I want to search for...

Permit #2016080748

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01040-0110
CONDITIONED SPACE: 1996 sqft
GARAGE: 701 sqft
OPENED PORCH (WITH ROOF) : 208 sqft
OPENED PORCH (WITH ROOF) : 137 sqft
Total Square Footage: 3042 sqft
Block: 01040
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-447-4400
Location Address: 18 EVANSTON LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/07/2016
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: LUGI, DAVID F

Address

21 JFK AVENUE

CLINTON, MA 01510

Lot: 0110
Contracted Stated Job Value: ¤261,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
DENNIS GENE GAINEY
Status Location Address State License Number Phone Fax
INACTIVE

P.O. BOX 1203

Bunnell, FL 32110

CFC046004 (Exp: 08/31/2026) (386) 437-5637 386-437-3012
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 06/06/2017 FINAL APPROVED MBACON
BLD - BUILDING FINAL 06/05/2017 FINAL APPROVED DROCKWELL
ROW - FINAL APRON (AFTER POUR) 05/31/2017 APPROVED CTROHA
Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION
ROW - FINAL INSPECTION 05/31/2017 APPROVED CTROHA
Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION
FINAL SURVEY (OFFICE USE ONLY) 05/30/2017 APPROVED JHINDMAN
ROW- PRE-APRON (PRE-POUR) 03/27/2017 APPROVED CTROHA
Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the specs shown on the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. R=24.33 L=24.30
ELECTRIC - EARLY POWER 03/14/2017 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 9:20
GRAVITY SEWER TEST 03/06/2017 APPROVED DROCKWELL
U - SEWER TIE IN 03/06/2017 FINAL APPROVED MBACON
LATH/BRICK/ WATER BARRIER 01/25/2017 APPROVED DROCKWELL
INSULATION 01/23/2017 APPROVED DROCKWELL
ALL ROUGH 01/18/2017 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/16/2016 APPROVED DROCKWELL
ROOF VALLEY & METAL 12/16/2016 APPROVED DROCKWELL
TIE BEAM / LINTEL 11/15/2016 APPROVED DROCKWELL
ELECTRIC-TUG 11/15/2016 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 11/14/2016 APPROVED FREODICA
MONOLITHIC SLAB 10/26/2016 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 10/20/2016 APPROVED LMILLER

Review History

Department Status Date In Date Out
SW1 COMPLETE 05/26/2017 05/30/2017
Note: Released By: JHINDMAN final survey
BLD COMPLETE 12/13/2016 12/16/2016
SW1 COMPLETE 11/10/2016 11/14/2016
Note: Released By: FREODICA foundation s
ENGIN1 COMPLETE 11/03/2016 11/03/2016
SW1 COMPLETE 11/03/2016 11/04/2016
UD1 COMPLETE 11/03/2016 11/03/2016
ZON COMPLETE 11/03/2016 11/03/2016
BLD COMPLETE 10/12/2016 10/17/2016
ZON COMPLETE 10/12/2016 10/13/2016
ENGIN1 COMPLETE 09/02/2016 09/06/2016
ZON COMPLETE 09/02/2016 09/06/2016
BLD COMPLETE 08/23/2016 08/23/2016
ELEC COMPLETE 08/23/2016 08/23/2016
ENGIN1 HOLD 08/23/2016 08/30/2016
Note: The benchmark provided on the site plan does not match a previous survey(26.61') and our surveyor's recently collected data. Please review this benchmark and provide a revised site plan with updated benchmark information.
MECH COMPLETE 08/23/2016 08/23/2016
PLUM COMPLETE 08/23/2016 08/23/2016
SW1 COMPLETE 08/23/2016 08/23/2016
UD1 COMPLETE 08/23/2016 08/25/2016
ZON COMPLETE 08/23/2016 08/24/2016
URB COMPLETE 08/23/2016 08/24/2016

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 06/08/2017
SITE PLAN 20 ¤20.00 09/07/2016
SURCHARGE FS 533.721 ¤20.00 09/07/2016
SURCHARGE - FS 468.631 ¤20.00 09/07/2016
STORM WATER PERMIT FEES ¤80.00 09/07/2016
3% TRANS IMPACT FEE CREDIT (¤93.74) 09/07/2016
ADMIN FEE ¤20.00 09/07/2016
ELECTRIC FEE ¤219.00 09/07/2016
3% FIRE IMPACT FEE CREDIT (¤6.43) 09/07/2016
IMPACT FEE FIRE NONRESIDENTIAL ¤214.29 09/07/2016
IMPACT FEE PARKS ¤849.24 09/07/2016
IMPACT FEE SCHOOL ¤3,600.00 09/07/2016
IMPACT FEE TRANSPORTATION ¤3,124.67 09/07/2016
MECHANICAL FEE ¤219.00 09/07/2016
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/07/2016
PLAN CHECK FEE ¤106.00 09/07/2016
PLUMBING FEE ¤219.00 09/07/2016
NEW RESIDENTIAL INSPECTIONS ¤530.00 09/07/2016
Fees Total Due: ¤0.00 Total Paid: ¤9,155.55