I want to search for...

Permit #2016080289

Permit Details

Status: COED

Parcel Id: 07-11-31-7063-00730-0100
CONDITIONED SPACE: 2073 sqft
GARAGE: 750 sqft
OPENED PORCH (WITH ROOF) : 293 sqft
OPENED PORCH (WITH ROOF) : 106 sqft
Total Square Footage: 3222 sqft
Block: 00730
Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL
Job Phone: 904-669-7908
Location Address: 54 ZEBULAHS TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/22/2016
NOC: RECORDED
Applicant name: KENLY H MCGEE
Owner: APEX HOMES, LLC

Address

226 A ST JOE PLAZA

PALM COAST, FL 32164

Address

# 105

PALM COAST, FL 32164

Lot: 0100
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

KENLY MCGEE LLC
Status Location Address State License Number Phone
INACTIVE

336 ALTARA

ST AUGUSTINE, FL 32086

CBC043181 (Exp: 08/31/2026) 904-669-7908

Sub Contractors

JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
DANIEL J LUSINSKI
Status Location Address Mailing Address State License Number Phone
ACTIVE

389 PALM COAST PARKWAY SW

PALM COAST, FL 32137

#4

PALM COAST, FL 32137

CCC1330133 (Exp: 08/31/2026) 386-338-7926
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 06/09/2017 FINAL APPROVED MBACON
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 06/05/2017 Disapproved - NO FEE MBACON
Note: 4 Inch sewer clean out cap needs to be flushmount style cut to grade. No raised nut style caps are permitted
BLD - BUILDING FINAL 06/02/2017 FINAL APPROVED DROCKWELL
BLD - BUILDING FINAL 05/19/2017 Disapproved -FEE REQUIRED DROCKWELL
Note: Attic access cover must be rated for flame spread/Remove construction materials from garage
FINAL SURVEY (OFFICE USE ONLY) 05/15/2017 APPROVED FREODICA
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 05/08/2017 Disapproved - NO FEE CMINI
Note: need to submit to office, not a call in inspection
ROW - FINAL APRON (AFTER POUR) 05/08/2017 APPROVED - AS NOTED CTROHA
Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION L=21.54 R=21.60 CULVERT INVERTS THAT I SHOT. I RECOMMEND THAT YOU HAVE A1A EAST COAST LAND SURVEYORS RESHOOT DRIVEWAY INVERTS THEY SHOT L=21.36 R=21.39 WHICH SHOWS YOUR PIPE OUT OF TOLERANCE ON THE FINAL SURVEY
ROW - FINAL INSPECTION 05/08/2017 APPROVED CTROHA
Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION
U - SEWER TIE IN 03/27/2017 APPROVED MBACON
FINAL APRON (AFTER POUR/DRIVEWAY) 03/27/2017 Disapproved -FEE REQUIRED CTROHA
Note: MISSING DOCUMENTS: FINAL SURVEY ACTUAL DRIVEWAY DOESN'T MATCH PROPOSED GET A REVISION BEFORE SUBMITTING FINAL
INSULATION 03/27/2017 CANCELLED BY INSPECTOR DROCKWELL
Note: Inspection was completed on 1/19
ROW- PRE-APRON (PRE-POUR) 03/09/2017 APPROVED RGROSS
Note: THIS IS A REINSPECTION. READY TO POUR
ROW- PRE-APRON (PRE-POUR) 03/08/2017 Disapproved -FEE REQUIRED RGROSS
Note: NO SWALE PLAN
ELECTRIC - EARLY POWER 02/23/2017 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED EARLY POWER 10:00
INSULATION 01/19/2017 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
INSULATION 01/17/2017 Disapproved -FEE REQUIRED DROCKWELL
Note: Firefoam duct chase/Service panel has an open area into attic-seal
ROOF VALLEY & METAL 01/06/2017 APPROVED DROCKWELL
ALL ROUGH 12/27/2016 APPROVED - AS NOTED CMINI
Note: 10 head on DWV fbc 2501.. nail plate in 2nd bath rm on electric, and busted fireblock in garage, possible nail plate ther. frame in panel and dryer vent. check on insulation
LATH/BRICK/ WATER BARRIER 12/14/2016 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/06/2016 APPROVED DROCKWELL
LATH/BRICK/ WATER BARRIER 11/08/2016 CANCELLED BY APPLICANT AIRS WEB
TIE BEAM / LINTEL 11/08/2016 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 11/07/2016 APPROVED FREODICA
MONOLITHIC SLAB 10/12/2016 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 09/30/2016 APPROVED DROCKWELL
GRAVITY SEWER TEST 09/30/2016 APPROVED DROCKWELL

