I want to search for...
Permit #2016080748
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01040-0110 |
| CONDITIONED SPACE: 1996 sqft |
| GARAGE: 701 sqft |
| OPENED PORCH (WITH ROOF) : 208 sqft |
| OPENED PORCH (WITH ROOF) : 137 sqft |
| Total Square Footage: 3042 sqft |
| Block: 01040 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-447-4400 |
| Location Address: 18 EVANSTON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/07/2016 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: LUGI, DAVID F |
|
Address 21 JFK AVENUE CLINTON, MA 01510 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤261,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SALTWATER HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| DECEASED |
138 PALM COAST PARKWAY PALM COAST, FL 32137 |
SUITE 328 PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2025) | 386-447-4400 | 866-244-9639 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 06/06/2017 | FINAL APPROVED | MBACON |
| BLD - BUILDING FINAL | 06/05/2017 | FINAL APPROVED | DROCKWELL |
| ROW - FINAL APRON (AFTER POUR) | 05/31/2017 | APPROVED | CTROHA |
| Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION | |||
| ROW - FINAL INSPECTION | 05/31/2017 | APPROVED | CTROHA |
| Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 05/30/2017 | APPROVED | JHINDMAN |
| ROW- PRE-APRON (PRE-POUR) | 03/27/2017 | APPROVED | CTROHA |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the specs shown on the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. R=24.33 L=24.30 | |||
| ELECTRIC - EARLY POWER | 03/14/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 9:20 | |||
| GRAVITY SEWER TEST | 03/06/2017 | APPROVED | DROCKWELL |
| U - SEWER TIE IN | 03/06/2017 | FINAL APPROVED | MBACON |
| LATH/BRICK/ WATER BARRIER | 01/25/2017 | APPROVED | DROCKWELL |
| INSULATION | 01/23/2017 | APPROVED | DROCKWELL |
| ALL ROUGH | 01/18/2017 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/16/2016 | APPROVED | DROCKWELL |
| ROOF VALLEY & METAL | 12/16/2016 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 11/15/2016 | APPROVED | DROCKWELL |
| ELECTRIC-TUG | 11/15/2016 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 11/14/2016 | APPROVED | FREODICA |
| MONOLITHIC SLAB | 10/26/2016 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/20/2016 | APPROVED | LMILLER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 05/26/2017 | 05/30/2017 |
| Note: Released By: JHINDMAN final survey | |||
| BLD | COMPLETE | 12/13/2016 | 12/16/2016 |
| SW1 | COMPLETE | 11/10/2016 | 11/14/2016 |
| Note: Released By: FREODICA foundation s | |||
| ENGIN1 | COMPLETE | 11/03/2016 | 11/03/2016 |
| SW1 | COMPLETE | 11/03/2016 | 11/04/2016 |
| UD1 | COMPLETE | 11/03/2016 | 11/03/2016 |
| ZON | COMPLETE | 11/03/2016 | 11/03/2016 |
| BLD | COMPLETE | 10/12/2016 | 10/17/2016 |
| ZON | COMPLETE | 10/12/2016 | 10/13/2016 |
| ENGIN1 | COMPLETE | 09/02/2016 | 09/06/2016 |
| ZON | COMPLETE | 09/02/2016 | 09/06/2016 |
| BLD | COMPLETE | 08/23/2016 | 08/23/2016 |
| ELEC | COMPLETE | 08/23/2016 | 08/23/2016 |
| ENGIN1 | HOLD | 08/23/2016 | 08/30/2016 |
| Note: The benchmark provided on the site plan does not match a previous survey(26.61') and our surveyor's recently collected data. Please review this benchmark and provide a revised site plan with updated benchmark information. | |||
| MECH | COMPLETE | 08/23/2016 | 08/23/2016 |
| PLUM | COMPLETE | 08/23/2016 | 08/23/2016 |
| SW1 | COMPLETE | 08/23/2016 | 08/23/2016 |
| UD1 | COMPLETE | 08/23/2016 | 08/25/2016 |
| ZON | COMPLETE | 08/23/2016 | 08/24/2016 |
| URB | COMPLETE | 08/23/2016 | 08/24/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 06/08/2017 |
| SITE PLAN 20 | ¤20.00 | 09/07/2016 |
| SURCHARGE FS 533.721 | ¤20.00 | 09/07/2016 |
| SURCHARGE - FS 468.631 | ¤20.00 | 09/07/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/07/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 09/07/2016 |
| ADMIN FEE | ¤20.00 | 09/07/2016 |
| ELECTRIC FEE | ¤219.00 | 09/07/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 09/07/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 09/07/2016 |
| IMPACT FEE PARKS | ¤849.24 | 09/07/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/07/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 09/07/2016 |
| MECHANICAL FEE | ¤219.00 | 09/07/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/07/2016 |
| PLAN CHECK FEE | ¤106.00 | 09/07/2016 |
| PLUMBING FEE | ¤219.00 | 09/07/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤530.00 | 09/07/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,155.55 |