0627
Location Address: 66 FRANCISCAN LN
Type: DR - DRIVEWAY
Issue Date: 09/14/2016
NOC: Unknown
Applicant name: FERNANDO FERNANDES
Owner: ADAIR, DAVID R & BONNIE L

Address

66 FRANCISCAN LANE

PALM COAST, FL 32137

Lot: 0190
Contracted Stated Job Value: ¤1,800.00
Job Description: CONCRETE CIRCULAR DRIVEWAY
Type: CN

Contractor

HIGH TECH CONCRETE INC
Status Location Address Phone
CANCEL

PO BOX 351726

BUNNELL, FL 32110

386-931-0627

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 01/17/2017 APPROVED RGROSS
Note: THIS IS A REINSPECTION. APPROVED
ROW - FINAL APRON (AFTER POUR) 01/13/2017 APPROVED CTROHA
Note: THIS IS A REINSPECTION SWALE PLAN IN PERMIT PACKAGE
ROW - FINAL INSPECTION 01/13/2017 Disapproved -FEE REQUIRED CTROHA
Note: THIS IS A REINSPECTION DRAINAGE ISSUE ON THE RIGHT SIDE OF THE DRIVEWAY SET THE SOD INTO THE GROUND AT THE BOTTOM OF THE SWALE TO MATCH EXISTING GRADE LIKE YOU DID ON THE LEFT SIDE. IT IS REQUIRED THAT YOU REMOVE THE OLD SOD AND ENOUGH DIRT TO OBTAIN LIKE ELEVATION FROM EXISTING SOD TO NEW
ROW - FINAL APRON (AFTER POUR) 01/12/2017 Disapproved -FEE REQUIRED RGROSS
Note: MISSING DOCUMENTATION. NO SWALE PLAN. COULD NOT CHECK CULVERT ELEVATION.
ROW - FINAL INSPECTION 01/12/2017 Disapproved - NO FEE RGROSS
Note: THIS IS A REINSPECTION. SEE NOTE ON FINAL APRON INSPECTION. CANNOT PASS FINAL ROW UNTIL APRON CULVERT IS CHECKED.
U -UTILITY RESIDENTIAL FINAL 01/04/2017 FINAL APPROVED JNICHOLS
ROW - FINAL INSPECTION 01/04/2017 Disapproved -FEE REQUIRED CTROHA
Note: SOD IN SWALE MUST MATCH EXISTING GRADE
ROW- PRE-APRON (PRE-POUR) 12/21/2016 Disapproved -FEE REQUIRED CTROHA
Note: MISSING DOCUMENTS: NO PERMIT PACKAGE ON SITE I SPOKE TO RESIDENT WHO DIDN'T HAVE IT OR KNOW WHEN THE CONTRACTOR WOULD BE BACK
ROW- PRE-APRON (PRE-POUR) 12/20/2016 APPROVED RGROSS
Note: READY TO POUR

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 12/12/2016 12/12/2016
SW1 COMPLETE 12/12/2016 12/13/2016
UD1 COMPLETE 12/12/2016 12/14/2016
Note: This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON COMPLETE 12/12/2016 12/13/2016
UD1 COMPLETE 09/01/2016 09/02/2016
ZON COMPLETE 09/01/2016 09/06/2016
ZON HOLD 07/19/2016 07/21/2016
Note: 1. Provide dimension from front property line to bottom edge circle of proposed driveway. 2. Provide setback dimension from proposed driveway to closest point of right side property line.
ENGIN1 COMPLETE 07/19/2016 07/25/2016
SW1 COMPLETE 07/19/2016 07/19/2016

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 01/13/2017
REINSPECTION FEE ¤40.00 01/12/2017
REINSPECTION FEE ¤40.00 01/11/2017
REINSPECTION FEE ¤40.00 01/11/2017
ADMIN FEE ¤20.00 09/14/2016
SITE PLAN 20 ¤20.00 09/14/2016
SURCHARGE FS 533.721 ¤2.00 09/14/2016
SURCHARGE - FS 468.631 ¤2.00 09/14/2016
STORM WATER PERMIT FEES ¤40.00 09/14/2016
Fees Total Due: ¤0.00 Total Paid: ¤244.00