Permit #2016110286

Permit Details

Status: COED

Parcel Id: 06-12-31-5825-00010-0100
Block: 00010
Subdivision: 2111 - TOWN CENTER PHASE II
Job Phone: (386)677-8736
Location Address: 145 CITY PL BLDG 1
Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION
Issue Date: 12/14/2016
NOC: RECORDED
Applicant name: LEONARD MARINACCO
Owner: FLORIDA HEALTH CARE PLAN, INC

Address

1340 RIDGEWOOD AVENUE

HOLLY HILL, FL 32117

Lot: 0100
Contracted Stated Job Value: ¤524,000.00
Job Description: UNITS 100-103-- INTERIOR BUILDOUT MEDICAL OFFICE SPACE
Type: CN

Contractor

BOMAR CONSTRUCTION INC
Status Location Address State License Number Phone Fax
INACTIVE

27 S ORCHARD STREET

ORMOND BEACH, FL 32174

CGC015648 (Exp: 08/31/2022) (386)677-8736 (386)677-7726

Sub Contractors

TRUMAN E GAILEY JR
Status Location Address State License Number Phone Fax
ACTIVE

231 Jean St.

DAYTONA BEACH, FL 32114

EC0000265 (Exp: 08/31/2026) (386) 255-1418 (386)255-3429
DANIEL P HUCKS
Status Location Address State License Number Phone Fax
CANCEL

400 N. U.S. 1

Ormond Beach, FL 32174

CAC029376 (Exp: 08/31/2024) 386-672-8494 386-673-7856
ISAAC WALTER JOHNSTON
Status Location Address State License Number Phone
ACTIVE

887 BRENTWOOD DRIVE

Daytona Beach, FL 32117

CFC023634 (Exp: 08/31/2026) (386) 252-7047

Inspection History

Type Request Date Result Inspector
BUILDING FINAL 03/29/2017 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
FIRE FINAL 03/29/2017 Disapproved - NO FEE JHINDMAN
Note: THIS IS A REINSPECTION Fire alarm inspection must be complete before this inspection can be completed.
FIRE FINAL 03/29/2017 FINAL APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
BUILDING FINAL 03/23/2017 Disapproved -FEE REQUIRED JHINDMAN
Note: 1. Install all doors for inspection 5th ed. FBC Accessibility 404. 2. Provide unit address per 5th ed. FBC 501.2.
FIRE FINAL 03/23/2017 Disapproved - NO FEE JHINDMAN
Note: Fire sprinklers and all doorways must be complete.
PLUMBING FINAL 03/23/2017 APPROVED JGIBSON
ELECTRIC FINAL 03/23/2017 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
HVAC FINAL 03/17/2017 APPROVED JHINDMAN
U - UTILITY COMMERCIAL FINAL 03/17/2017 APPROVED DSPENCER
ELECTRIC FINAL 03/17/2017 Disapproved -FEE REQUIRED RMARTIN
Note: APPROVED PANEL SCHEDULE DOES NOT MATCH CKT #, AND AMPERAGE SIZE OF WHAT IS INSTALLED, NEED REVISION ON SITE FOR INSPECTION
ABOVE CEILING 03/07/2017 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
ELECTRIC TEMP POLE 03/03/2017 APPROVED - AS NOTED RMARTIN
Note: ALL PANELS MDP ARE GOOD, ABLE TO LOCK ALL PANELS WITH KEY
ELECTRIC 2ND ROUGH 03/03/2017 APPROVED RMARTIN
ELECTRIC TEMP POLE 03/02/2017 APPROVED - AS NOTED RMARTIN
Note: EARLY POWER INSPECTION,TO METER ONLY STILL NEEDS TORQUING ON NEW DISCONNECT AND TRANSFER SWITCH NEED TO CALL IN EARLY POWER AGAIN CALLED FPL SPOKE TO SUSAN 9:50
ABOVE CEILING 03/01/2017 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION, all but x-ray room
MONOLITHIC SLAB 02/27/2017 APPROVED - AS NOTED CMINI
Note: generator slab
ABOVE CEILING 02/21/2017 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION. partial rooms at firewall
ABOVE CEILING 02/20/2017 Disapproved -FEE REQUIRED JHINDMAN
Note: not ready. rated walls are not sealed. remove temp lighting 5th ed. FBC 714 and 2011 NEC 590.3.
ELECTRIC 2ND ROUGH 02/10/2017 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
ELECTRIC 2ND ROUGH 02/03/2017 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION marked on plan
PLUMBING 2ND ROUGH 02/01/2017 APPROVED CMINI
Note: THIS IS A REINSPECTION
HVAC ROUGH 02/01/2017 APPROVED CMINI
PLUMBING 2ND ROUGH 01/30/2017 CANCELLED BY APPLICANT CMINI
Note: PER CONTRACTOR
ELECTRIC 2ND ROUGH 01/30/2017 PARTIALLY APPROVED RMARTIN
Note: MARKED ON PLAN WALLS ONLY, NEED REVISION ON ELECTRIC CHANGES BY ELECTRIC FINAL
FRAMING 01/27/2017 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION STUDDS
MONOLITHIC SLAB 01/12/2017 APPROVED CMINI
FRAMING 01/11/2017 PARTIALLY APPROVED CMINI
Note: STEEL FRAMING,
INSULATION 01/11/2017 APPROVED - AS NOTED CMINI
Note: PER CONTRAQCTOR. dimising wall
FOOTER 01/03/2017 APPROVED CMINI
PLUMBING 1ST ROUGH 12/22/2016 APPROVED CMINI
ELECTRIC TEMP POLE 12/20/2016 APPROVED RMARTIN
ELECTRIC TEMP POLE 12/15/2016 CANCELLED BY APPLICANT AIRS WEB

