Permit #2016080001
Permit Details
Status: COED
| Parcel Id: 07-11-31-7022-00270-0500 |
| CONDITIONED SPACE: 1985 sqft |
| GARAGE: 750 sqft |
| OPENED PORCH (WITH ROOF) : 288 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 3055 sqft |
| Block: 00270 |
| Subdivision: 2217 - SECTION 22-WYNNFIELD |
| Job Phone: 386-931-1725 |
| Location Address: 4 WESTROSE PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/30/2016 |
| NOC: RECORDED |
| Applicant name: JOSEPH ALEIXO PORTAL |
| Owner: SWEETWATER CUSTOM HOMES |
|
Address 1105 LAMBERT AVENUE FLAGLER BEACH, FL 32136 |
| Lot: 0500 |
| Contracted Stated Job Value: ¤165,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SWEETWATER CUSTOM HOMES INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1105 LAMBERT AVENUE FLAGLER BEACH, FL 32136 |
CBC1252965 (Exp: 08/31/2024) | 386-931-1725 | 386-439-4676 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JAMES ALLEN TAYLOR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
265 TYMBER CREEK ROAD ORMOND BEACH, FL 32174 |
CCC1326819 (Exp: 08/31/2022) | (386)290-0281 | (386)673-5216 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/09/2018 | CANCELLED BY APPLICANT | WEB |
| BLD - BUILDING FINAL | 11/09/2018 | FINAL APPROVED | JCOLASANTI |
| U -UTILITY RESIDENTIAL FINAL | 11/09/2018 | FINAL APPROVED | MBACON |
| U -UTILITY RESIDENTIAL FINAL | 11/08/2018 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: the flush mount sewer clean out for the sewer tap not observable | |||
| ROW - FINAL INSPECTION | 11/08/2018 | FINAL APPROVED | KHOWELL |
| BLD - BUILDING FINAL | 11/08/2018 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: NEED TO HAVE ARC SHIELDS WHERE THERE IS MORE THAN 1/4" SPACE AT COMBUSTABLES ...need water hammer at sink....need claear opening to shower of 22" P2101...need 3' clearance for disconnect at AC unit | |||
| U -UTILITY RESIDENTIAL FINAL | 11/05/2018 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 10/08/2018 | APPROVED | KHOWELL |
| ROW - FINAL APRON (AFTER POUR) | 09/25/2018 | CANCELLED BY APPLICANT | KHOWELL |
| ROW - FINAL INSPECTION | 09/25/2018 | CANCELLED BY APPLICANT | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 05/22/2018 | APPROVED | DREWIS |
| ELECTRIC - EARLY POWER | 03/05/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 1:20 | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 03/05/2018 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| U - SEWER TIE IN | 12/22/2017 | APPROVED | LFITZGERALD |
| GRAVITY SEWER TEST | 12/22/2017 | APPROVED | JGIBSON |
| TUB SET | 11/17/2017 | APPROVED | JGIBSON |
| INSULATION | 08/01/2017 | APPROVED | JCOLASANTI |
| ELECTRIC TEMP POLE | 07/17/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TEMP POLE POWER 2:30 | |||
| ELECTRIC - EARLY POWER | 07/14/2017 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: THIS HOUSE IS NOT READY FOR EARLY POWER...... MAYBE WRONG INSPECTION CALLED IN...... TEMP POLE? | |||
| ALL ROUGH | 07/12/2017 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 06/30/2017 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: dryer exhust needs to be sealed with mastic at roof ..FBC.. M1601.4.1.7....attach exhaust vent at guest bath....attach screws at arch window.....( note need tub set inspection) | |||
| LATH/BRICK/ WATER BARRIER | 06/26/2017 | APPROVED | JCOLASANTI |
| ROOF VALLEY & METAL | 05/31/2017 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 05/24/2017 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: roof L flashing needs to be set in approved roof cement FBC905 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/03/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/25/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: NEED APPROVED ENGINEERING SUBMITTED AND REVIEWED FROM B.D. AND BACK ON PROPERTY FOR ALTERD TRUSSES. NEED CONTINUOUS LOAD PATH ON KNEE WALL AT MASTER BATH EXTERIOR WALL. CORNER JACKS AT FRONT ENTRY MISSING STRAPS. TRUSS T-38 STRAP NEEDS CORRECTION | |||
