I want to search for...
Permit #2016110287
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00600-0030 |
| CONDITIONED SPACE: 1691 sqft |
| GARAGE: 430 sqft |
| OPENED PORCH (WITH ROOF) : 184 sqft |
| OPENED PORCH (WITH ROOF) : 30 sqft |
| Total Square Footage: 2335 sqft |
| Block: 00600 |
| Subdivision: - |
| Job Phone: 386-449-9413 |
| Location Address: 12 SMITH TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/20/2017 |
| NOC: RECORDED |
| Applicant name: STEVE HARKINS |
| Owner: BROWN, DONALD & PHYLLIS |
|
Address 12 SMITH TR PALM COAST, FL 32164 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤210,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
HARKINS CUSTOM CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
665 STREET TRAIL BUNNELL, FL 32110 |
CBC1253997 (Exp: 08/31/2026) | 386-449-9413 |
Sub Contractors
JERRY F TORDEUR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
4244 JACKSON ST Port Orange, FL 32119 |
CFC033863 (Exp: 08/31/2020) | (386) 761-3526 | (386)761-0132 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
ROBERT JOHN TROWBRIDGE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3801 Long Grove Lane Port Orange, 32119 |
CAC057234 (Exp: 08/31/2024) | (386) 767-9735 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 09/21/2017 | FINAL APPROVED | MBACON |
| ROW - FINAL INSPECTION | 09/20/2017 | APPROVED | CTROHA |
| Note: corrections made | |||
| BLD - BUILDING FINAL | 09/20/2017 | FINAL APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 09/18/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: THIS IS A REINSPECTION/ Provide access to tub motor and electric/Attic access cover must be rated for flame spread | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 09/15/2017 | APPROVED - AS NOTED | CTROHA |
| Note: *****************THIS CODE IS NOT TO BE USED ************************************* | |||
| ROW - FINAL APRON (AFTER POUR) | 09/15/2017 | APPROVED | CTROHA |
| Note: FINAL SURVEY SHOWS CULVERT PIPE AND SWALE IN TOLERANCE | |||
| ROW - FINAL INSPECTION | 09/15/2017 | Disapproved -FEE REQUIRED | CTROHA |
| Note: REMOVE ALL CONSTRUCTION DEBRIS FROM ADJACENT LOTS AND AT THE REAR OF THE PROPERTY CLEAN OUT CULVERT ENDS SOD ADJ SWALE WITH BAHIA SOD AND MATCH EXISTING GRADE WHERE THE DUMPSTER AND PORT-O-LET WERE SITTING | |||
| STORMWATER FINAL | 09/15/2017 | APPROVED | CTROHA |
| Note: FINAL SURVEY SHOWS FINAL SWALE GRADE IN TOLERANCE | |||
| BLD - BUILDING FINAL | 09/15/2017 | CANCELLED BY APPLICANT | JMONTARULI |
| Note: No power yet | |||
| FINAL SURVEY (OFFICE USE ONLY) | 09/14/2017 | APPROVED | JHINDMAN |
| ROW - FINAL INSPECTION | 08/30/2017 | CANCELLED BY APPLICANT | CTROHA |
| Note: CALLED IN | |||
| STORMWATER FINAL | 08/30/2017 | CANCELLED BY APPLICANT | CTROHA |
| Note: CALLED IN | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 08/30/2017 | CANCELLED BY APPLICANT | CTROHA |
| Note: CALLED IN | |||
| ROW - DRAINAGE | 08/25/2017 | APPROVED | CTROHA |
| Note: WORK COMPLETE | |||
| ELECTRIC - EARLY POWER | 08/23/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION SPOKE TO SUSAN FPL RELEASED EARLY POWER 10:50 | |||
| ROW - DRAINAGE | 08/22/2017 | Disapproved - NO FEE | CTROHA |
| Note: PUT UP SILT FENCE IN THE SWALE ON BOTH SIDES OF THE PROPERTY THERE IS OIL RESIDUE IN THE NEIGHBORS SWALE THAT MAY OR MAY NOT HAVE COME FROM THE CONSTRUCTION MOVE KNIGHT JON BOY ON TO YOUR LOT WE WILL REINSPECT ON FRIDAY THE 25 | |||
| ROW - FINAL APRON (AFTER POUR) | 08/21/2017 | Disapproved -FEE REQUIRED | CTROHA |
| Note: *NOT READY FOR INSPECTION* NO FINAL SURVEY SOD IS NOT IN FORM BOARDS HAVE NOT BEEN REMOVED | |||
| GRAVITY SEWER TEST | 08/16/2017 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 08/10/2017 | APPROVED - AS NOTED | CTROHA |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. ON SITE WITH BUILDER MAKING CORRECTIONS TO FORM BOARDS | |||
| U - SEWER TIE IN | 08/07/2017 | APPROVED | MBACON |
| INSULATION | 07/06/2017 | APPROVED | DROCKWELL |
| LATH/BRICK/ WATER BARRIER | 06/29/2017 | APPROVED | DROCKWELL |
| ALL ROUGH | 06/22/2017 | APPROVED - AS NOTED | DROCKWELL |
| Note: Frame service panel | |||
| FRAMING | 06/22/2017 | APPROVED | DROCKWELL |
| ELECTRIC - EARLY POWER | 06/21/2017 | Disapproved - NO FEE | DROCKWELL |
| Note: No tug here.This is fed over-head.Cannot call early power until All-rough is approved and house is in final stages | |||
| ROOF VALLEY & METAL | 05/30/2017 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/26/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/25/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Garage bearing wall per plan detail/Block flat top trusses osb cannot exceed 24in span | |||
| TIE BEAM / LINTEL | 05/05/2017 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 04/28/2017 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 04/07/2017 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/04/2017 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/07/2017 | 09/14/2017 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 08/29/2017 | 09/01/2017 |
