I want to search for...
Permit #2016080403
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00970-0420 |
| CONDITIONED SPACE: 3031 sqft |
| GARAGE: 627 sqft |
| OPENED PORCH (WITH ROOF) : 269 sqft |
| OPENED PORCH (WITH ROOF) : 201 sqft |
| Total Square Footage: 4128 sqft |
| Block: 00970 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 904-268-7730 |
| Location Address: 41 BUD SHIRE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/19/2016 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMPBELL JR |
| Owner: MARONDA HOMES INC OF FLORIDA |
|
Address 9700 PHILIPS HIGHWAY JACKSONVILLE, FL 32256 |
|
Address SUITE 102 JACKSONVILLE, FL 32256 |
| Lot: 0420 |
| Contracted Stated Job Value: ¤135,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES INC. OF FLORIDA
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6800 SOUTHPOINT PKWAY SUITE 300 JACKSONVILLE, FL 32216 |
CBC058803 (Exp: 08/31/2018) | 904-268-7730 | 904-268-7740 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
DEBORAH MAXINE JACKSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1165 SOUTH 5TH MACCLENNY, FL 32063 |
CCC1330709 (Exp: 08/31/2026) | 904-322-9409 |
GARI STINE
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
7225 JACKSONVILLE CT WINTER PARK, FL 32792 |
SUITE 1 JACKSONVILE, FL 32256 |
CAC1818134 (Exp: 08/31/2020) | 407-629-6920 | 407-629-9307 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 03/01/2017 | FINAL APPROVED | JNICHOLS |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | 02/28/2017 | APPROVED | CTROHA |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 02/28/2017 | Disapproved -FEE REQUIRED | JNICHOLS |
| Note: there is no power source extended to the pep panel. electrician needs to run wire to the panel and tie in. The panel is unlocked. | |||
| BLD - BUILDING FINAL | 02/28/2017 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 02/24/2017 | APPROVED | CTROHA |
| Note: L INV=28.41 R INV=28.42 | |||
| ROW - FINAL INSPECTION | 02/24/2017 | Disapproved -FEE REQUIRED | CTROHA |
| Note: GENERAL CLEAN UP: REMOVE ALL TRASH FROM THE ADJACENT LOT DOWN THE LSPL ROAD REPAIR ON THE CORNER SEE MARKING PAINT REMOVE JOHN BOY ACROSS THE STREET AND REPAIR SOD IF NEEDED | |||
| BLD - BUILDING FINAL | 02/24/2017 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: NEED SWITCH ON/OFF OUTLET IN BEDROOM BY GARAGE......NEED AIR RETURN AT DEN......NEED TO PLACE OUTLET COVER BACK ON IN DEN. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/23/2017 | APPROVED | JHINDMAN |
| ELECTRIC - EARLY POWER | 02/14/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 1:20 | |||
| TUB SET | 02/13/2017 | APPROVED | JCOLASANTI |
| U - SEWER TIE IN | 02/07/2017 | APPROVED | MBACON |
| ROW- PRE-APRON (PRE-POUR) | 02/06/2017 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| LATH/BRICK/ WATER BARRIER | 01/17/2017 | APPROVED | JCOLASANTI |
| INSULATION | 12/27/2016 | APPROVED | JCOLASANTI |
| ALL ROUGH | 12/21/2016 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 12/19/2016 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: The max. lenght of the exhaust duct shall be 35' from the connection to the transition duct. where fittings are used the max length of the duct shall be reduced in accordance with FBC Table M1502.4.4.1. METAL BOXES SHALL BE GROUNDED NEC.314.4 (left side exterior garage metal box) | |||
| ROOF VALLEY & METAL | 12/08/2016 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/02/2016 | APPROVED - AS NOTED | JCOLASANTI |
| Note: truss h03 detail A, 24"OC. check next inspection | |||
| TIE BEAM / LINTEL | 11/18/2016 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 11/17/2016 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 11/01/2016 | APPROVED | JCOLASANTI |
| MONOLITHIC SLAB | 10/31/2016 | CANCELLED BY APPLICANT | AIRS WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/25/2016 | APPROVED - AS NOTED | JCOLASANTI |
| Note: sleeve to sewer needs to be filled completly, call me when done | |||
| GRAVITY SEWER TEST | 10/25/2016 | APPROVED | JCOLASANTI |
| STEM WALL FOUNDATION | 10/05/2016 | APPROVED | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 02/22/2017 | 02/23/2017 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 11/17/2016 | 11/17/2016 |
| Note: Released By: JHINDMAN FOUNDATION SURVEY | |||
| MECH | COMPLETE | 09/08/2016 | 09/08/2016 |
| UD1 | COMPLETE | 09/08/2016 | 09/09/2016 |
| ELEC | COMPLETE | 09/08/2016 | 09/08/2016 |
| ZON | COMPLETE | 09/08/2016 | 09/09/2016 |
| BLD | COMPLETE | 08/12/2016 | 08/15/2016 |
| ELEC | HOLD | 08/12/2016 | 08/15/2016 |
| Note: Provide electrical plans with the license number and signature of the electrical contractor or signed and sealed by an engineer or architect, FBC 2014 5th ed. 105.3.1.2. Provide the following per the NEC 2011: Load calculation, 220 Additional GFCI in master bath, 210.52 D Additional GFCI for kitchen island, 210.52 C2 -DC. Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 08/12/2016 | 08/17/2016 |
| MECH | HOLD | 08/12/2016 | 08/12/2016 |
| Note: Provide hvac plan either prepared by design professional or an hvac contractor with signature and license number per FBC 5th ed. 107.2.1. F.Reodica - 386-986-4734. | |||
| PLUM | COMPLETE | 08/12/2016 | 08/12/2016 |
| SW1 | COMPLETE | 08/12/2016 | 08/15/2016 |
| UD1 | HOLD | 08/12/2016 | 08/15/2016 |
| Note: PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| ZON | HOLD | 08/12/2016 | 08/15/2016 |
| Note: Stucco banding is required around all windows and doors facing the public right of way. | |||
| URB | COMPLETE | 08/12/2016 | 08/12/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/01/2017 |
| REINSPECTION FEE | ¤40.00 | 03/01/2017 |
| REINSPECTION FEE | ¤40.00 | 03/01/2017 |
| CONTRACTOR CHANGE | ¤40.00 | 02/17/2017 |
| CONTRACTOR CHANGE | ¤40.00 | 02/17/2017 |
| REINSPECTION FEE | ¤40.00 | 02/17/2017 |
| REINSPECTION FEE | ¤40.00 | 02/17/2017 |
| ADMIN FEE | ¤20.00 | 09/19/2016 |
| ELECTRIC FEE | ¤288.60 | 09/19/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 09/19/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 09/19/2016 |
| IMPACT FEE PARKS | ¤849.24 | 09/19/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/19/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 09/19/2016 |
| MECHANICAL FEE | ¤288.60 | 09/19/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/19/2016 |
| PLAN CHECK FEE | ¤152.40 | 09/19/2016 |
| PLUMBING FEE | ¤288.60 | 09/19/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤762.00 | 09/19/2016 |
| SITE PLAN 20 | ¤20.00 | 09/19/2016 |
| SURCHARGE FS 533.721 | ¤27.30 | 09/19/2016 |
| SURCHARGE - FS 468.631 | ¤27.30 | 09/19/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/19/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 09/19/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,897.35 |