| TIE BEAM / LINTEL | 02/08/2017 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 02/02/2017 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. CHANGES IN HEIGHT R609.2.5 AND FIGURE 609.2.5 UPPER AND LOWER BONDBEAMS MUST BE CONTINUOUSE, HAVE VERTICLE STEEL AND GROUTED SOLID AND MUST HAVE A FILLED CELL UNDER EACH CELL ADJOINING CHANGES IN HEIGHT (MISSING) 2. CLEANOUT OPENINGS 26. R606.13.7, and 609.1.5 CLEANOUT OPENINGS SHALL BE PROVIDED, MINIMUM 3 inch OPENING (MISSING AT CHANGES IN HEIGHT) (ALL CIRCLED ON FOUNDATION PAGE) | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/27/2017 | APPROVED | FREODICA |
| MONOLITHIC SLAB | 12/28/2016 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need compaction test sticker in box by next inspection. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/02/2016 | APPROVED | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 05/21/2018 | 05/22/2018 |
| Note: Released By: DREWIS final s | |||
| SW1 | COMPLETE | 01/26/2017 | 01/27/2017 |
| Note: Released By: FREODICA foundation s | |||
| ZON | COMPLETE | 08/31/2016 | 08/31/2016 |
| ZON | HOLD | 08/11/2016 | 08/12/2016 |
| Note: REPEAT COMMENTS: Please clarify the following inconsistencies: The blueprints depict the A/C pad and equipment differently than the site plan and the landscape plan. All concrete pads must be shown (with dimensions) and all documents must match. Also please note that the landscape plan must show screening for the A/C equipment. | |||
| MECH | COMPLETE | 08/11/2016 | 08/12/2016 |
| ENGIN1 | COMPLETE | 08/11/2016 | 08/12/2016 |
| BLD | COMPLETE | 08/11/2016 | 08/12/2016 |
| ELEC | COMPLETE | 08/11/2016 | 08/12/2016 |
| BLD | HOLD | 08/01/2016 | 08/03/2016 |
| Note: 1. Provide plans designed per the 5th edition of the Florida building code. J. Hindman 986-3784 | |||
| ELEC | HOLD | 08/01/2016 | 08/03/2016 |
| Note: 1. Provide plans designed to the 2011 National Electric code. J. Hindman 986-3784. | |||
| ENGIN1 | HOLD | 08/01/2016 | 08/02/2016 |
| Note: The centerline of cul-de-sac elevation provided and labeled as TBM is incorrect. Review this elevation along with the benchmark and provide a revised site plan including the correct information. | |||
| MECH | HOLD | 08/01/2016 | 08/02/2016 |
| Note: Energy performance level (EPL) display card shall be signed by the builder per FBCEC 5th ed. R401.3. F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 08/01/2016 | 08/02/2016 |
| SW1 | COMPLETE | 08/01/2016 | 08/04/2016 |
| UD1 | COMPLETE | 08/01/2016 | 08/02/2016 |
| ZON | HOLD | 08/01/2016 | 08/02/2016 |
| Note: Please clarify the following inconsistencies: The blueprints depict the A/C pad and equipment differently than the site plan and the landscape plan. All concrete pads must be shown (with dimensions) and all documents must match. Also please note that the landscape plan must show screening for the A/C equipment. | |||
| URB | COMPLETE | 08/01/2016 | 08/01/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/09/2018 |
| REINSPECTION FEE | ¤40.00 | 11/09/2018 |
| REINSPECTION FEE | ¤40.00 | 11/09/2018 |
| REINSPECTION FEE | ¤40.00 | 11/09/2018 |
| REINSPECTION FEE | ¤40.00 | 11/09/2018 |
| REINSPECTION FEE | ¤40.00 | 11/09/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤528.00 | 09/30/2016 |
| SITE PLAN 20 | ¤20.00 | 09/30/2016 |
| SURCHARGE FS 533.721 | ¤19.93 | 09/30/2016 |
| SURCHARGE - FS 468.631 | ¤19.93 | 09/30/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/30/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 09/30/2016 |
| ADMIN FEE | ¤20.00 | 09/30/2016 |
| ELECTRIC FEE | ¤218.40 | 09/30/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 09/30/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 09/30/2016 |
| IMPACT FEE PARKS | ¤849.24 | 09/30/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/30/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 09/30/2016 |
| MECHANICAL FEE | ¤218.40 | 09/30/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/30/2016 |
| PLAN CHECK FEE | ¤105.60 | 09/30/2016 |
| PLUMBING FEE | ¤218.40 | 09/30/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,351.21 |