I want to search for...
Permit #2016100085
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00040-0070 |
| CONDITIONED SPACE: 2197 sqft |
| GARAGE: 547 sqft |
| OPENED PORCH (WITH ROOF) : 335 sqft |
| OPENED PORCH (WITH ROOF) : 62 sqft |
| Total Square Footage: 3141 sqft |
| Block: 00040 |
| Subdivision: - |
| Job Phone: (386)445-2012 |
| Location Address: 11 ROUND THORN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/15/2016 |
| NOC: RECORDED |
| Applicant name: JOHN DONALD GORDON |
| Owner: VAN JONES DEBRICK JR |
|
Address 12915 PISCATAWAY LANDING DR CLINTON, MD 20735 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤215,953.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. Box 354786 Palm Coast, FL 32137 |
CGC062646 (Exp: 08/31/2020) | (386)445-2012 | (386)446-7928 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 08/11/2017 | FINAL APPROVED | MBACON |
| BLD - BUILDING FINAL | 08/10/2017 | FINAL APPROVED | DROCKWELL |
| GAS ROUGH | 08/10/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 08/10/2017 | FINAL APPROVED | DROCKWELL |
| ROW - FINAL APRON (AFTER POUR) | 08/09/2017 | APPROVED | CTROHA |
| Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION | |||
| ROW - FINAL INSPECTION | 08/09/2017 | APPROVED | CTROHA |
| Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/03/2017 | APPROVED | FREODICA |
| ROW- PRE-APRON (PRE-POUR) | 06/28/2017 | APPROVED | CTROHA |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. 55 55 | |||
| U - SEWER TIE IN | 06/19/2017 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 06/16/2017 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-sewer connection could not be observed ,excavated hole filled in with muddy water | |||
| U - SEWER TIE IN | 06/06/2017 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: excavated area of sewer tie in filled with muddy water,unable to inspect sewer connection | |||
| GRAVITY SEWER TEST | 06/06/2017 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 04/27/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION SPOKE TO DELL FPL RELEASED EARLY POWER 10:10 | |||
| ELECTRIC - EARLY POWER | 04/26/2017 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: ALL DOORS LOCKED NEED ACCESS TO HOME FOR INSPECTION | |||
| INSULATION | 03/16/2017 | APPROVED | DROCKWELL |
| GAS ROUGH | 03/13/2017 | Disapproved - NO FEE | LMILLER |
| Note: INTERIOR GAS RISER APPROVED, (RE-CALL WHEN EXTERIOR LINES AND TANK HAVE BEEN PLACED) | |||
| ALL ROUGH | 03/13/2017 | APPROVED - AS NOTED | LMILLER |
| Note: 1. box out above electric panel or place nail plates NAIL PLATES ON ELECTRIC FBC E3802.1 2. need nail plate at top plate for microwave/range axaust vent DUCT NAIL PLATE M1502.5 FOR PROTECTION OF EXHAUST VENTS (CHECK AT INSULATION) | |||
| LATH/BRICK/ WATER BARRIER | 03/08/2017 | APPROVED | DROCKWELL |
| ROOF VALLEY & METAL | 02/28/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 02/23/2017 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. VALLEY FLASHING, R905.2.8.2 2. FLASHING, BASE AND COUNTER FLASHING, R905.2.8.1 (1 13 2), 4in X 4in L-FLASHING AT WALL ROOF INTERSECTIONS MUST BE SET IN APPROVED FLASHING CEMENT AND SET FLUSH TO THE BASE OF THE WALL AND OVER THE UNDERLAYMENT. BOTH HORIZONTAL AND VERTICLE METAL FLANGES SHALL BE FASTENED 6in OC WITH APPROVED FASTENERS. ALL LAPS SHALL BE A MINIMUM OF 4in. FULLY SEALED IN APPROVED FLASHING CEMENTTHE ENTIRE EDGE OF THE HORIZONTAL FLANGE SHALL BE SEALED COVERING ALL NAIL PENITRATIONS WITH APPROVED FLASHING CEMENT AND MEMBRANE | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/15/2017 | APPROVED | DROCKWELL |