Review History

Department Status Date In Date Out
SW1 COMPLETE 05/12/2017 05/15/2017
Note: Released By: FREODICA final s
ENGIN1 COMPLETE 04/04/2017 04/10/2017
Note: Use the previously issued Swale Plan.
SW1 COMPLETE 04/04/2017 04/06/2017
UD1 COMPLETE 04/04/2017 04/05/2017
ZON COMPLETE 04/04/2017 04/05/2017
BLD COMPLETE 12/02/2016 12/02/2016
ELEC COMPLETE 12/02/2016 12/02/2016
BLD HOLD 11/08/2016 11/09/2016
Note: 1. Provide revised signed and sealed plans for the bond beam height changes. 5th ed. FBC 107.2.1.J. Hindman 986-3784
SW1 COMPLETE 11/07/2016 11/07/2016
Note: Released By: FREODICA foundation s
ZON COMPLETE 08/22/2016 08/22/2016
URB COMPLETE 08/22/2016 08/22/2016
UD1 COMPLETE 08/17/2016 08/18/2016
URB HOLD 08/17/2016 08/18/2016
Note: Lot size requires one more understory tree.
ZON COMPLETE 08/17/2016 08/18/2016
ENGIN1 COMPLETE 08/17/2016 08/19/2016
BLD COMPLETE 08/09/2016 08/11/2016
ELEC COMPLETE 08/09/2016 08/10/2016
ENGIN1 HOLD 08/09/2016 08/12/2016
Note: The benchmark provided on the site plan is not in agreement with our calculations and previous surveys. Check the data and revise the benchmark accordingly.
MECH COMPLETE 08/09/2016 08/11/2016
PLUM COMPLETE 08/09/2016 08/11/2016
SW1 COMPLETE 08/09/2016 08/10/2016
UD1 HOLD 08/09/2016 08/10/2016
Note: PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 08/09/2016 08/11/2016
Note: Landscaping plan is required.
URB HOLD 08/09/2016 08/10/2016
Note: Need to submit a landscape plan.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 06/09/2017
REINSPECTION FEE ¤40.00 06/09/2017
REINSPECTION FEE ¤40.00 06/09/2017
REINSPECTION FEE ¤40.00 06/09/2017
REVISION ¤40.00 06/09/2017
SITE PLAN 20 ¤20.00 08/22/2016
SURCHARGE FS 533.721 ¤20.75 08/22/2016
SURCHARGE - FS 468.631 ¤20.75 08/22/2016
STORM WATER PERMIT FEES ¤80.00 08/22/2016
3% TRANS IMPACT FEE CREDIT (¤93.74) 08/22/2016
NEW RESIDENTIAL INSPECTIONS ¤554.00 08/22/2016
ELECTRIC FEE ¤226.20 08/22/2016
3% FIRE IMPACT FEE CREDIT (¤6.43) 08/22/2016
IMPACT FEE FIRE NONRESIDENTIAL ¤214.29 08/22/2016
IMPACT FEE PARKS ¤849.24 08/22/2016
IMPACT FEE SCHOOL ¤3,600.00 08/22/2016
IMPACT FEE TRANSPORTATION ¤3,124.67 08/22/2016
MECHANICAL FEE ¤226.20 08/22/2016
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/22/2016
PLAN CHECK FEE ¤110.80 08/22/2016
PLUMBING FEE ¤226.20 08/22/2016
ADMIN FEE ¤20.00 08/22/2016
Fees Total Due: ¤0.00 Total Paid: ¤9,367.45