Review History

Department Status Date In Date Out
ELEC COMPLETE 03/20/2017 03/22/2017
ELEC COMPLETE 01/30/2017 01/31/2017
BLD COMPLETE 01/24/2017 01/30/2017
ELEC COMPLETE 01/24/2017 01/30/2017
PLUM COMPLETE 01/04/2017 01/04/2017
Note: No plumbing change.
BLD COMPLETE 12/28/2016 12/29/2016
ELEC COMPLETE 12/28/2016 12/29/2016
MECH COMPLETE 12/28/2016 01/04/2017
Note: Revision 2 dated 12-08-16- changed duct layout on sheet M1 due to wall relocation bet. nurses station and exam room.
BLD COMPLETE 12/21/2016 12/22/2016
MECH COMPLETE 12/05/2016 12/09/2016
PLUM COMPLETE 12/05/2016 12/09/2016
BLD COMPLETE 12/05/2016 12/13/2016
BLD COMPLETE 11/07/2016 11/09/2016
ELEC COMPLETE 11/07/2016 11/09/2016
FI1 COMPLETE 11/07/2016 11/08/2016
MECH HOLD 11/07/2016 11/10/2016
Note: 1. Provide outdoor air duct layout to all air handling units per FBCM 5th ed. 403.2. 2. The total distributed supply air of each hvac units does not match with its capacity. Coordinate for clarity per FBC 5th ed. 107.2.1. 3. Provide the amount of supply air in CFM(s) to exam #1, spot room and at hall opposite exam #1 per FBCM 5th ed. 601.1. 4. Provide duct material specifications, AHU/duct supports, tie down connections of condensers on roof per FBCM 5th ed. 603/FBC 5th ed. 1609. F.Reodica - 386-986-4734.
PLUM HOLD 11/07/2016 11/14/2016
Note: 1. Provide domestic water (hot and cold) riser diagram per FBC 5th ed. 107.3.5. 2. Provide existing sanitary drain line where the new fixture drains are connected for clarity per FBC 5th ed. 107.2.1. 3. The partial sanitary riser diagrams do not match with the location description shown on plan. Coordinate for clarity per FBC 5th ed. 107.2.1. 4. Identify all plumbing fixtures for clarity per FBC 5th ed.107.2.1. 5. Provide material specifications of DWV and domestic water (hot and cold) per FBCP 5th ed. 702/605/902. 5. Provide service sink per FBCP 5th ed. 403.
UD1 COMPLETE 11/07/2016 11/15/2016
Note: These units are individually plumbed to a meter room. To avoid multiple meters the plumbing will require manifolding the all units together in the meter room
ZON COMPLETE 11/07/2016 11/07/2016
SW1 COMPLETE 11/07/2016 11/09/2016

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 03/28/2017
REVISION ¤40.00 03/22/2017
REVISION ¤40.00 03/22/2017
REVISION ¤40.00 03/22/2017
REVISION ¤40.00 03/22/2017
REVISION ¤40.00 03/22/2017
REINSPECTION FEE ¤40.00 03/22/2017
REINSPECTION FEE ¤40.00 03/22/2017
ADMIN COMMERCIAL ¤60.00 12/14/2016
INSPECTION - COMMERCIAL ADD ¤3,668.00 12/14/2016
ELECTRIC FEE ¤374.40 12/14/2016
MECHANICAL FEE ¤374.40 12/14/2016
PLAN CHECK FEE ¤602.60 12/14/2016
PLUMBING FEE ¤374.40 12/14/2016
SITE PLAN 20 ¤20.00 12/14/2016
SURCHARGE FS 533.721 ¤27.09 12/14/2016
SURCHARGE - FS 468.631 ¤27.09 12/14/2016
Fees Total Due: ¤0.00 Total Paid: ¤5,847.98