I want to search for...

Permit #2016110195

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7001-00040-0060
Block: 00040
Subdivision: 2143 - SECTION 1-FLORIDA PARK
Job Phone: 386-437-3122
Location Address: 64 FARRAGUT DR
Type: DR - DRIVEWAY
Issue Date: 11/30/2016
NOC: Unknown
Applicant name: TERRY MARTIN MCNITT JR
Owner: SMT PROPERTIES GROUP LLC

Address

PO BOX 351016

PALM COAST, FL 32135

Lot: 0060
Contracted Stated Job Value: ¤2,400.00
Job Description: DRIVEWAY
Type: CN

Contractor

VERDEGO LLC
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 789

BUNNELL, FL 32110

CGC1506752 (Exp: 08/31/2026) 386-437-3122 386-437-6883

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 05/12/2017 APPROVED RGROSS
Note: THIS IS A REINSPECTION. APPROVED
ROW - FINAL INSPECTION 05/12/2017 APPROVED RGROSS
Note: THIS IS A REINSPECTION. APPROVED
ROW - FINAL INSPECTION 05/08/2017 Disapproved -FEE REQUIRED CTROHA
Note: no permit package on site
ROW - FINAL APRON (AFTER POUR) 05/08/2017 Disapproved - NO FEE CTROHA
Note: no permit package on site
ROW - FINAL APRON (AFTER POUR) 02/09/2017 Disapproved -FEE REQUIRED RGROSS
Note: MISSING DOCUMENTATION. NO SWALE OR SITE PLAN ON SITE. REMOVE ASPHALT AT THE END OF THE DRIVEWAY AND HOT PATCH. SEE ATTACHED PHOTO'S
U -UTILITY RESIDENTIAL FINAL 02/09/2017 FINAL APPROVED JNICHOLS
ROW- PRE-APRON (PRE-POUR) 12/21/2016 APPROVED CTROHA
Note: THIS IS A REINSPECTION MEETS ALL REQUIREMENTS AT TIME OF INSPECTION READY TO POUR It is the BUILDER'S RESPONSIBILITY to recheck elevations and pipe size and to insure that an obstruction does not exist upstream and or downstream PRIOR to placement of concrete. DRIVEWAY ONLY SIDE WALK NOT ON PROPOSED SITE PLAN REVISE SITE PLAN BEFORE FINAL
ROW- PRE-APRON (PRE-POUR) 12/20/2016 Disapproved -FEE REQUIRED CTROHA
Note: Culvert pipe out of tolerance See swale plan compact soil in pad area

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/04/2016 11/14/2016
SW1 COMPLETE 11/04/2016 11/04/2016
UD1 COMPLETE 11/04/2016 11/14/2016
Note: The water meter is going to be relocated by the water distribution dept. please coordinate with Mr. Mike Hughes 386-986-2359
ZON COMPLETE 11/04/2016 11/04/2016

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/11/2017
REINSPECTION FEE ¤40.00 05/05/2017
REINSPECTION FEE ¤40.00 12/20/2016
ADMIN FEE ¤20.00 11/30/2016
SITE PLAN 20 ¤20.00 11/30/2016
SURCHARGE FS 533.721 ¤2.00 11/30/2016
SURCHARGE - FS 468.631 ¤2.00 11/30/2016
STORM WATER PERMIT FEES ¤40.00 11/30/2016
Fees Total Due: ¤0.00 Total Paid: ¤204.00