| ELECTRIC TEMP POLE | 02/15/2017 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 01/23/2017 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 01/20/2017 | APPROVED | FREODICA |
| MONOLITHIC SLAB | 01/10/2017 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/06/2017 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/28/2017 | 08/03/2017 |
| Note: Released By: FREODICA final s | |||
| ZON | COMPLETE | 07/05/2017 | 07/06/2017 |
| Note: Released By: JGONZALEZ revised color | |||
| ZON | HOLD | 05/25/2017 | 05/25/2017 |
| Note: Color does not meet the LRV Light pastel colors and white. Acceptable light pastel colors and white shall have LRV of 80 or greater. Earth tones include shades of brown, brown-taupe or sandy-taupe, beige, terra cotta, olive, sage and gray. Acceptable earth tone shades shall have a LRV of 25 or greater. | |||
| ZON | HOLD | 05/22/2017 | 05/23/2017 |
| Note: Please provide us with a color swatch and the LRV | |||
| PLUM | COMPLETE | 02/17/2017 | 02/20/2017 |
| SW1 | COMPLETE | 01/18/2017 | 01/20/2017 |
| Note: Released By: FREODICA FOUNDATION | |||
| ZON | COMPLETE | 10/26/2016 | 10/27/2016 |
| ZON | HOLD | 10/21/2016 | 10/21/2016 |
| Note: Exterior body color does not meet the definition of earth tone per City LDC. | |||
| ZON | HOLD | 10/14/2016 | 10/18/2016 |
| Note: 1. A/C pad encroaching 5' utility easement. 2. Per LDC, minimum LRV for earth tones is 25. See Color Sheet emailed today to homes@skywaybuilders.com. | |||
| BLD | COMPLETE | 10/05/2016 | 10/06/2016 |
| ELEC | COMPLETE | 10/05/2016 | 10/12/2016 |
| ENGIN1 | COMPLETE | 10/05/2016 | 10/12/2016 |
| MECH | COMPLETE | 10/05/2016 | 10/06/2016 |
| PLUM | COMPLETE | 10/05/2016 | 10/06/2016 |
| SW1 | COMPLETE | 10/05/2016 | 10/12/2016 |
| UD1 | COMPLETE | 10/05/2016 | 10/10/2016 |
| ZON | HOLD | 10/05/2016 | 10/06/2016 |
| Note: 1. Provide paint chips that include the LRV for both exterior paint colors as we are unable to verify. 2. Site plan missing rear setback dimension. | |||
| URB | COMPLETE | 10/05/2016 | 10/06/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/26/2017 |
| REINSPECTION FEE | ¤40.00 | 07/26/2017 |
| REINSPECTION FEE | ¤40.00 | 07/26/2017 |
| REINSPECTION FEE | ¤40.00 | 07/26/2017 |
| REVISION | ¤40.00 | 07/26/2017 |
| SITE PLAN 20 | ¤20.00 | 11/15/2016 |
| SURCHARGE FS 533.721 | ¤21.13 | 11/15/2016 |
| SURCHARGE - FS 468.631 | ¤21.13 | 11/15/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/15/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 11/15/2016 |
| NEW RESIDENTIAL INSPECTIONS | ¤566.00 | 11/15/2016 |
| ADMIN FEE | ¤20.00 | 11/15/2016 |
| ELECTRIC FEE | ¤229.80 | 11/15/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 11/15/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 11/15/2016 |
| IMPACT FEE PARKS | ¤849.24 | 11/15/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/15/2016 |
| RECORDING FEE REIMBURSE DOC | ¤35.50 | 11/15/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 11/15/2016 |
| MECHANICAL FEE | ¤229.80 | 11/15/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 11/15/2016 |
| PLAN CHECK FEE | ¤113.20 | 11/15/2016 |
| PLUMBING FEE | ¤229.80 | 11/15/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,428.91 |