| Note: Held By: WMILLER final s Need to meet Minimum drainage from home to 10ft out, at back, and front left of home. STORM WATER RUN-OFF… FBC R401.3 DRAINAGE… lots shall be graded to drain surface water away from foundation walls. The grade shall fall a minimum of 6 inches within the first 10 feet. | |||
| ZON | COMPLETE | 08/11/2017 | 08/13/2017 |
| Note: Released By: TAWILLIAMS | |||
| SW1 | COMPLETE | 04/27/2017 | 04/28/2017 |
| Note: Released By: JHINDMAN foundation s | |||
| PLUM | COMPLETE | 03/21/2017 | 03/22/2017 |
| Note: Revised sanitary riser diagram. | |||
| BLD | COMPLETE | 03/06/2017 | 03/07/2017 |
| ELEC | COMPLETE | 03/06/2017 | 03/07/2017 |
| PLUM | HOLD | 03/06/2017 | 03/08/2017 |
| Note: Provide revised sanitary riser diagram to match with revised floor plan with signature and license number of plumbing contractor per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734 | |||
| MECH | COMPLETE | 01/13/2017 | 01/19/2017 |
| MECH | HOLD | 01/04/2017 | 01/10/2017 |
| Note: Submitted correction for hvac plan shall have signature and license number of hvac contractor per FBC 5th ed, 107.3.4.2. F.Reodica- 386-986-4734. | |||
| URB | COMPLETE | 12/05/2016 | 12/07/2016 |
| UD1 | COMPLETE | 12/05/2016 | 12/06/2016 |
| Note: This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 12/05/2016 | 12/05/2016 |
| ELEC | COMPLETE | 12/05/2016 | 12/13/2016 |
| PLUM | COMPLETE | 12/05/2016 | 12/08/2016 |
| MECH | HOLD | 12/05/2016 | 12/08/2016 |
| Note: 1. Supply air duct connection to diffusers serving kitchen and dining room are missing on submitted hvac plan. Provide them for clarity per FBC 5th ed. 107.2.1. 2. Provide signature of the builder on energy performance level (EPL) display card per FBCEC 5th ed. R401.3 as previously requested.. 3. Provide sensible and latent capacity of selected hvac units per FBCEC R403.6.1 as previously requested or complete the information on heating/cooling load summary on energy calculations. F.Reodica -386-986-4734. | |||
| BLD | COMPLETE | 11/07/2016 | 11/08/2016 |
| ELEC | HOLD | 11/07/2016 | 11/08/2016 |
| Note: 1. Provide electrical load calculations. 2011 NEC art. 220. J. Hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 11/07/2016 | 11/15/2016 |
| MECH | HOLD | 11/07/2016 | 11/08/2016 |
| Note: 1. Provide hvac plan either prepared by design professional or hvac contractor with his signature and license number indicated on plan per FBC 5th ed. 105.3.1.2. 2. Provide signature of the builder on energy performance level (EPL) display card per FBCEC 5th ed. R401.3. 3. Provide manufacture, model number of outdoor and indoor units, sensible and total cooling capacity of selected hvac units per FBCEC R403.6.1. F.Reodica -386-986-4734. | |||
| PLUM | HOLD | 11/07/2016 | 11/08/2016 |
| Note: Provide sanitary riser diagram either prepared by design professional or plumbing contractor with his signature and license number indicated on the riser per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| SW1 | COMPLETE | 11/07/2016 | 11/08/2016 |
| UD1 | HOLD | 11/07/2016 | 11/08/2016 |
| Note: PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. PEP Panel requires dedicated 20 amp service. | |||
| ZON | HOLD | 11/07/2016 | 11/08/2016 |
| Note: 1)Landscaping plan must be separate from the site plan 2)Driveway will be concrete or pavers? 3)What type of sod? If St.Augustine indicate irrigation 4)One additional code tree is required | |||
| URB | HOLD | 11/07/2016 | 11/08/2016 |
| Note: 1: Need the type of sod being used if St Augustine indicate 100% irrigation being installed. 2: Need to add 1 code tree no credit given for pigmy date palm. 3: If using a site plan for a landscape plan need to write in Bold ( For Landscape Use Only) as a header on the plan. 4: Need a plant and tree legend indicating the caliper size and height of trees, And the container size and quantity of all. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/20/2017 |
| REINSPECTION FEE | ¤40.00 | 09/20/2017 |
| REINSPECTION FEE | ¤40.00 | 08/29/2017 |
| REINSPECTION FEE | ¤40.00 | 08/29/2017 |
| REVISION | ¤40.00 | 03/28/2017 |
| REVISION | ¤40.00 | 03/28/2017 |
| SITE PLAN 20 | ¤20.00 | 01/20/2017 |
| SURCHARGE FS 533.721 | ¤16.78 | 01/20/2017 |
| SURCHARGE - FS 468.631 | ¤16.78 | 01/20/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/20/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 01/20/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤428.00 | 01/20/2017 |
| ADMIN FEE | ¤20.00 | 01/20/2017 |
| ELECTRIC FEE | ¤188.40 | 01/20/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 01/20/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 01/20/2017 |
| IMPACT FEE PARKS | ¤849.24 | 01/20/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/20/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 01/20/2017 |
| MECHANICAL FEE | ¤188.40 | 01/20/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/20/2017 |
| PLAN CHECK FEE | ¤85.60 | 01/20/2017 |
| PLUMBING FEE | ¤188.40 | 01/20/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,134.91 |